Ford, et al v All-Dry Of The Carolinas, Inc

Annotate this Case
Download PDF
An unpublished opinion of the North Carolina Court of Appeals does not constitute controlling legal authority. Citation is disfavored, but may be permitted in accordance with the provisions of Rule 30(e)(3) of the North Carolina Rules of Appellate Procedure. NO. COA10-931 NORTH CAROLINA COURT OF APPEALS Filed: 19 April 2011 SHARON FORD and GWIN BUFFINGTON, Plaintiffs, v. Haywood County No. 07 CVS 1547 ALL-DRY OF THE CAROLINAS, INC., Defendant. Appeal by plaintiffs and defendant from order entered 15 January 2010 and judgment entered 11 February 2010 by Judge Dennis J. Winner in Haywood County Superior Court. Heard in the Court of Appeals 24 January 2011. Smathers and Hyde, by Patrick U. Smathers, and Song & Song, PLLC, by Jonathan J. Song, for plaintiffs-appellants. Young, Morphis, Bach & Taylor, L.L.P., by Paul E. Culpepper and Timothy D. Swanson, for defendant-appellant. MARTIN, Chief Judge. On 12 June 2006, plaintiff Sharon Ford purchased a home located at 171 Birch Road Prior to her identified: in Maggie Valley, North Carolina. purchasing the home, three 1) the retaining wall needed needed to repairs be were fixed or -2replaced; 2) the foundation needed to be stabilized; and 3) the deck needed to be stabilized. Defendant All-Dry of the Carolinas, Inc. ( All-Dry ) submitted a proposal dated 1 May 2006 which quoted a price of $24,000.00 for the material and labor involved in the installation of a Grip-Tite Foundation Pier System in order to address these needed repairs. Ms. Ford was also given a copy of an unsigned warranty and literature advertising that All-Dry s Grip-Tite Foundation Pier System would cause a home to solidly rest on bedrock or equal low-bearing strata instead of unstable soil and to eliminate shifting, literature also advertised investment in solid safe. a home that or settling problems. The after installation, an building be commercial will Ms. Ford accepted All-Dry s proposal and, on or about 28 June 2006, All-Dry began the repair work on Ms. Ford s home. The work was completed on 30 June 2006. That day, All-Dry gave Ms. Ford a document which she signed stating in part: This amendment is made part of the contract submitted to ___, dated ____. In the piering and foundation business, there is one overriding goal by All-Dry of the Carolinas, and this is to stabilize the affected area against further vertical settlement. Until this is accomplished, any repairs of a cosmetic nature performed on your home will be futile due to the fact that this type of structural damage is usually progressive. -3As an added consideration, we will attempt to close cracks, render doors and windows operational, and move walls back to their original position. This is something we would sincerely like to see happen; however, we are painfully aware of the consequences of such efforts, and you, as our customer, must be also. There are several factors which affect any contractor s ability to cause the above mentioned items to occur. . . . . Due to the above factors [skin friction, obstructions, brick or stone veneer, concrete piers], the possibility of further cosmetic or consequential damages occurring during a lifting operation is much greater than while only stabilizing the area in question. As a result, All-Dry of the Carolinas, Inc., does not accept any responsibility for these consequential damages if they should occur. We, of course, will proceed slowly and with extreme care to minimize the possibility of any damage during the lifting process. Approximately two months after the installation was completed, Ms. Ford began to have difficulty opening her windows and doors. Interior plaster walls cracked, there were nail pops in her ceilings and walls, and spaces developed in her window and door trim. The slope in her floors changed and the cracks that were in the basement and outside foundation walls increased in size. By August 2006, Ms. Ford noticed that her refrigerator and stovetop had begun to tilt to one side. By September 2006, she noticed additional floor sloping in her dining room. By -4October 2006, cracks began to appear in her walls. Since this time, Ms. Ford s home has experienced further deepening cracks, more nail pops, more tilting of floors, pooling and running of water when it rains, a bedroom wall on the main floor of the house separating from the back wall, and shifting of stairs. Ms. Ford filed a complaint against All-Dry on 30 November 2007 alleging breach of contract, fraud, unfair and deceptive practices in distress. By an amended complaint, Gwin Buffington was added as an commerce, additional and negligent party-plaintiff, infliction and claims of for emotional breach of warranties and negligence were asserted. By its answers to the complaint and amended complaint, AllDry denied dismiss. the allegations contained The matter was tried by a jury. therein and moved to At trial, a number of different experts testified as to the manner in which the work was performed, the damages, and the cost of necessary repairs. Without any repairs, the director of building inspections for Haywood County testified that the structure would be condemned and, if not repaired, demolished. At directed the close verdict. of The all the trial evidence, court All-Dry granted the moved motion for with respect to plaintiffs claims for negligence and fraud, denied the motion with respect to plaintiffs claims for breach of -5contract, and reserved ruling on the motion with respect to plaintiffs commerce. claims for unfair and deceptive practices in The jury returned a verdict finding All-Dry breached the contract and awarded damages in the amount of $126,000.00. The jury also found that All-Dry failed to obtain a building permit, that its conduct was in commerce, and that such conduct had proximately caused plaintiffs to be damaged in the amount of $146,300.00. All-Dry moved for a notwithstanding the verdict. new trial and a judgment The trial court granted judgment notwithstanding the verdict with respect to plaintiffs claim for unfair practices, but denied the motions with respect to plaintiffs claim for breach of contract. Judgment was entered awarding interest plaintiffs plaintiffs costs. $126,000.00 plus and the Both plaintiffs and defendant appeal. _________________________ PLAINTIFFS APPEAL I. Plaintiffs defendant s claim. contend motion for the trial directed court verdict erred on in their granting negligence A motion for a directed verdict tests the sufficiency of the evidence to support a verdict for the non-moving party. Williams v. CSX Transp., Inc., 176 N.C. App. 330, 344, 626 -6S.E.2d 716, 728 (citing Whaley v. White Consol. Indus., Inc., 144 N.C. App. 88, 92, 548 S.E.2d 177, 180, disc. review denied, 354 N.C. 229, 555 S.E.2d 277 (2001)), granting petition for disc. review withdrawn, 360 N.C. 491, 632 S.E.2d 775 (2006). The trial court takes the non-movant s evidence as true and considers it in the light most favorable to him, giving to the non-movant the benefit of every reasonable inference that may legitimately conflicts, be and drawn The the inconsistencies movant s favor. 180. from evidence being with resolved motion v. in the non- Whaley, 144 N.C. App. at 92, 548 S.E.2d at should be denied unless insufficient to justify a verdict for the Dickinson contradictions, Pake, 284 N.C. 576, 583, 201 the evidence non-movant. S.E.2d is E.g. 897, 902 (1974). North Carolina has adopted the economic loss rule, which prohibits recovery for economic loss claims are governed by contract law. in tort. Instead, Moore v. Coachmen Indus., Inc., 129 N.C. App. 389, 401, 499 S.E.2d 772, 780 (1998). rule specifically provides that such [w]here a defective The product causes damage to property other than the product itself, losses attributable to the defective product are recoverable in tort rather than contract. Id. at 402, 499 S.E.2d at 780 (citing Reece v. Homette Corp., 110 N.C. App. 462, 467, 429 S.E.2d 768, -7770 (1993)). The rationale for the economic loss rule is that the sale of goods is accomplished by contract and the parties are free to include, or exclude, provisions as to the parties respective rights and remedies, should the product prove to be defective. To give a party a remedy in tort, where the defect in the product damages the actual product, would permit the party to ignore and avoid the rights and remedies granted or imposed by the parties contract. Id. at 401-02, 499 S.E. 2d at 780; see also Wilson v. Dryvit Sys., Inc., 206 F. Supp. 2d 749, 754 (E.D.N.C. 2002), aff'd, 71 F. App x. 960 (4th Cir. 2003) (applying North Carolina law and noting that defendant s cladding is an integral component of plaintiffs house. The damage caused constitutes damage to the house itself. damage has resulted, and plaintiffs . . . therefore No other property have suffered purely economic losses ); Land v. Tall House Bldg. Co., 165 N.C. App. 880, 884, 602 S.E.2d 1, 4 (2004); Gregory v. Atrium Door & Window Co., 106 N.C. App. 142, 143-44, 415 S.E.2d 574, 575 (1992) (water damage to flooring caused by malfunctioning and deteriorating doors constituted economic loss not recoverable in negligence); Warfield v. Hicks, 91 N.C. App. 1, 10, 370 S.E.2d 689, 694, disc. review denied, 323 N.C. 629, 374 S.E.2d 602 (1988). In the present case, plaintiffs alleged that All-Dry s -8negligent construction caused damage only to the house itself. As such, even taken in the light most favorable to plaintiffs, the economic loss rule prevents any recovery on a claim for negligence and therefore defendant s motion for a directed verdict as to that claim was properly granted. II. Plaintiffs granting verdict next All-Dry s on their allege motion claim that for that deceptive practices in commerce. the trial judgment All-Dry court erred notwithstanding committed unfair in the and Specifically they allege that a finding by the jury that defendant failed to obtain a building permit as required by law constitutes an aggravating circumstance to support a verdict for plaintiffs on their claim for a violation of North Carolina s act prohibiting unfair and deceptive practices in commerce. The act declares We disagree. unlawful [u]nfair methods of competition in or affecting commerce, and unfair or deceptive acts or practices in or affecting commerce. 75-1.1(a) (2009). N.C. Gen. Stat. § Whether an alleged commercial act or practice is unfair or deceptive in violation of N.C.G.S. § 75-1.1 is a question of law. Hardy v. Toler, 288 N.C. 303, 310, 218 S.E.2d 342, 346-47 (1975) (noting that the jury should determine the facts, and based on the jury s findings, the court should then -9determine as a matter of law whether the defendant engaged in unfair or deceptive acts or practices). of law is de novo. Our review of questions E.g. Davis v. Dep't of Crime Control & Pub. Safety, 151 N.C. App. 513, 516, 565 S.E.2d 716, 719 (2002). In determining the unfair or deceptive nature of an act or practice, each case is fact specific. Carcano v. JBSS, LLC, __ N.C. App. __, __, 684 S.E.2d 41, 50 (2009) (citing Marshall v. Miller, 302 N.C. 539, 548, 276 S.E.2d 397, 403 (1981)). A practice is unfair when it offends established public policy as well as when the practice is immoral, unethical, oppressive, unscrupulous, or substantially injurious to consumers. Id. (quoting Bus. Cabling, Inc. v. Yokeley, 182 N.C. App. 657, 663, 643 S.E.2d 63, 68, disc. review denied, 361 N.C. 567, 650 S.E.2d 599 (2007)). Stated another way, a party is guilty of an unfair act or practice when it engages in conduct which amounts to an inequitable assertion of its power or position. Id. (quoting McInerney v. Pinehurst Area Realty, Inc., 162 N.C. App. 285, 289, 590 S.E.2d 313, 316-17 (2004)). The relevant gauge of an act s unfairness or deception is [t]he effect of the actor s conduct on the marketplace. Id. at __, 684 S.E.2d at 50 (quoting Ken-Mar Fin. v. Harvey, 90 N.C. App. 362, 365, 368 S.E.2d 646, 648, disc. review denied, 323 N.C. 365, 373 S.E.2d 545 (1988)). -10Additionally, while under the act commerce is intended to include all types of business activities, the Act does not apply to all wrongs in a business setting. Id. at __, 684 S.E.2d at 50 (citing Hageman v. Twin City Chrysler-Plymouth, Inc., 681 F. Supp. 303 (M.D.N.C. 1988) (holding that the act does not apply to every dispute between parties)). In order to recover under the Act, the unfair or deceptive act or practice must be more than just a breach of contract. Eastover Ridge, L.L.C. v. Metric Constructors, Inc., 139 N.C. App. 360, 367-68, 533 S.E.2d trade 827, practices contract, and . 832-33 are . ( [A]ctions distinct . a mere for from unfair actions breach of or for deceptive breach contract, even of if intentional, is not sufficiently unfair or deceptive to sustain an action under N.C.G.S. § 75-1.1. ) (quoting Branch Banking & Trust Co. v. Thompson, 107 N.C. App. 53, 62, 418 S.E.2d 694, 700, disc. review denied, 332 N.C. 482, 421 S.E.2d 350 (1992)), disc. review denied, 353 N.C. 262, 546 S.E.2d 93 (2000). plaintiff must show substantial aggravating circumstances attending the breach in order to recover under the Act. 368, 533 S.E.2d at 833. The Id. at We note that, given this substantial requirement, it is, in fact, unlikely that an independent tort could arise in the course of contractual performance, since those sorts of claims are most appropriately addressed by asking simply whether a obligations. party Id. -11adequately (quoting fulfilled Broussard its v. contractual Meineke Discount Muffler Shops, 155 F.3d 331, 347 (4th Cir. 1998)); see also Bob Timberlake Collection, Inc. v. Edwards, 176 N.C. App. 33, 42, 626 S.E.2d 315, 323, disc. review denied, 360 N.C. 531, 633 S.E.2d 674 (2006). Our research reveals no North Carolina precedent for concluding that failure to perform an administrative act, such as obtaining a building permit, is a substantial aggravating circumstance sufficient to enhance a claim for breach of contract to one for a violation of the act prohibiting unfair practices in commerce. not amount to Failing to obtain a building permit does the required [defendant s] power or position. 684 S.E.2d at 50. additional immoral, injurious penalty under the Act. court s ruling assertion of Carcano, __ N.C. App. at __, We cannot say that plaintiffs established the egregious, substantially inequitable acts oppressive, needed to unscrupulous, impose the or heightened Thus, we will not disturb the trial granting All-Dry s motion for judgment notwithstanding the verdict on the unfair practices claim. III. Plaintiffs next contend the trial court erred in limiting its instruction on plaintiffs unfair practices claim to -12defendant s failure to obtain a building permit. The verdict sheet submitted to the jury first asked the jury to find whether there was a breach of contract. Immediately following the breach of contract issue, the verdict sheet asked the jury to determine whether All-Dry perform[ed] repairs to the plaintiffs foundation without obtaining a building permit as required by law? Plaintiffs argue that the jury should have been permitted to consider additional factors which plaintiffs allege were substantially aggravating in violation of the act prohibiting including unfair and misleading deceptive written practices promotional in commerce, materials given to plaintiffs, the faulty installation of the Grip-Tite system, and less than full disclosure of relevant and material facts and terms until after completion of the project. We disagree. Plaintiffs acknowledge that statements made in All-Dry s promotional materials may be accurate statements . . . when the Grip-Tite pier system is properly designed and installed. They argue, however, that in the present case, those statements were misleading because of the employees involved in the breached along in with system, are the the written actual relevant minimal experience project. to the given installation breach the All-Dry Any warranties made and representations faulty of of of to plaintiffs, the contract Grip-Tite claim; but neither of these substantially -13rise factors aggravating for deceptive practices claim. the to the level purposes of an of being unfair and Neither an intentional breach of contract nor a breach of warranty . . . constitutes a violation of Chapter 75. Mitchell v. Linville, 148 N.C. App. 71, 74, 557 S.E.2d 620, 623 (2001) (citing Branch Banking & Trust Co., 107 N.C. App. at 62, 418 S.E.2d at 700; Trust Co. v. Smith, 44 N.C. App. 685, 691, 262 S.E.2d 646, 650, disc. review denied, 300 N.C. 379, 267 S.E.2d 685 (1980), overruled on other grounds, Marshall v. Miller, 302 N.C. 539, 276 S.E.2d 397 (1981)). Plaintiffs also contend the trial court erred by not instructing the jury that it could consider whether All-Dry did not fully disclose all relevant, material facts and terms until after completion information has of been the project. considered Failure deceptive when to disclose tantamount to misrepresentation, Kron Med. Corp. v. Collier Cobb & Assocs., 107 N.C. defendant App. 331, 339, insurance 420 broker s S.E.2d 192, failure to 196, (holding correct that plaintiff s belief that a deposit on insurance premiums would be refundable if the actual coverage used was less than projected constituted a violation of an insurance regulation statute, which constituted an unfair or deceptive practice as a matter of law), disc. review denied, 333 N.C. 168, 424 S.E.2d 910 (1992); -14however, in the present case, the damage incurred by plaintiffs as a specific result of any false representations by defendant was not separate and apart from the damage arising out of the breach of contract claim. Plaintiffs are entitled to one recovery for the same alleged wrongful conduct, but not multiple recoveries under theories of breach of contract and unfair and deceptive trade practices. See Decker v. Homes, Inc./Constr. Mgmt. & Fin. Grp., 187 N.C. App. 658, 666, 654 S.E.2d 495, 501 (2007) (citing Marshall v. Miller, 47 N.C. App. 530, 542, 268 S.E.2d 97, 103 (1980), modified and aff'd, 302 N.C. 539, 276 S.E.2d 397 (1981); United Labs. v. Kuykendall, 335 N.C. 183, 191-92, 437 S.E.2d 374, 379 (1993)). We hold therefore that plaintiffs assertions that the trial court erred in instructing the jury are without merit. ALL-DRY S APPEAL I. All-Dry contends the trial court committed prejudicial error by not submitting to the jury its requested instruction on plaintiffs duty to mitigate. Where a party properly requests the trial court to give specific jury instructions and those instructions are correct and supported by the evidence, the trial court is required to give the instructions. Maglione v. Aegis Family Health Ctrs., 168 N.C. App. 49, 55, 607 S.E.2d 286, -15291 (2005) (citing Whiteside Estates, Inc. v. Highlands Cove, L.L.C., 146 N.C. App. 449, 464, 553 S.E.2d 431, 441 (2001), disc. review denied, 356 N.C. 315, 571 S.E.2d 220 (2002)). As a threshold issue, it is not at all clear from the record that All-Dry properly tendered a written request for the mitigation instruction. When the topic of a mitigation instruction was broached during the charge conference, the trial judge replied, I hadn t you didn t request such a charge, so I hadn t thought about it. Defendant s attorney responded that I would request that you think about it. The trial judge then replied, you haven t formally requested it in a way that I ve got to give it. Where a requested instruction is not submitted in writing and signed pursuant to G.S. 1-181 it is within the discretion instruction. of the court to give or refuse such Lusk v. Case, 94 N.C. App. 215, 216, 379 S.E.2d 651, 652 (1989) (quoting State v. Harris, 67 N.C. App. 97, 102, 312 S.E.2d 541, 544, disc. rev. denied, 311 N.C. 307, 317 S.E.2d 905 (1984)). As All-Dry did not submit a written request, it was within the trial judge s absolute discretion whether or not to give the instruction. issue of whether a As such we do not need to reach the properly requested mitigation instruction would have been appropriate and we find no error in the trial court s refusal to instruct the jury with respect to plaintiffs -16duty to mitigate. II. All-Dry also alleges that the trial court erred in denying its motions for directed verdict prior to the jury deliberations and for judgment notwithstanding the verdict or a new trial after the verdict was announced with respect to plaintiffs breach of contract claim. The standard for appellate review of a trial court s decision on a motion for directed verdict is the same as the standard of review for a judgment notwithstanding the verdict (JNOV). Poore v. Swan Quarter Farms, Inc., 94 N.C. App. 530, 532, 380 S.E.2d 577, 578 (citing Colony Assoc. v. Fred L. Clapp & Co., 60 N.C. App. 634, 637, 300 S.E.2d 37, 39 (1983)), decision modified on denial of reargument, 95 N.C. App. 449, 382 S.E.2d 835 (1989). A motion for a directed verdict or a JNOV must be granted if the evidence when taken in the light most favorable to the non-movant is insufficient as a matter of law to support a verdict in favor of the non-movant. Id. (citing Harvey v. Norfolk S. Ry. Co., 60 N.C. App. 554, 556, 299 S.E.2d 664, 666 (1983)). The evidence is sufficient to withstand either motion if there is more than a scintilla of evidence supporting each element of the non-movant s case. Id. at 523- 33, 380 S.E.2d at 578 (citing Broyhill v. Coppage, 79 N.C. App. -17221, 226, 339 S.E.2d 32, 35 (1986)). The elements of a breach of contract claim are (1) existence of a valid contract and (2) breach of the terms of that contract. 838, 843 (2000). Poor v. Hill, 138 N.C. App. 19, 26, 530 S.E.2d The parties do not contest that a valid contract existed. All-Dry pursuant alleges to pushpiers the in that parties plaintiffs it completed contract home. by The the necessary installing trial work seventeen court, however, allowed the issue to go to the jury based upon a theory that All-Dry did not perform its duties under the workmanlike manner as the contract implied. contract in a The trial court also noted that there was some evidence that All-Dry breached its express warranty in that a jury could find that plaintiffs house settled subsequent to the installation of the pushpier system. However, because we agree with the trial court that there was substantial, competent evidence to support the jury s finding that the contract was breached by reason of All-Dry s failure to perform in a workmanlike manner, we need not reach the issue additionally of whether support there the theory of express warranty. jury s was sufficient verdict on the evidence to alternative -18All-Dry points to Everts v. Parkinson, 147 N.C. App. 315, 332, 555 S.E.2d 667, 678 (2001) and Oates v. Jag, Inc., 66 N.C. App. 244, 246, 311 S.E.2d 369, 370 (1984), rev d on other grounds, 314 N.C. 276, 333 S.E.2d 222 (1985), in support of its argument that an implied warranty is only available to vendeegrantees against vendor-builders. for the proposition that breach However, these cases stand of the implied warranty of habitability is not available to future purchasers of a home against the original privity of contract. present case as home builder when the parties have no This line of cases is inapplicable to the All-Dry and plaintiffs were in privity of contract and, furthermore, plaintiffs did not allege a breach of the implied warranty of habitability but rather a breach of the implied warranty of workmanlike installation. When a party contracts to install something, there exists an implied warranty that it will be installed in a workmanlike manner. Cantrell v. Woodhill Enters., 273 N.C. 490, 497, 160 S.E.2d 476, 481 (1968) ( It is the duty of every contractor or builder to perform his work in a proper and workmanlike manner, and he impliedly represents that he possesses the skill necessary to do the job he has undertaken. ). Substantial evidence was presented upon which the jurors could base their finding that the implied workmanlike warranty -19No building permit was obtained for the job. was breached. No engineering analysis was prepared prior to the start of the job. Evidence was presented that All-Dry failed to address the need to support an interior foundation wall. Other evidence showed that one of the piers installed did not sit flush with the house and that, to compensate, All-Dry inserted a wooden shimmy to fill the space between the pier and the house. There was evidence that the brackets were not attached to the house and that such failure was a fault in workmanship. Furthermore, testimony was presented that the brackets were not, as they should have been, encased in concrete in order to be protected from the elements, and that no backfill was placed around the piers. Some therefore did of the not piers have were full not completely bearing vertical contact. One and expert testified that the work performed appeared to be incomplete and that the stability system of installed the house, did thus not ensure exerting an continued upward lateral force and causing additional cracking. Plaintiffs experts Roger Moore and William Burgin both testified that All-Dry s installation of the push pier system failed to meet the standard construction in the area. and quality of workmanlike This testimony more than supported the jury s conclusion -20All-Dry that breached its contractual obligations to plaintiffs. Nevertheless, All-Dry further contends that its motions for either a directed verdict or a judgment notwithstanding the verdict should have been granted on the breach of contract claim because, it alleges, any damages were speculative. Again, we do not agree. Contrary evidence to All-Dry s demonstrating assertions, was costs the there would be which substantial incurred in order to repair the home and bring the plaintiffs to the same position that they would have been in had All-Dry performed the contract in a workmanlike manner. trial, William approximately Burgin testified $50,000.00 in that repair plaintiffs costs. He fully During the would incur specifically testified that to complete the remaining structural work would cost approximately $25,000.00 and to repair the esthetic and architectural damage would cost approximately $25,000.00. Chase estimated that the costs to repair would be John between $141,000.00 and $146,000.00. Edward Medlock also testified about the costs that would be incurred in repairing the home. He testified that a repair plan to stabilize the structure would require a complete geotechnical evaluation that would cost approximately $10,000.00. Medlock -21also suggested that a specialty engineering firm conduct a site specific evaluation and then design and install a foundation support system at a cost of approximately $50,000.00. estimated that addressing the foundation and He then framing issues would cost approximately an additional $5,000.00 and that the construction costs to replace or repair the structural damages would cost testified outweigh an that additional costs value its the such $50,000.00. to repair that Ultimately, the home demolition would of the Medlock likely existing structure and building of a new home may be more cost-effective. All-Dry also contends plaintiffs failed to offer any proof that the damage to their property resulted from any breach by All-Dry. However, we direct All-Dry to, among other evidence, testimony by William installed by All-Dry, Burgin that continues the to pushpier worsen the system, as cracking in plaintiffs walls and the sloping of plaintiffs floors. Finally, All-Dry argues that, because of the express warranty provided to plaintiffs, the measure of damages in this case was incorrectly calculated and should have been limited to the cost general, of making when the assessing work conform damages in to the contract. construction disputes: [t]he fundamental principle which underlies In contract -22the decisions regarding the measure of damages for defects or omissions in the performance of a building or construction contract is that a party is entitled to have what he contracts for or its equivalent. What the equivalent is depends upon the circumstances of the case. In a majority of jurisdictions, where the defects are such that they may be remedied without the destruction of any substantial part of the benefit which the owner s property has received by reason of the contractor s work, the equivalent to which the owner is entitled is the cost of making the work conform to the contract. But where, in order to conform the work to the contract requirements, a substantial part of what has been done must be undone, and the contractor has acted in good faith, or the owner has taken possession, the latter is not permitted to recover the cost of making the change, but may recover the difference in value. Hayworth v. Brooks Lumber Co., 65 N.C. App. 555, 558, 309 S.E.2d 572, 574 (1983) (quoting Robbins v. Trading Post, Inc., 251 N.C. 663, 666, 111 S.E.2d 884, 887 (1960)). As All-Dry correctly points out, [i]f a construction contract provides that the contractor will repair, replace or adjust defects in materials or workmanship at no cost to the buyer then the measure of damages for such defects is limited to the cost of making the work conform to the contract. Id., at 558, 309 S.E.2d at 574 (citing Leggette v. Pittman, 268 N.C. 292, 150 S.E.2d 420 (1966)). The warranty in this case guarantee[d] the performance of the Grip-Tite Piering System -23for a period of twenty-five (25) years. the footings will not settle. This guarantees that If such settling does occur, [All-Dry] will correct the problem at [its] expense or refund the full amount of the money paid to [it]. Here, however, settling was not the only breach of contract by All-Dry. The failure to perform in a workmanlike manner caused a number of other problems besides settlement including gaps in window and door frames, cracks in walls, nail pops in ceilings and walls, spaces in window and door trim, changes in floor slopes, cracks in basement and outside foundation walls, walls separating from other walls, and shifting of stairs. With all that of these extensive needed repairs, it is clear plaintiffs are entitled to the difference between the value of what they foundation contracted or other to obtain a construction repaired home without the present issues and condition of the home after the unworkmanlike construction did not address its foundational issues and in fact caused a great deal of further damage. See id. at 558, 309 S.E.2d at 574. John Chase testified that in its present condition, the house is worth approximately $36,100.00. the foundation was repaired, the value He testified that if of the home would increase to $163,000.00 and that if the sheetrock and floors were also repaired, the value of the home would increase to approximately $196,000.00. -24Bruce Crawford, the Haywood County director of building inspections testified that, without repair, the structure would be condemned and demolished. William Burgin testified that it would cost plaintiffs approximately $50,000.00 to repair the damages caused by AllDry. Edward Medlock estimated that it would cost plaintiffs $115,000.00 to repair the damages. John Chase estimated that it would cost between $141,000.00 and $146,000.00 to repair the damages to the home. The jury s conclusion that plaintiffs were entitled to $126,000.00 in damages is a figure consistent with estimates that the home $50,000.00 and required $146,000.00 repairs which would cost between in order that its value could be increased by approximately $126,000.00 to $159,900.00 so that the home would be repaired and undamaged as contracted for by plaintiffs. Affirmed. Judges HUNTER and THIGPEN concur. Report per Rule 30(e).

Some case metadata and case summaries were written with the help of AI, which can produce inaccuracies. You should read the full case before relying on it for legal research purposes.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.