2005 Washington Revised Code RCW 36.21.070: New construction building permits — Appraisal of building.

    Upon receipt of a copy of a building permit, the county assessor shall, within twelve months of the date of issue of such permit, proceed to make a physical appraisal of the building or buildings covered by the permit.

    [1989 c 246 § 3; 1987 c 134 § 1; 1963 c 4 § 36.21.070. Prior: 1955 c 129 § 4.]

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.