2005 Washington Revised Code RCW 18.104.050: Reports of well construction or decommissioning.

    (1) Any person authorized by this chapter to construct or decommission a well shall furnish a well report to the director within thirty days after the completion of the construction or decommissioning of a well. The director, by rule, shall prescribe the form of the report and the information to be contained therein.

         (2) In the case of a dewatering well project:

         (a) A single well construction report may be submitted for all similar dewatering wells constructed with no significant change in geologic formation; and

         (b) A single well decommissioning report may be submitted for all similar dewatering wells decommissioned that have no significant change in geologic formation.

    [2005 c 84 § 3; 1993 c 387 § 8; 1971 ex.s. c 212 § 5.]

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.