Section 60-13-47: Trade bureaus; connection to installation.


NM Stat § 60-13-47 (1996 through 1st Sess 50th Legis) What's This?

60-13-47. Trade bureaus; connection to installation.

A. Except where work is done under an annual permit, no public utility shall make a connection from a supply of water or gas to an installation for which a permit is required, or which has been disconnected or ordered to be disconnected by the trade bureau having jurisdiction, without the authorization of the trade bureau having jurisdiction.

B. The public utility may make a connection from a supply of water or gas to an installation under the following circumstances:

(1) if within seven days after notification to the appropriate trade bureau of the completion of any work or installation the bureau has failed to approve or disapprove the connection; or

(2) if an installation or work is not located in any territory where there is an authorized inspector; provided, however, before any such connection is made by the public utility, the public utility must have received a written statement from the licensee declaring that the installation or work conforms with the provisions of the Construction Industries Licensing Act [60-13-1 NMSA 1978] and the orders, rules and regulations, codes and minimum standards made pursuant to that act. The public utility shall immediately report to the proper trade bureau the receipt and contents of the statement. If it is discovered by the trade bureau that the declaration made in the statement is false, the trade bureau shall order the licensee making the statement to rectify the defects within five days after receipt of the written notice thereof from the bureau.

C. No public or municipally owned electric utility shall make a connection from a supply of electricity for which a permit is required without the approval of the electrical bureau or its authorized representative. In the event of an emergency, the electrical contractor shall issue a prefinal permit to the serving utility authorizing the service to be reconnected. The electrical contractor shall report the emergency on the next working day to the electrical bureau or its authorized representative for inspection.

Disclaimer: These codes may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.