Town of Greensboro v Pellegrini

Annotate this Case
Download PDF
STATE OF VERMONT ENVIRONMENTAL COURT Town of Greensboro, Plaintiff v. Donna Lynn Pellegrini, Defendant } } } } } Docket No. 87 5 05 Vtec In re: Appeal of Pellegrini } } } Docket No. 157 8 05 Vtec Decision and Order In Docket No. 157 8 05 Vtec, Appellant Donna Pellegrini appealed from a decision of the Zoning Board of Adjustment (ZBA) of the Town of Greensboro, denying conditional use approval for a guest apartment in a storage/workshop/garage building, and denying a variance for the sideline setback and height of the as built building.  In Docket No. 87 5 06 Vtec, the Town of Greensboro brought an enforcement action for construction of the building  within  the  sideline  setback  and  exceeding  the  allowed  height.    Defendant Appellant is represented by Sharon Green, Esq.; the Town of Greensboro is represented by Sara Davies, Esq.   An  evidentiary  hearing  was  held  in  this  matter  before  Merideth  Wright, Environmental  Judge.  The  parties  were  given  the  opportunity  to  submit  written memoranda and requests for findings.  Upon consideration of the evidence and of the written memoranda and requests for findings filed by the parties, the Court finds and concludes as follows. Defendant Appellant owns a 6.6 acre parcel of land.  Based on the parties  apparent agreement that the required side setback is 50 feet and the required lot size for a single 1 family  house  is  10  acres,  we  assume  it  is  in  the  Rural  Lands  district.    See,  Town  of Greensboro  Zoning  Bylaws  (Bylaws),  Art.  VI.    The  parcel  appears  to  have  been nonconforming as to lot size in the district at the time of her father s purchase of it in 1992. The parcel is approximately 741 feet in depth, from its southeasterly side at 160 Pellegrini Pike to its northwesterly side bounded by Route 16.  Defendant Appellant s father, Edward Pellegrini, had purchased the property in 1992, and had conveyed it to her at some time after the 1994 zoning permit at issue in this matter (as he is named on the 1994 permit application  and  appears  to  have  signed  it).    The  Lamoille  River  flows  across  the  lot approximately 200 feet from and roughly parallel to Route 16, dividing the lot; all the construction at issue in the present cases involves the area southerly of the river, on the Pellegrini  Pike  side  of  the  lot.    Pellegrini  Pike  is  a  private  road  ending  at  Defendant Appellant s property and serving only three residences. An existing pond is located approximately in the center of the front portion of the property, between the house site and Pellegrini Pike.  Runoff from the pond flows in a northerly direction towards the river.  The primary building on the property is a single family house located northwesterly of the pond, approximately 300 feet back from the road, with access by a gravel driveway running between the westerly side of the pond and the westerly side line of the property.  Northwesterly of the house site, the property slopes steeply down to the river.  A spring and the well serving the house are located northerly of the house site; this area is generally too wet for siting a building. There is room on the property between the southeasterly side of the house and the northwesterly  side  of  the  pond  for  a  32ʹ  x  42ʹ  accessory  building,  containing  a  garage, workshop, and/or guest apartment, to be located in compliance with all the setbacks for the property, although it would be relatively close to and visible from the primary residence on the property.  There is also room on the property for such a building northerly of the pond  and  southerly  of  the  pond.    These  locations  are  shown  generally  on  a  diagram 2 appended to this decision. In 1994, Edward Pellegrini applied for and received a zoning permit to construct a 30ʹ x 60ʹ  garage  building to be used for  storage & work shop,  to be located 100 feet from one side line and 110 feet from the other, on the southwesterly side of the pond.  The section of the application requiring a drawing of the floor plans showed two floor plans, one labeled  down  and one labeled  up.   The 1994 application contained a sketched plot plan, drawn on a copy of the four lot subdivision plot plan for this property, which also depicted a distance of 100 feet to the easterly side line, and a distance of 110 feet to the westerly side line.  These measurements, taken together with the thirty foot width of the proposed  building,  accounted  for  the  240  feet  of  frontage  shown  for  the  lot  on  the subdivision plot plan.  The sketched plot plan showed the proposed garage building to be located between the southeasterly side of the pond and the southeasterly boundary of the property.  At the time of that application and under the current bylaws, the required side line setback was and is 50 feet, and the building height limitation was and is 35 feet above average ground level.  Bylaws Art. VI, §5(b)(2)(c) and Art. II, §4(d).  The minimum lot size in the Rural Lands district is ten acres.  Bylaws Art. VI, §5(b)(1).  A single family dwelling is a permitted use in the district, Bylaws Art. VI, §§3(b), while  accessory apartments  and guest house  are conditional uses.  Bylaws Art. VI, §(4)(d) and (a).  Accessory apartments (as  defined  by  reference  to  the  former  state  statute1)  are  allowed  to  be  located  in  an accessory building. Guest houses are allowed to be constructed, without such dwelling units being considered a second primary dwelling, if they are limited in area to 500 square 1     Bylaws,  Art.  XII.    The  definition  incorporates  by  reference  the  state  statutory provisions  in  the  former  versions  of  24  V.S.A.  §4406(4)(D)  and  4302(11)(D).    The  state statute in effect since July 1, 2004 requires municipalities to allow one accessory dwelling unit, with the limitations found in 24 V.S.A. §4412(1)(E) and (F). 3 feet (if one story) or to 750 square feet (if two story).2   The  permit  stated  that  it  would  be  void  in  the  event  of  failing  to  undertake construction within one year or to complete construction within two years; nevertheless, the building was not constructed until approximately 1998.  It measures 32ʹ x 42ʹ and is built into the slope of the land, so that it consists of a walk out basement level, one full floor level  above  the  basement,  an  attic  level  within  the  slope  of  the  roof,  with  a  dormer, containing the proposed apartment, and a cupola level surrounded by windows.3  The closest corner of the building is located 15.9 feet from the southeasterly side line.  The peak of the cupola roof is 51.1 feet above the top of the building s concrete slab at the front of the building, making the building approximately 49 feet high as building height is required to be measured under the Bylaws.4  The peak of the attic roof is 37 feet above top of the building s concrete slab at the front of the building, making the building height well below 2   Bylaws Art. XII and Art. II, §3(d).  The ZBA seems to have treated the proposed apartment in the garage building as a  guest house  rather than as an  accessory apartment. It  appears  from  reading  the  definitions  together  that  if  the  main  residence  were  to  be owner occupied, the apartment could qualify as an accessory apartment but not as a guest house, as it is not a free standing building and is not proposed to be used for non paying guests for less than 120 days in a year, but is rather proposed to be rented out. 3   The Town alleges and Defendant Appellant does not contest that the cupola level has a floor and contains a room, rather than simply letting light into and being open to the sloped attic level. 4   The definition of the term  Building Height  (Bylaws Art. XII) requires the average ground elevation to be calculated as the average elevation of the finished grade at the front of the building, which in the present case is the side of the building facing the gravel drive and having the three garage doors.  Whether measuring the height of the building with the cupola as it now exists, or measuring the height of the building without the cupola, under that definition it is supposed to be measured to the average height between the eaves and the ridge of the roof; however, the measurement to the eaves has not been provided in evidence so that the building height is merely estimated here. 4 the  35 foot  height  limit  without  the  cupola,  given  the  apparent  slope  of  the  attic  roof. Accordingly, the removal of the cupola would bring the building into conformance with the height limit. The Town asserts that the in ground septic leach field serving the building is located at least in part on the neighboring owner s land.  The neighboring owner did not enter an appearance in the case and did not testify as a witness.  From the evidence presented, the court cannot find that the septic system is located beyond Defendant Appellant s property. If it is, even though it would be a violation of the permit, which shows it to be located within  Defendant Appellant s  property,  as  it  was  not  the  subject  of  the  2005  notice  of violation it therefore is not within the scope of the present enforcement action.  At some time by March of 2001, Defendant Appellant had converted the space in the attic level and cupola of the building to use as an apartment which was 850 square feet in  area.  Although  the  Bylaws  allow  an  accessory  apartment  to  be  created  within  an accessory building already approved for other uses, both parties in this case have treated the application as if it would fall within the 750 square foot limitation for a two story guest house. On  March  21,  2001,  the  Zoning  Administrator  issued  a  notice  of  violation  to Defendant Appellant  advising  her  of  the  following  violations:  that  the  creation  of  the apartment violated the Article II, §3(d) provisions of the Bylaws for a guest house; that the apartment exceeded the square footage limitations for a guest house and therefore also violated the Article II, §3(a) provisions of the Bylaws (restricting lots to no more than one primary structure); and that the creation of the apartment also violated the conditions of the 1990 state subdivision permit5 issued by the Agency of Natural Resources. 5   Both Art. II, §3(d) and the definition of  guest house  in Art. XII of the Bylaws require  the  on site  septic  system  for  a  guest  house  to  be  designed  by  a  certified  site technician.   While a state subdivision  permit  may  be  used to  satisfy  that  requirement, 5 Defendant Appellant did not appeal the issuance of this notice of violation and therefore she cannot contest the existence of the violations stated in that notice.  24 V.S.A. §4472(d).  Rather, she sought to remedy the violation by applying on March 30, 2001 for conditional  use  approval  for  the  apartment,  described  as  a  guest  house  in  existing building.   The use of the existing building was described as a  shop,  and the application repeated the 100 foot and 110 foot side setback measurements from the initial application for the building, although it described the size as 32ʹ x 42ʹ, which the parties do not contest is the as built footprint of the building.  The ZBA conducted a site visit as well as a hearing in connection with the 2001 conditional  use  application,  and  denied  the  application  because  the  building s  septic system  had  never  received  approval,  because  the  height  of  the  building  exceeded  the maximum limits, and because the square footage of the apartment exceeded the limitation of 750 square feet for a guesthouse of more than one story, taken together with the fact that the property lacks enough acreage for a second residence.  At that time the apartment was about three quarters completed and included a full bath.  After the application was denied, Defendant Appellant stopped improving the building for use as an apartment and the apartment space has not been used for living purposes.  If the apartment is approved, Defendant Appellant proposes to rent it out. Defendant Appellant did not appeal the 2001 denial to Environmental Court; she argued to the ZBA in the 2005 hearing that the 2001 application had been withdrawn due to a possible problem with the septic system for the building. In late January and early February of 2005, the Zoning Administrator visited the property to determine whether there were violations of the side setback and of the location nothing else in the Zoning Bylaws appears to make a state subdivision permit enforceable by the Town.  No related enforcement case has been filed in this court by the state Agency of Natural Resources seeking enforcement of that subdivision permit. 6 of the leach field for the building, based upon information received from the adjoining property owner.  Based on that inspection, the Zoning Administrator issued a new Notice of  Violation  on  February  15,  2005,  asserting  the  following  four  violations:  that  the apartment had been established in the building without a permit; that the building contains four floors although the 1994 zoning permit was for only two floors; that the building exceeds the height limit; and that as constructed it  is located within 25 30 feet of  the adjoining property, in violation of the 1994 zoning permit  which provided for a set back of at least 100 feet  and in violation of the setback requirements of the Zoning Bylaws. Defendant Appellant did not appeal the issuance of this notice of violation, and therefore she cannot contest the existence of the violations stated in that notice.  24 V.S.A. §4472(d).  Rather, she sought to remedy the violation by again applying, on May 19, 2005, for conditional use approval for the apartment, as well as for a variance.  The variance request makes reference  to the  letter dated 2 15 05 from [the] Town  and appears to request variances to allow the so called guest house to have its actual size of 850 square feet rather than the 750 square feet referred to in the 2005 Notice of Violation for a two story guest house, to allow the  actual  height6 (stated in the variance application as 41 feet) rather than the 35 foot maximum height in the Bylaws, and to allow the  actual  side yard setback (stated in the variance application as 35 feet) rather than the 50 foot minimum required by the Bylaws.  The variance request also asserts that the  garage/apartment has only  two  floors    balance  of  construction  is  in  roof  area,   from  which  it  is  difficult  to determine whether Defendant Appellant sought to argue that the building should not be 6       Article  II,  §4(d)  of  the  Bylaws  allows  an  applicant  to  apply  for  approval  of additional height for a building, but such application must be made both to the ZBA and to  the  Planning  Commission.    Defendant Appellant  never  applied  to  either  of  those municipal panels for approval of the excess height under this provision in the Bylaws (as opposed to applying for it as a variance). 7 considered to be more than two stories, or sought to request a variance from the two story limitation asserted by the Town. The ZBA denied the application for variance on the basis that the application did not meet any of the required criteria for a variance, without making findings to specify in what respects the application failed those criteria.  The ZBA did not address the conditional use standards for the apartment other than to state that the ZBA needed to determine whether there are any facts substantially different from the 2001 application to warrant a subsequent application. The accessory building is in violation of its permit and the Bylaws as being closer to the side property line than the required 50  foot setback.  The accessory building cannot qualify for a variance from the side setback because there are several areas on the lot on which the building could have been built, or to which the  building  could  potentially  be  moved,  that  would  completely  comply  with  the dimensional requirements of the Bylaws, without being affected by the topography or the wetness  of  the  lot  in  the  areas  closer  to  the  river  or  behind  the  house.    The  accessory building therefore fails to meet subsections 1 and 2 of 24 V.S.A. §4469(a).  Moreover, by building the building too close to the side line, Defendant Appellant (or her predecessor) created the hardship for which she now seeks a variance, in violation of subsection 3 of 24 V.S.A. §4469(a). Defendant Appellant  is  free  to  cure  the  violation  by  any  means  she  chooses, including by obtaining a permit to move the building or to rebuild it on a complying site on the property, or by taking it down, or by obtaining additional property to meet the required sideline setback. The accessory building also is in violation of its permit and the Bylaws as having a building height higher than the 35 foot limitation.  However, Art. II, §4(d) of the Bylaws 8 allows an application to be made to the ZBA and the Planning Commission for approval of additional height,  providing such an increase will not be disruptive to its surroundings and providing it does not constitute a hazard.   No such application has been made in the present case, and therefore the Court does not have such an application to rule on.  It is possible that if the building is moved or rebuilt, or if additional property is acquired to meet the side setback requirements, that such an application could result in approval of the additional height of the cupola.  The Court would consider waiver of the filing fee if any such future application were to result in a new appeal.  In its present location, the accessory building cannot qualify for a variance from the height  requirement  of  the  Bylaws  because,  by  building  the  building  to  that  height, Defendant Appellant (or her predecessor) created the hardship for which she now seeks a variance, in violation of subsection 3 of 24 V.S.A. §4469(a). The height violation could be cured by removal of the cupola, but it would have no effect on the continuing existence of the setback violation in that location. As contrasted with the requirements for building height, nothing in the Zoning Bylaws limits the number of stories a building may have.  The 1994 permit application did not require the applicant to state the number of stories for the proposed building.   Further, in the sketch plan section, the 1994 permit application did not clearly require the applicant to provide a floor plan of each story; rather, the form merely required  both upstairs and downstairs,  that is, two floor plans,  if there is more than one floor.   Therefore the fact that the building has two and a half stories (or perhaps two and three quarters, depending on how  the cupola and  the  dormer  are counted)  does  not  constitute  a violation of the original permit, or of the Bylaws.  Permit conditions, as well as land use regulations, must be construed  by  resolving any uncertainty in favor of the property owner.  Agency of Natural Resources v. Weston, 175 Vt. 573, 577 (Vt. 2003); In re: Appeal of Weeks, 167 Vt. 551, 555 (Vt. 1998). 9 It is possible that, if the building is moved or rebuilt, or if additional property is acquired to meet the side setback requirements, Defendant Appellant could qualify for approval of the apartment.  A new application would have to be made for such approval in its new location, or after the side setback requirements had been met.  If the primary residence on the property is owner occupied, then the apartment may qualify for approval as an accessory dwelling unit under 24 V.S.A. §4412(E), if it meets the requirement of not exceeding 30% of the total habitable floor area of the primary residence, and if there is adequate sewage disposal for the apartment in its new location or by connecting it to the system serving the primary residence.  If, on the other hand, the apartment is intended to be  used  for  non paying  guests  for  no  more  than  120  days  per  year,  it  may  qualify  for approval if it meets the septic system requirements of the definition of  Guest house  in the Bylaws and is reduced in size to the maximum of 750 square feet.  The setback and height violations existed from the construction of the building to the present.  However, the Town did not bring an enforcement action based on the notice of violation issued in 2001.  The applicable statutory section as it then existed was 24 V.S.A. §4444(a), which  allowed a  municipality to bring an enforcement  action without a  new notice  of  violation  within  the  twelve  months  following  the  issuance  of  the  notice  of violation.  Therefore we look at the potential for a penalty dating from March 2, 2005, with reference to the 2005 notice of violation.  To the date of trial, that time period was 420 days. Because  Defendant Appellant s  costs  of  coming  into  compliance  will  be  expensive,  no matter how she may choose to carry it out, it will be sufficient in this matter to impose an additional penalty of $15.00 per day, for a total of $6,300, to compensate the Town for its costs of obtaining compliance, including its surveying fees and its attorney s fees.  See, Town of Hinesburg v.Dunkling, 167 Vt. 514, 528 29 (1998).  10 Based on the foregoing, it is hereby ORDERED and ADJUDGED that the requested variances  are  DENIED,  and  the  application  for  approval  of  the  apartment  within  the building in its present location is DENIED, without prejudice.  Defendant Appellant shall cure  the  setback  violation,  in  compliance  with  the  following  schedule.    On  or  before February  15,  2007,  Defendant Appellant  shall  report  to  the  Court  in  writing  the arrangements she has made to cure the side setback violation, whether by moving the building to or rebuilding it on a complying site on the property, or by taking it down, or by obtaining additional property to meet the required sideline setback, or by any other means.   On or  before March  1, 2007,  Defendant Appellant shall report  to the Court  in writing  the  arrangements  she  has  made  cure  the  height  violation,  and  shall  file  any required applications for approval of the additional height and for approval of any new location  for  the  building  if  it  is  proposed  to  be  moved  or  rebuilt  on  the  property.    If Defendant Appellant has failed to make such arrangements by that date, the Town may apply for an order under V.R.C.P. 70 to have a person appointed to take any necessary action.  In addition, Defendant Appellant shall pay a penalty of $6,300 as calculated above; the parties may  make their own arrangements or apply to the Court for a schedule of payments over time. Dated at Berlin, Vermont, this 7th day of November, 2006. ______________________________________ Merideth Wright  Environmental Judge 11

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.