2016 Code of Virginia
Title 33.2 - Highways and Other Surface Transportation Systems
Chapter 4 - Limited Access Highways, Scenic Highways and Virginia Byways, and Highways over Dams
§ 33.2-413. When larger spillway required

VA Code § 33.2-413 (2016) What's This?

In case the earthen portion of a dam has been washed away and it is determined by the Commissioner of Highways that the washout was caused by a spillway of insufficient opening to carry floodwater, the dam shall not be restored for the purpose of impounding water unless the owner or occupier agrees with the Commissioner of Highways to the construction of a spillway with adequate opening, conforming to plans and specifications of the Department. In the event that such construction is required, the Commissioner of Highways shall be responsible for such part of the cost as would be necessary to provide a bridge with sufficient opening to carry the floodwater of the stream, and the owner or occupier of the dam shall be required to pay the difference in cost, if any, of providing adequate floodgates and spillways in addition to the bridge.

Code 1950, § 33-94; 1970, c. 322, § 33.1-180; 2014, c. 805.

Disclaimer: These codes may not be the most recent version. Virginia may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.