2005 Washington Revised Code RCW 81.88.080: Pipeline mapping system — Commission specifications and evaluations.

    (1) The commission shall require hazardous liquid pipeline companies, and gas pipeline companies with interstate pipelines, gas transmission pipelines, or gas pipelines operating over two hundred fifty pounds per square inch gauge, to provide accurate maps of their pipeline to specifications developed by the commission sufficient to meet the needs of first responders including installation depth information when known.

         (2) The commission shall evaluate the sufficiency of the maps and consolidate the maps into a statewide geographic information system. The commission shall assist local governments in obtaining hazardous liquid and gas pipeline location information and maps. The maps shall be made available to the one-number locator services as provided in chapter 19.122 RCW. The mapping system shall be consistent with the United States department of transportation national pipeline mapping program.

         (3) The mapping system shall be completed by January 1, 2006, and periodically updated thereafter. The commission shall develop a plan for funding the geographic information system and report its recommendations to the legislature by December 15, 2000.

    [2000 c 191 § 7.]

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.