2011 Arizona Revised Statutes
Title 45 Waters
45-514 Mineral extraction and metallurgical processing permit; conditions for issuance; duration of permit


AZ Rev Stat § 45-514 (1996 through 1st Reg Sess 50th Legis) What's This?

45-514. Mineral extraction and metallurgical processing permit; conditions for issuance; duration of permit

A. Except as provided in subsection D of this section, a person who is engaged in or proposes to engage in the extraction and processing of minerals shall be issued a permit to withdraw groundwater in the required amount, if all of the following apply:

1. The amount of groundwater available for mineral extraction, metallurgical processing and compliance with applicable environmental controls under a dewatering permit is insufficient.

2. Uncommitted municipal and industrial central Arizona project water is not available at the point where the operator's wellhead or distribution system would otherwise be, at a cost which does not exceed the current municipal and industrial central Arizona project delivery rates.

3. Other surface water of adequate quality or effluent of adequate quality is not available at the point where the operator's wellhead or distribution system would otherwise be, at a cost, including treatment costs, which does not exceed by twenty-five per cent the cost the operator would otherwise incur in withdrawing groundwater.

4. The applicant does not own or lease type 2 non-irrigation grandfathered rights originally based on withdrawals of groundwater for the extraction or processing of minerals that the applicant is not using or leasing and that can be used at the proposed location without imposing an unreasonable economic burden on the applicant.

B. A permit issued pursuant to this section shall be granted for a period of up to fifty years, subject to renewal under the same criteria used in granting the original permit.

C. If, during the duration of a mineral extraction and metallurgical processing permit, the director determines that uncommitted municipal and industrial central Arizona project water is available or surface water of adequate quality or effluent of adequate quality is available to the permittee at a cost comparable to groundwater, the director may require the permittee to use such water in lieu of groundwater.

D. Beginning January 1 of the calendar year following the year in which a groundwater replenishment district is required to submit its preliminary plan pursuant to section 45-576.02, subsection A, paragraph 1, and except for an application to renew a mineral extraction and metallurgical processing permit, on receiving a permit application the director shall not issue a permit for a well in the district unless at the time the application is filed:

1. The director has determined that the district's plan for operation is consistent with achieving the management goal, according to section 45-576.03, subsection E, and the designation has not expired.

2. The master replenishment account, as established in section 45-858.01, does not have a debit balance in an amount in excess of the amount allowed under section 45-576.01, subsection A, paragraph 3.

Disclaimer: These codes may not be the most recent version. Arizona may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.