View Our Newest Version Here

2005 Washington Revised Code RCW 60.24.110: Limitation of action.

    No lien provided for in this chapter binds any saw logs, spars, piles or other timber, or lumber and shingles, for a longer period than eight calendar months after the claim as herein provided has been filed, unless a civil action be commenced in a proper court, within that time, to enforce the same: PROVIDED, HOWEVER, That in case such civil action so commenced should for any cause other than the merits, be nonsuited or dismissed, then the lien shall continue for the term of one calendar month, if the said eight months have expired, to permit the commencement of another action thereon, which shall be as effective in prolonging the lien as if it had been entered during the term of eight months hereinbefore stated.

    [1893 c 132 § 10; RRS § 1171. Prior: Code 1881 § 1950; 1879 p 100 § 5; 1877 p 218 § 12.]

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.