Empire Bucket, Inc. v. Contractors Cargo Co., No. 13-2452 (7th Cir. 2014)
Annotate this CaseContractors Cargo, engaged in heavy-haul operations, commissioned Empire Bucket to fabricate a steel deck to be used with Cargo’s specialized rail freight car for transporting oversized loads. A third party designed the deck, specifying that the deck be fabricated from T-1 high-strength steel and that welding be performed to American Welding Society specifications. The deck was designed to transport up to 800,000 pounds. Empire fabricated the deck, which passed inspection by an outside agency and all nondestructive tests, and delivered it. Cargo connected the deck to its railcar and loaded it to 820,000 pounds. The next morning, an employee observed that the deck had dropped about three inches. Cargo attempted to raise it with a hydraulic jacking system, but the deck fractured. Cargo hired a metallurgical engineer, who determined that a portion of the weld was composed of material with properties different from the properties of the material in the rest of the weld where the crack originated. Cargo refused to pay the full purchase price. Empire sued and Cargo filed counterclaims. The district court granted Empire’s motion in limine to exclude testimony concerning one test performed on the deck after it failed. The jury returned a verdict for Empire. The Seventh Circuit affirmed, stating that, given testimony admitted at trial, the excluded evidence would have added little to the implied warranty claims.
Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.