2013 Oregon Revised Statutes
Volume : 11 - Public Health, Housing, Environment
Chapter 469 - Energy; Conservation Programs; Energy Facilities
Section 469.717 - When installation to be completed.


OR Rev Stat § 469.717 (2013) What's This?

(1) Installation of the energy conservation measures must be completed within 90 days after receipt of loan funds. The State Department of Energy may provide an inspection at the owner's request.

(2) Notwithstanding the provisions of subsection (1) of this section, the department may inspect installation of energy conservation measures to verify that all loan or other state subsidy funds have been used for energy conservation measures recommended in the audit, that installation has been performed in a workmanlike manner and that materials used satisfy prevailing industry standards. If requested to do so by the department, the dwelling owner shall provide the department with copies of receipts and any other documents verifying the cost of energy conservation measures. [1987 c.749 §3]

Disclaimer: These codes may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.