THOMAS KENNEDY and KRISTIN KENNEDY,
UNPUBLISHED
August 4, 2011
Plaintiffs-Appellees/Cross
Appellants,
v
AUTO-OWNERS INSURANCE COMPANY and
HOME-OWNERS INSURANCE COMPANY,
No. 294955
Marquette Circuit Court
LC No. 07-045044-CK
Defendants-Appellants/Cross
Appellees.
Before: RONAYNE KRAUSE, P.J., and SERVITTO and GLEICHER, JJ.
PER CURIAM.
Defendants appeal as of right from an order granting plaintiffs’ motion for summary
disposition under MCR 2.116(C)(10) on the issue of insurance coverage. Plaintiffs cross-appeal
from an order granting defendants’ motion for summary disposition under MCR 2.116(C)(10)
regarding damages. We affirm in part, reverse in part and remand for further proceedings.
Plaintiffs’ unoccupied home sustained water damage as a result of two pipes bursting,
presumably after freezing and thawing. Plaintiffs’ homeowners insurance policy with defendants
excluded coverage for losses that occurred in unoccupied dwellings due to leakage from freezing
pipes, with exceptions. The relevant portion of the policy exclusion reads as follows:
Freezing of plumbing, heating, air conditioning or automatic fire
protection sprinkler systems or domestic appliances, or by discharge, leakage or
overflow from the system or appliance caused by freezing while the building is
vacant, unoccupied or in the course of construction unless you take precautions
to:
***
b. maintain heat in the building.
The trial court found the language requiring plaintiffs to “take precautions” ambiguous
because, in the context of the case, the phrase could mean that plaintiffs were required to take
either reasonable precautions, successful precautions, or some precautions. On appeal, both
-1-
parties argue that the phrase is not ambiguous, but they disagree regarding whether plaintiffs
took precautions.
A trial court’s determination of a motion for summary disposition is reviewed de novo.
Ormsby v Capital Welding, Inc, 471 Mich 45, 52; 684 NW2d 320 (2004). When reviewing a
motion brought under MCR 2.116(C)(10), the court considers the affidavits, depositions,
pleadings, admissions, and other evidence submitted by the parties in the light most favorable to
the non-moving party. Rose v Nat’l Auction Group, Inc, 466 Mich 453, 461; 646 NW2d 455
(2002). Summary disposition is appropriate if there is no genuine issue regarding any material
fact and the moving party is entitled to judgment as a matter of law. Id. The construction and
interpretation of the language in an insurance contract is a question of law that this Court also
reviews de novo. Citizens Ins Co v Pro-Seal Serv Group, Inc, 477 Mich 75, 80; 730 NW2d 682
(2007).
“Interpretation of an insurance policy ultimately requires a two-step inquiry: first, a
determination of coverage according to the general insurance agreement and, second, a decision
regarding whether an exclusion applies to negate coverage.” Hastings Mut Ins Co v Safety King,
Inc, 286 Mich App 287, 291; 778 NW2d 275 (2009). Insurance policies are construed utilizing
the same contract construction principles that apply to any contract. Royal Prop Group, LLC v
Prime Ins Syndicate, Inc, 267 Mich App 708, 714; 706 NW2d 426 (2005). An insurance policy
is enforced in accordance with its terms, Twichel v MIC Gen Ins Corp, 469 Mich 524, 534; 676
NW2d 616 (2004), and contractual terms must be construed in context and in accordance with
their commonly used meanings. Hastings Mut Ins Co, 286 Mich App at 294. If the contractual
language is unambiguous, courts must interpret and enforce the contract as written because an
unambiguous contract reflects the parties’ intent. Id. at 292. The Court will read the insurance
contract as a whole to effectuate the intent of the parties and enforce clear and specific
exclusions, however exclusions are strictly construed in favor of the insured. Tenneco Inc v
Amerisure Mut Ins Co, 281 Mich App 429, 444; 761 NW2d 846 (2008). The Court will not hold
an insurance company liable for a risk it did not assume. Frankenmuth Mut Ins Co v Masters,
460 Mich 105, 111; 595 NW2d 832 (1999).
A provision in a contract is ambiguous if it irreconcilably conflicts with another
provision, or when it is equally susceptible to more than a single meaning. Royal Prop Group,
LLC, 267 Mich App at 715. A court should not create ambiguity in an insurance policy by
contorting the plain meaning of a word or phrase that is specific and well-recognized and giving
it some alien construction for the purpose of benefiting an insured. Citizens Ins Co, 477 Mich at
82. The fact that a policy does not define a relevant term does not render the policy ambiguous.
Id. at 82-83. Rather, an undefined term is accorded its commonly understood meaning. Twichel,
469 Mich at 534. If an ambiguity in the contract cannot be resolved, it should be strictly
construed against the drafter. Tenneco Inc, 281 Mich App at 444.
In finding ambiguity, the trial court focused on the extent of the precautions, rather than
the meaning of “precautions to maintain heat in the building.” This phrase is not ambiguous
when given its ordinary meaning. The Court may consult dictionary definitions to ascertain the
plain and ordinary meaning of terms as they would appear to a reader of the contract. Hastings
Mut Ins Co, 286 Mich App at 294. A precaution is defined as “a measure taken in advance to
avert possible harm or misfortune.” Random House Webster’s College Dictionary (1997).
-2-
Here, plaintiffs were required to take advance measures to maintain heat in the building
in order to avert the possible harm of freezing pipes. The trial court found that plaintiffs did take
precautions by having several furnaces and utilizing a “winter watchman” temperature
monitoring device. In addition, plaintiffs state that they took the precautions of making regular
visits to the home and adding extra insulation when the home was built. However, the
precautions required by the policy are to maintain heat in the home, which fundamentally
requires a heat source. None of the listed precautions maintained heat. If the winter watchman
system performed ideally, it could, at best, alert an interested party that heat was not maintained
in the home. The same is true of the visits. Moreover, these alerts may not have been in advance
of the pipes freezing or the temperature falling because they may not have led to the discovery
until after the harm had occurred. In addition, having an insulated home with furnaces and a
temperature monitoring system, without having any heat in the home or fuel to run the furnaces,
would not have been precautions to maintain heat in order to prevent the pipes from freezing.
Evidence was presented that plaintiffs ran out of the propane that powered the furnaces and did
not have the propane tank refilled. Thus, it could be argued that plaintiffs took precautions to
monitor the heat, but did not demonstrate that precautions were taken to maintain heat in the
building by actually heating the building. Even though exclusionary provisions are strictly
construed against the insurer and in favor of the insured, Hastings Mut Ins Co, 286 Mich App at
292, here there was at least a genuine issue of material fact regarding whether plaintiffs took
advance measures to maintain heat in the building in order to avert the possible harm of freezing
pipes. The trial court thus erred in granting summary disposition to plaintiffs on this issue.
Defendants further argue that the trial court erred when it found immaterial the disputed
factual issue of whether plaintiffs ran out of propane to heat the home. However, as discussed
above, taking advance measures to maintain heat in the home in order to prevent the pipes from
freezing required heat to be in the home. In this case, whether the furnaces of the home were
providing heat in order to maintain the temperature of the home was a material question.
Therefore, whether there was propane to fuel operation of the furnaces was a material question.
The trial court erred in finding that this question was immaterial to whether plaintiffs took
precautions to maintain heat.
The trial court correctly determined that there was a factual issue as to whether the home
ran out of propane to fuel the heating system. Some witnesses provided testimony that the home
was approximately 55 degrees when the frozen pipes were discovered, that the gauges on the
propane tanks indicated there was fuel, that if there had not been fuel other pipes would have
burst as well, and that there would have been other indicia present if there was no fuel.
Conversely, other witnesses indicated that plaintiff may have initially reported that there was no
propane. Moreover, the person who serviced the tanks said there was no propane. There was
therefore a genuine issue of material fact regarding whether plaintiffs ran out of propane.
On cross-appeal, plaintiffs argue that the trial court erred in granting summary disposition
to defendants on the question of consequential damages. We disagree.
Damages recoverable for breach of contract are those that arise naturally from the breach,
or which can reasonably be said to have been in contemplation of the parties at the time the
contract was made. Kewin v Massachusetts Mut Life Ins Co, 409 Mich 401, 419; 295 NW2d 50
(1980). Insurance contracts are agreements to pay a sum of money upon the occurrence of a
-3-
specified event. They are commercial in nature. Id. The injury resulting from the breach of a
commercial contract is a financial one amenable to accurate estimation. Id. at 420. Generally,
adequate compensation is provided to a plaintiff for a breach of contract when damages are
awarded by reference only to the terms of the contract. Casey v Auto Owners Ins Co, 273 Mich
App 388, 402; 729 NW2d 277 (2006).
However, Michigan courts have found the general rule limiting damages for breach of a
commercial contract inapplicable if there is evidence that the parties contemplated the damages.
Lawrence v Will Darrah & Assoc, Inc, 445 Mich 1, 7; 516 NW2d 43 (1994). A party can thus
recover consequential damages if the damages were in the contemplation of the parties at the
time the contract was formed. For example, the loss of profits which result from a breach may
be considered in assessing damages. Parmet Homes, Inc v Republic Ins Co, 111 Mich App 140,
149-150; 314 NW2d 453 (1981). In determining the foreseeability of contract damages,
Michigan courts utilize a flexible approach, but an objective standard. Lawrence, 445 Mich at
12-13. Consequential damages have been awarded when the loss resulted directly from the
nonperformance of the contract between the parties, but not from the failure of another venture
unknown to the defendant. Parmet Homes, Inc, 111 Mich App at 150.
Here, plaintiffs had already listed the home for sale at the time it was damaged. They
claim they were not able to sell the home due to the unrepaired water damage. Plaintiffs assert
that they could not repair the water damage because defendants breached their obligation to pay
them the amount of loss suffered from the broken pipes. Plaintiffs argue that they therefore lost
any profits that they would have garnered from the sale of their home. The trial court found
there was no evidence to show that defendants were aware of these special circumstances and
granted defendants’ motion for summary disposition, finding that damages were limited to the
contract amount and interest under the Unfair Trade Practices Act, MCL 500.2006(4).1
Plaintiffs argue that damages from not selling their home naturally arose from the breach
of contract and were in the contemplation of the parties when they entered into the insurance
contract. Plaintiffs state that defendants should have known that the home was for sale because
plaintiffs were insuring two homes. However, there was no evidence presented that defendants
knew plaintiffs’ home was listed for sale. Further, it cannot be said that the reason plaintiffs’
home did not sell was because defendants failed to pay the claim for damages. Plaintiffs’
inability to sell their home at a specific time does not naturally follow from defendants’ failure to
cover the loss to the home caused by water damage. The loss of profits from another venture is
within the contemplation of the parties only where parties are both aware that a breach will affect
1
MCL 500.2006(4) provides, in relevant part: “If benefits are not paid on a timely basis the
benefits paid shall bear simple interest from a date 60 days after satisfactory proof of loss was
received by the insurer at the rate of 12% per annum, if the claimant is the insured or an
individual or entity directly entitled to benefits under the insured's contract of insurance.” The
purpose of the penalty interest statute is to penalize insurers for dilatory practices in settling
meritorious claims. Angott v Chubb Group Ins, 270 Mich App 465, 479; 717 NW2d 341 (2006).
-4-
the specific collateral enterprise. Parmet Homes, Inc, 111 Mich App at 150. The damages
suffered by plaintiffs due to defendants’ failure to cover the cost of water damage was
adequately compensated by the terms of the contract. Kewin, 409 Mich at 417. Application of
this principle results in a limitation of damages to the monetary value of the contract had
defendants fully performed under it. Id. at 414-415.
Plaintiffs further argue that the subsequent foreclosure of their home was the result of
defendants’ refusal to pay benefits. Plaintiffs state that they listed the home for sale knowing
that they could afford the payments, but could no longer maintain the mortgage payments “long
after [defendants’] wrongful denial” of the claim. Plaintiffs report that the home was sold at a
loss at a foreclosure sale and assert that defendants should be responsible for the amount of the
loss. Plaintiffs argue that the parties contemplated the foreclosure because the insurance policy
identified the mortgage holder as a “second interested party.”
There was no evidence presented that demonstrated a link between the foreclosure and
the unrepaired water damage. Moreover, defendants could not have anticipated that they were
insuring plaintiffs against foreclosure. The purpose of damages for breach of contract is to put
plaintiffs in the same position as they would have been in had the defendant kept his contract,
and the injured party is not entitled to be placed in a better position than he would have been had
the contract not been broken. Parmet Homes, Inc, 111 Mich App at 150. The trial court did not
err in granting defendants’ motion for summary disposition denying consequential damages.2
Affirmed in part, reversed in part and remanded for further proceedings consistent with
this opinion. We do not retain jurisdiction.
/s/ Deborah A. Servitto
/s/ Elizabeth L. Gleicher
2
While the partial dissent indicates the potential for possible consequential damages such as
mold, the home in this matter was ultimately foreclosed upon, thereby shutting the door on any
potential future consequential damages.
-5-
Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.