There Is a Newer Version
of
the Revised Code of Washington
2005 Washington Revised Code RCW 36.54.015: Ferries — Fourteen year long range improvement plan — Contents.
The legislative authority of every county operating ferries shall prepare, with the advice and assistance of the county engineer, a fourteen year long range capital improvement plan embracing all major elements of the ferry system. Such plan shall include a listing of each major element of the system showing its estimated current value, its estimated replacement cost, and its amortization period.
[1975 1st ex.s. c 21 § 2.]
Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.