SIF Energy, LLC v. Dept. of Energy

Annotate this Case
Download PDF
FILED: December 30, 2015 IN THE COURT OF APPEALS OF THE STATE OF OREGON SIF ENERGY, LLC, an Oregon limited liability company, Petitioner-Appellant, v. STATE OF OREGON, by and through its Department of Energy, and BOB REPINE, in his official capacity as Director of the Oregon Department of Energy, Respondents-Respondents. Linn County Circuit Court 102273 A150875 Thomas McHill, Judge. Argued and submitted on May 20, 2014. Frederick A. Batson argued the cause for appellant. With him on the opening brief were Dan Webb Howard and Gleaves Swearingen Potter & Scott LLP. With him on the reply brief was Gleaves Swearingen LLP. Stephanie L. Striffler, Assistant Attorney General, argued the cause for respondents. With her on the brief were Ellen F. Rosenblum, Attorney General, and Anna M. Joyce, Solicitor General. Before Armstrong, Presiding Judge, and Nakamoto, Judge, and Egan, Judge. NAKAMOTO, J. Reversed and remanded. 1 NAKAMOTO, J. 2 This case concerns the proper amount of tax credit that petitioner should 3 have received for its renewable energy facility under Oregon's business energy tax credit 4 program. A business energy tax credit is calculated based on the "certified cost" of 5 constructing such a facility, as determined by the Oregon Department of Energy. 6 Petitioner built a renewable energy facility for which it was eligible for a business energy 7 tax credit. Although petitioner's actual construction cost was more than its estimated 8 cost, the department used the estimated cost as the certified cost for tax credit purposes. 9 Petitioner challenged that cost certification order in the circuit court, and it now appeals a 10 judgment affirming the department's order. Petitioner argues that, by statute, the 11 department was required to certify all of petitioner's actual, eligible costs, up to 110 12 percent of the estimated cost. The department has interpreted the statute differently; it 13 contends that the statute granted the agency discretion to certify any amount of actual, 14 eligible costs between 100 and 110 percent of petitioner's estimated cost. We conclude 15 that the statute required the department to certify all of petitioner's actual, eligible costs, 16 up to 110 percent of the estimated cost; therefore, the trial court erred in affirming the 17 department's cost certification order. Accordingly we reverse and remand. 18 19 I. BACKGROUND A business energy tax credit is a credit against Oregon income taxes based 20 on the "certified cost" of capital investments in areas such as renewable energy resources. 21 ORS 315.354. For a taxpayer to claim the credit, the Director of the Oregon Department 1 1 of Energy must issue "final certification" of a facility after the investment is completed, 2 which establishes eligibility for the credit. Former ORS 469.215 (2009), renumbered as 3 ORS 469B.161 (2011);1 ORS 315.354. Applying for the requisite final certification is a 4 two-step process. First, the owner of a facility must apply for a "preliminary certificate," 5 by submitting a project description and cost estimate to the department. ORS 469.205(1), 6 (2)(b), (d). If the department approves the project, it issues a preliminary certification 7 that approves the amount of project costs eligible for a business energy tax credit. ORS 8 469.210(2); OAR 330-090-0130(3)(b)(A). Second, once the project is completed, the 9 owner of the facility must apply for the final certification, by submitting, among other 10 things, verification from a certified public accountant (CPA) of the "actual cost" of the 11 project. ORS 469.215(2) - (3). 12 Then, before the owner can receive a tax credit, the department must 13 "certify the facility," ORS 469.215(6); ORS 315.354, an action that includes 14 "certification of the actual cost of the facility," ORS 469.215(4). "However, the director 15 may not certify an amount for tax credit purposes which is more than 10 percent in excess 16 of the amount approved in the preliminary certificate issued for the facility." ORS 17 469.215(4). This case centers on the interaction between those final certification 18 procedures and concerns the department's certification obligations when the actual cost of 1 Unless otherwise noted, all references in this opinion are to former ORS 469.185 to 469.225 (2009), the version of the business energy tax credit statutes applicable at all times relevant to this case. The statutes have since been amended and renumbered to ORS 469B.130 to 469B.171. 2 1 constructing a facility is more than the estimated cost. 2 The facts in this case are undisputed. In 2008, the department issued a 3 preliminary certification for petitioner's biogas facility, approving $8,879,962 in 4 projected construction costs. Petitioner completed its facility in 2009 and submitted its 5 application for final certification. That application contained the required CPA 6 verification of petitioner's actual construction costs, which were $11,098,501. Thus, 7 petitioner's claimed actual construction costs were $2,218,539--or about 25 percent--more 8 than petitioner's estimated costs. 9 When petitioner submitted its 2009 application for final certification, the 10 department's administrative rule provided that a final certification "may be up to 10 11 percent more than the amount approved in the preliminary certification." Former OAR 12 330-090-0130(9)(b)(A) (June 20, 2008). However, while petitioner's application for final 13 certification was pending, the department promulgated temporary rules deleting that 14 provision. See former OAR 330-090-0133(1) (Nov 3, 2009) (preserving final 15 certification process rule but eliminating cost overrun provision). The new rules were 16 made applicable to all pending applications and future applications, for which no final 17 certification determination had been made. Former OAR 330-090-0105(3) (Nov 3, 18 2009). 19 The department finally certified petitioner's facility in 2010, using 20 petitioner's estimated cost of $8,879,962 to calculate petitioner's tax credit. Petitioner 21 requested that the agency reconsider that amount, asserting that ORS 469.215(4) 3 1 compelled the agency to calculate petitioner's tax credit by using $9,767,958.20--110 2 percent of the petitioner's approved estimated cost. The department denied the request, 3 explaining that it had "discontinued the practice of issuing a tax credit for more than the 4 pre-certified amount" when it promulgated the temporary rules in 2009. 5 Petitioner sought review of the department's order in the circuit court, 6 pursuant to ORS 183.484 (providing jurisdiction for judicial review of orders in other 7 than contested cases), and both parties filed cross-motions for partial summary judgment. 8 The court granted partial summary judgment for the department and denied it for 9 petitioner, in effect affirming the department's order and concluding that "the law and 10 OAR in effect at the time of submission clearly * * * provided that discretion would be 11 allowed in determining whether or not a cost overrun would be considered for the tax 12 credit." 13 II. ANALYSIS 14 On appeal, petitioner raises three assignments of error concerning the 15 court's grant of the department's motion for summary judgment and denial of petitioner's 16 own motion on its petition for review in the circuit court. The dispositive legal issue, 17 however, is whether ORS 469.215(4) conferred discretion upon the department to finally 18 certify, for tax credit purposes, petitioner's actual, eligible costs in an amount less than 19 110 percent of the preliminarily certified amount. Because we agree with petitioner that 20 it did not, we do not reach petitioner's other arguments.2 2 Our recent decision in Cascade Kelly Holdings, LLC v. Dept. of Energy, 275 Or 4 1 On appeal from summary judgment, we "review the evidence and all 2 reasonable inferences in the light most favorable to the nonmoving party and determine 3 whether the moving party is entitled to judgment as a matter of law. In the case of cross- 4 motions for summary judgment, we determine which party is entitled to judgment as a 5 matter of law." Powell v. Bunn, 185 Or App 334, 338, 59 P3d 559 (2002), rev den, 336 6 Or 60 (2003) (internal citations omitted). In determining whether either party was 7 entitled to judgment as a matter of law, we must review the court's judgment to determine 8 whether it correctly assessed the department's actions under ORS 183.484(5), which 9 provides the standards for judicial review of an order in other than a contested case. 10 G.A.S.P. v. Environmental Quality Commission, 198 Or App 182, 187, 108 P3d 95, rev 11 den, 339 Or 230 (2005). "In practical effect, that means that we directly review the 12 agency's order for compliance" with those standards. Id. Those standards provide, 13 relevant to this case, that a reviewing court 14 15 16 17 "(a) * * * may affirm, reverse or remand the order. If the court finds that the agency has erroneously interpreted a provision of law and that a correct interpretation compels a particular action, it shall: "(A) Set aside or modify the order; or App 500, ___ P3d ___ (2015), also concerned certification under the 2009 version of the business energy tax credit statutes. In that case, we held that the underlying controversy was moot, in light of the legislature's 2012 enactment of ORS 315.357(2), a "sunset" provision phasing out the business energy tax credit. Id. at 509-11. That sunset enactment provides that "[a]ny preliminary certification issued for a facility * * * that remains outstanding as of July 1, 2011, shall expire on July 1, 2014." ORS 315.357(2). Because the department issued petitioner's final certification in 2010, the sunset enactment does not affect the justiciability of this appeal. 5 1 2 "(B) Remand the case to the agency for further action under a correct interpretation of the provision of law. 3 4 "(b) The court shall remand the order to the agency if it finds the agency's exercise of discretion to be: 5 "(A) Outside the range of discretion delegated to the agency by law; 6 7 8 "(B) Inconsistent with an agency rule, an officially stated agency position, or a prior agency practice, if the inconsistency is not explained by the agency; or 9 10 11 "(C) Otherwise in violation of a constitutional or statutory provision." ORS 183.484(5). 12 Fundamentally, the parties disagree over the meaning of ORS 469.215(4), 13 which concerned the department's issuance of a final certificate, and provided, in relevant 14 part: 15 16 17 18 19 20 21 22 "The director shall act on an application for certification before the 60th day after the filing of the application under this section. The director may issue the certificate together with such conditions as the director determines are appropriate to promote the purposes of [the business energy tax credit program]. * * * The action of the director shall include certification of the actual cost of the facility. However, the director may not certify an amount for tax credit purposes which is more than 10 percent in excess of the amount approved in the preliminary certificate issued for the facility."3 23 (Emphasis added.) Petitioner argues that, in light of the statutory direction that the 3 The specific text at issue on review has since been amended to read, "However, the director may not certify an amount for tax credit purposes that is more than the amount approved in the preliminary certificate issued for the facility." See ORS 469B.161(4) (2013); Or Laws 2010, ch 76, § 12(4) (amending ORS 469B.161(4)). As the parties recognize, subsequent legislative enactments do not aid our interpretation of a statute. See DeFazio v. WPPSS, 296 Or 550, 561, 679 P2d 1316 (1984) ("The views legislators have of existing law may shed light on a new enactment, but [are] of no weight in interpreting a law enacted by their predecessors."). 6 1 "action of the director shall include certification of the actual cost of the facility," the 2 following sentence required the department to certify all actual, eligible costs, up to 110 3 percent of the amount approved in the preliminary certificate. The department argues 4 that, instead, the phrase "may not certify an amount for tax credit purposes" gave the 5 department discretion to certify any amount of actual, eligible costs, between 100 and 6 110 percent of the amount approved in the preliminary certificate. (Emphasis added.) 7 The department views "certification of the actual cost" and certification "for tax credit 8 purposes" as two separate steps, and the circuit court agreed with that interpretation. 9 The interpretation of a statute is a question of law, and we review the 10 court's interpretation for legal error. State v. Thompson, 328 Or 248, 256-57, 971 P2d 11 879, cert den, 527 US 1042 (1999). In interpreting the statute at issue, our ultimate goal 12 is to discern the legislature's intent and, to the extent possible, give effect to that intent. 13 ORS 174.020; State v. Gaines, 346 Or 160, 165, 206 P3d 1042 (2009). We interpret the 14 text of the statute in context and examine available legislative history, to the extent that it 15 is helpful in discerning legislative intent. Gaines, 346 Or at 172-73. 16 A. 17 Text and Context of ORS 469.215(4) We begin our analysis with the text and context of the statute. Both 18 petitioner and the department offer plausible readings of the statutory text; however, we 19 ultimately agree with petitioner's interpretation. Based on the statutory text and context, 20 we conclude that ORS 469.215(4) required the department to certify all actual, eligible 21 costs, up to 110 percent of the amount approved in the preliminary certificate for three 7 1 2 reasons. First, from a grammatical standpoint, the last sentence of ORS 469.215(4), 3 beginning, "[h]owever, the director * * *," is most naturally read as a limitation on the 4 preceding sentence, which mandates that the director certify actual costs. In this context, 5 "however" is an adverb meaning "in spite of that : on the other hand : BUT." Webster's 6 Third New Int'l Dictionary 1097 (unabridged ed 2002). An adverb typically modifies the 7 verb phrase that immediately follows it--here, "may not certify." See State v. Christian, 8 354 Or 22, 28-29, 307 P3d 429 (2013) (construing adverb "recklessly" to modify the 9 phrase immediately following it). The word "however" indicates that the director's first 10 action ("shall" certify actual costs) is linked to the director's second action ("may not 11 certify * * * for tax credit purposes"). Stated another way, the statute directs that, in spite 12 of the director's obligation, as a general rule, to certify actual costs, a different rule 13 applies when actual costs exceed 110 percent of the preliminary estimate. That reading 14 indicates that certification "for tax credit purposes" is not a freestanding, independent 15 second calculation, as the department argues, but that it is a sub-step of the director's 16 mandatory cost certification action, in certain circumstances. In addition, the phrase 17 "certify for tax credit purposes" does not appear anywhere else in the business energy tax 18 credit statutes, which supports our interpretation that the term is limited to the cost 19 overrun situation and does not refer to a second, "certification for tax credit purposes" 20 step that is generally applicable. 21 Second, the phrase "may not certify" is more convincingly construed to be 8 1 an absolute limitation on the director's certification of actual costs, rather than an implied 2 grant of discretion to the director to secondarily calculate a certified cost for tax credit 3 purposes. As noted, that is partially because the word "however" links the "may not 4 certify" action to the "shall certify" action. As well, it is because of the specific meaning 5 of "may not certify" in legislative drafting. Both parties agree, as do we, that the phrase 6 "may not certify" places an express limit on the director's authority to act. "May not" is 7 an "expression[ ] of an absolute prohibition." ORS 174.100(4); see Office of Legislative 8 Counsel, Bill Drafting Manual § 4.3 (2014) (noting that, "[a]lthough ORS 174.100(4) 9 makes 'shall not' and 'may not' equivalent expressions of prohibition, the office has a 10 strong preference for 'may not'"); see also Burke v. DLCD, 352 Or 428, 436, 290 P3d 790 11 (2012) (looking to the Bill Drafting Manual for interpretive guidance); cf. Friends of 12 Columbia Gorge v. Columbia River, 346 Or 415, 426-27, 212 P3d 1243 (2009) 13 (construing permissive nature of "may"). 14 The department, however, argues that the express limit impliedly gives the 15 director discretion to act, so long as he or she does not violate the express prohibition. In 16 the department's view, if the legislative assembly had intended to mandate that the 17 director certify all costs up to 110 percent, the drafters would have used the verb "shall." 18 We disagree with that reading of "may not certify," because it inverts the presumption 19 that agencies do not have authority unless statutorily provided. See City of Klamath Falls 20 v. Environ. Quality Comm., 318 Or 532, 545, 870 P2d 825 (1994) (agencies are creatures 21 of statute, and they derive their discretionary authority, like all of their authority, from 9 1 statutory grants and general laws affecting administrative bodies).4 2 As multiple other parts of the business energy tax credit statutes indicate, 3 the legislative assembly knows how to affirmatively grant the department discretion. See, 4 e.g., ORS 469.200(2) ("the director may certify a lesser amount"); ORS 469.205(3) 5 ("[t]he director may refund the fee"); ORS 469.205(4) ("[t]he director may allow an 6 applicant to file the preliminary application"); ORS 469.210(1) ("[t]he Director * * * may 7 require the submission of plans"); ORS 469.225(1) ("the Director * * * may order the 8 revocation of the certificate"). See generally Office of Legislative Counsel, Bill Drafting 9 Manual § 4.3 (discussing use of "may" to authorize discretion). Most compellingly, ORS 10 469.215(4) itself distinguishes between mandatory and discretionary actions by 11 selectively using "shall" and "may": The director "shall" finally certify the actual cost of 12 the facility, but "may issue the certificate together with such conditions as the director 13 determines are appropriate to promote the purposes of" the business energy tax credit 14 statutes. ORS 469.215(4) (emphases added). The department asserts that, if the 15 legislature had intended to use actual costs as the "certified cost," "the legislature could 16 have clearly said so, by stating, for example, 'the Director shall certify for tax credit 4 For that reason, we are not persuaded by the department's reliance on other parts of the business energy tax credit statutes authorizing the department to promulgate rules governing the application process. See, e.g., ORS 469.215(1) ("A final certification may not be issued" unless the facility was constructed in accordance with "any applicable rules or standards adopted by the director."). The agency must exercise its rulemaking authority consistently with the business energy tax credit statutes, and, therefore, that general rulemaking authority is not a general grant of discretion to adopt rules contrary to the statutory text. See Garrison v. Dept. of Rev., 345 Or 544, 548-49, 200 P3d 126 (2008) (agency cannot, by administrative rule, "amend, alter, enlarge upon, or limit statutory wording so that it has the effect of undermining the legislative intent"). 10 1 purposes the amount of actual costs, up to 10 percent in excess of the amount approved in 2 the preliminary certificate.'" (Emphasis added.) We agree that that would have been 3 another way to write the statute. See Office of Legislative Counsel, Bill Drafting Manual 4 § 4.3 (2013) (directing legislative drafters, "[t]o impose an obligation to act, use 'shall'"). 5 However, the legislature's failure to unambiguously state that the agency must do 6 something does not necessarily imply that its intent was that the agency may do it. 7 Third, the regulatory structure of the business energy tax credit statutes, as 8 a whole, indicates that certification "for tax credit purposes" is a step related to 9 certification of actual costs, rather than an independent calculation. As discussed, 10 application for a final certificate is a two-step process. At the front end, applicants apply 11 for a preliminary certification. ORS 469.205. At that point, applicants notify the 12 department as to estimated costs and project specifications, ORS 469.205(2)(b), (d), and 13 the department has an opportunity to accept or deny those applications; see ORS 14 469.210(2) ("If the director determines that the proposed [project] is technically feasible 15 * * * and is in accordance with the provisions of ORS 469.185 to 469.225 and applicable 16 rules or standards * * *, the director shall issue a preliminary certificate approving" the 17 project.). After construction, the department issues--or declines to issue--a final 18 certificate, an action that "shall include certification of the actual cost of the facility." 19 ORS 469.215(4). In part, the statutes give the department express discretion to "certify" 20 less than the full cost of certain renewable energy investments, "[n]otwithstanding" a 21 provision capping overall preliminary certifications for those renewable energy projects 11 1 at $40 million annually, if specific "conditions exist at the time of the preliminary 2 certification." ORS 469.200(1)(b), (2) (emphasis added). In contrast, the statutes do not 3 expressly give the department discretion to certify a lesser amount, based on conditions 4 that occur after the preliminary certification. That discrepancy, too, suggests that the 5 department does not have general discretion at other points in the certification process. 6 B. 7 Legislative History of ORS 469.215(4) The legislative history of the business energy tax credit program bolsters 8 our interpretation that ORS 469.215(4) limits a mandatory duty, rather than grants the 9 agency discretion. First, the legislative history demonstrates that the legislature intended 10 the 10 percent cost overrun provision to be an adjunct to the total annual limit on the 11 amount of tax credits available. Second, the legislative history demonstrates legislative 12 intent to provide certainty for investors, a goal that petitioner's interpretation furthers 13 more effectively than the department's does. 14 When the business energy tax credit program was initially being 15 considered, some legislators were concerned about the program's potential fiscal impacts. 16 See, e.g., Tape Recording, House Committee on Environment and Energy, HB 2843 and 17 HB 3128, May 17, 1979, Tape 24, Side 1 (statements of Rep Thoop, Rep Schoon, and 18 Rep Fawbush). As a result, many of the provisions in HB 2843, the bill ultimately 19 enacted as the business energy tax credit program, were included to rein in the overall 20 credits available to investors. See, e.g., Tape Recording, House Committee on 21 Environment and Energy, HB 2843 and HB 3128, May 22, 1979, Tape 24, Side 2 12 1 2 3 (discussing purpose of committee amendments to HB 2843). For example, in section 5 of the original 1979 Act, the legislative assembly capped the aggregate facility costs that the department could certify annually: 4 5 6 7 8 9 "(1) The total of all costs of energy conservation facilities certified by the director for tax credits in any calendar year shall not exceed $30 million. If the applications exceed the $30 million limit, the director, in his discretion, shall determine the dollar amount certified for any facility and the priority between applications for certification based upon the criteria contained in sections 2 to 10 of this 1979 Act. 10 11 12 "(2) Not less than $5 million of the $30 million annual certification limit shall be allocated to facilities having a certified cost of $100,000 or less for any facility. 13 14 15 16 17 18 19 20 "(3) With respect to the balance of the annual certification, the maximum cost certified for any facility shall not exceed $10 million. However, if the applications certified in any calendar year do not total $25 million, the director, in his discretion, may increase the certified costs above the $10 million maximum for previously certified facilities. Such increases shall be allocated according to the director's determination of how the previously certified facilities meet the criteria of sections 2 to 10 of this 1979 Act. * * *" 21 Or Laws 1979, ch 512, § 5. Those capping provisions in section 5 were intended to limit 22 the overall fiscal impact of the business energy tax credit program and to ensure that no 23 single large project could consume all of the available credits. Tape Recording, House 24 Revenue Committee, HB 2843, June 1, 1979, Tape 41, Side 1 (statement of Dave 25 Philbrick, Oregon Department of Energy) (explaining each section of the bill to the 26 committee). To implement those goals, section 5 granted the department discretion to 27 certify less than actual costs under certain circumstances related to overall program costs. 28 In the event "the applications exceed the $30 million limit, the director, in his discretion, 29 shall determine the dollar amount certified for any facility and the priority between 13 1 applications for certification based upon the criteria" in the Act. Or Laws 1979, ch 512, § 2 5(1) (emphasis added). But, if the applications certified in any year did not total $25 3 million, the director "in his discretion" could "increase the certified costs above the $10 4 million maximum for previously certified facilities." Id. § 5(3). 5 6 7 8 9 10 11 12 Next, section 8 of the 1979 Act included the same 10 percent cost overrun cap at issue in this case, although it expressed the limitation slightly differently: "The director shall act on an application for certification before the 60th day after the filing of the application under this section. The action of the director shall include certification of the actual cost of the facility. However, in no event shall the director certify an amount for tax credit purposes which is more than 10 percent in excess of the amount approved in the preliminary certificate issued for the facility." 13 Id. § 8(4) (emphasis added). As the legislative history explains, that provision was 14 intended to support the overall program caps in section 5. As Dave Philbrick, from the 15 department, explained to the House Revenue Committee, 16 17 18 19 20 "[t]he final certification cannot be * * * in excess of 10 percent of the amount approved under the [preliminary] certification. This is important largely because of the $30 million limit * * * [. S]omebody coming in for the * * * [preliminary] certification could expect at most 10 percent more than [the amount preliminarily certified]." 21 Tape Recording, House Revenue Committee, HB 2843, June 1, 1979, Tape 41, Side 1 22 (statement of Dave Philbrick, Oregon Department of Energy) (emphasis added). Thus, 23 the 1979 Act contemplated that, in some cases, the department would certify, for tax 24 credit purposes, an amount less than the actual facility cost. See also Or Laws 1979, ch 25 512, § 8(5) ("[i]f the director * * * certifies a lesser actual cost of the facility than was 26 claimed in the application * * *"). Critically, though, the department's discretion to 14 1 certify less than actual facility costs was triggered by the total annual program limits and 2 express grants of discretion in section 5, rather than the 10 percent cost overrun provision 3 in section 8. 4 Section 8 was codified in ORS 469.215(4) (1979). In 2008, the legislative 5 assembly changed the disputed text from "in no event shall the Director certify an 6 amount" to "the director may not certify an amount." Or Laws 2008, ch 29, § 4(4). That 7 amendment appears to be a stylistic revision. See Office of Legislative Counsel, Bill 8 Drafting Manual § 4.3 (noting that, "[a]lthough ORS 174.100(4) makes 'shall not' and 9 'may not' equivalent expressions of prohibition, the office has a strong preference for 10 'may not'"). The department does not provide legislative history, and we are aware of 11 none, suggesting that the amendment was worded to convey new discretionary authority 12 upon the director. Therefore, we read ORS 469.215(4) consistently with its historical 13 function in the statutory scheme, and not as a freestanding grant of discretion to calculate 14 an amount "for tax purposes." 15 In addition to being consistent with the historical structure of the business 16 energy tax credit statutes, petitioner's interpretation furthers the twin legislative purpose 17 of providing certainty for investors. See generally Tape Recording, House Revenue 18 Committee, HB 2843, June 1, 1979, Tape 41, Side 1 (discussing need for investor 19 certainty). The business energy tax credit program was designed to incentivize 20 investment in alternative energy technologies, which involves many unknown variables. 21 See, e.g., id.; Or Laws 1979, ch 512, § 2 (stating that "it is the policy of the State of 15 1 Oregon to encourage the conservation of electricity, petroleum and natural gas by 2 providing tax relief for Oregon facilities that conserve energy resources"). And, in order 3 for such an incentive to work, businesses needed to be able to rely on actually receiving 4 the tax credit after making a substantial capital investment. See, e.g., Tape Recording, 5 House Committee on Environment and Energy, HB 2843 and HB 3128, May 17, 1979, 6 Tape 24, Side 1 (statements of Rep Fawbush and Rep Schoon). Legislators debated, at 7 length, how businesses would apply for the tax credit, whether applicants preliminarily 8 certified would receive the credit if their renewable energy technologies were ultimately 9 less effective than anticipated, and how the department would choose among applications 10 at the preliminary certification stage. See id. As previously discussed, the legislature 11 ultimately resolved those concerns by guiding the department's exercise of discretion in 12 choosing among competing applications when the program's overall costs were at issue. 13 See Or Laws 1979, ch 512, § 5(1). 14 In light of that legislative history, petitioner's interpretation better promotes 15 the purposes of ORS 469.215(4). The preliminary certification process, which requires 16 the department to certify eligible projected costs before an applicant invests in a project, 17 provides certainty for both the applicant and the agency. If the applicant complies with 18 the conditions of the preliminary certification, the applicant can expect to receive a tax 19 credit based on its actual investment, up to a point. And, the agency can plan for the 20 fiscal impact of that tax credit by evaluating projected costs for legitimacy, and by 21 choosing which projects to preliminarily certify based on their feasibility and other 16 1 statutory and regulatory criteria. See ORS 469.210(2). But the department's 2 interpretation introduces uncertainty into that process, because it allows the agency to 3 decide, after the fact and without clear guidelines, whether some cost overruns should be 4 certified, while others are not. That reading is inconsistent with the purposes of the 5 business energy tax credit program, and we do not believe that it is what the legislature 6 intended. 7 Because ORS 469.215(4) mandated that the department certify petitioner's 8 actual, eligible costs up to 110 percent of the preliminary estimate, petitioner was entitled 9 to judgment as a matter of law on that theory. Accordingly, the court incorrectly applied 10 the standards at ORS 183.484(4) when it affirmed the department's order, and it erred by 11 granting partial summary judgment to the department and denying partial summary 12 judgment to petitioner. 13 Reversed and remanded. 17

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.