2005 Washington Revised Code RCW 39.10.070: Project management and contracting requirements. (Effective until July 1, 2007.)

    (1) A public body utilizing the alternative public works contracting procedures authorized under *RCW 39.10.050 and 39.10.060 shall provide for:

    (a) The preparation of appropriate, complete, and coordinated design documents consistent with the procedure utilized;

    (b) To the extent appropriate, an independent review of the contract documents through value engineering or constructability studies prior to bid or proposal solicitation;

    (c) Reasonable budget contingencies totaling not less than five percent of the anticipated contract value;

    (d) To the extent appropriate, on-site architectural or engineering representatives during major construction or installation phases;

    (e) Employment of staff or consultants with expertise and prior experience in the management of comparable projects; and

    (f) Contract documents that include alternative dispute resolution procedures to be attempted prior to the initiation of litigation.

    (2) A public body utilizing the alternative public works contracting procedures under *RCW 39.10.050 and 39.10.060 may provide incentive payments to contractors for early completion, cost savings, or other goals if such payments are identified in the request for proposals.

    [1994 c 132 § 7.]

Notes:
         *Reviser's note: RCW 39.10.050 and 39.10.060 were repealed by 2001 c 328 § 7.

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.