RENDERED: DECEMBER 28, 2007; 10:00 A.M.
NOT TO BE PUBLISHED
Commonwealth of Kentucky
Court of Appeals
NO. 2005-CA-002264-MR
TED L. NOBLE AND BARBARA NOBLE
v.
APPEAL FROM CAMPBELL CIRCUIT COURT
HONORABLE FRED A. STINE, V., JUDGE
ACTION NO. 04-CI-01223
SANITATION DISTRICT NO. 1,
A KENTUCKY CORPORATION
AND:
APPELLEE
NO. 2005-CA-002521-MR
S. MARIANNE SMITH
v.
APPELLANTS
APPELLANT
APPEAL FROM CAMPBELL CIRCUIT COURT
HONORABLE FRED A. STINE, V., JUDGE
ACTION NO. 04-CI-01222
SANITATION DISTRICT NO. 1,
A KENTUCKY CORPORATION
APPELLEE
OPINION
AFFIRMING
** ** ** ** **
BEFORE: ACREE, DIXON, AND KELLER, JUDGES.
ACREE, JUDGE: Ted and Barbara Noble and Marianne Smith appeal from orders of the
Campbell Circuit Court which granted temporary and permanent easements across their
properties in favor of Kentucky Sanitation District 1 (SD1) for the purpose of installing a
sanitary sewer line. We affirm.
The Appellants own neighboring properties on Alexandria Pike in Cold
Spring, Kentucky. Their homes and the homes of others in the immediate vicinity are
served by private septic systems. In the fall of 2001, one of the Appellants’ neighbors
contacted several local agencies seeking help with faulty septic systems in the
neighborhood. The failure of some of the systems had resulted in visible raw sewage and
associated odors. A group of property owners near the Appellants’ properties then
presented a petition1 to SD1 for an assessment project asking that public sanitary sewer
lines be installed. SD1 accepted the petition and authorized the acquisition of a
preliminary engineering report to determine a guaranteed maximum assessment fee to be
charged to the property owners for the installation of the sewer lines and for preliminary
alignment and design of the sewer lines.
SD1 hired a civil engineer to conduct the preliminary engineering report.
The purpose of the report was to determine whether the homes in the area could
effectively be served by a public sewer. The engineer prepared his report after walking
the property, observing topographical considerations, locating the septic systems for the
1
At least two-thirds of the affected property owners were required to sign the petition. Of 12
affected property owners, 9 signed the petition. One property owner does not believe the
signature on the petition is his, but he paid the initial project evaluation fee and voted for the
assessment project.
-2-
affected homes, locating the existing sewer lines to which a proposed line would connect,
and considering environmental concerns. His report, recommending a gravity flow sewer
system, was accepted by the Sanitation District Board (the Board).
A public hearing was held on October 2, 2003. The preliminary engineering
design was presented at the public hearing and the Appellants and other neighbors were
given an opportunity to voice complaints and ask questions. After the hearing, voting
cards were sent to the property owners. Eight property owners voted for the project, three
voted against, and one did not return the card.2 The Board passed a resolution
authorizing and directing SD1 to proceed with the project.
Prior to the public hearing, the proposal was that the sewer line run south to
north across the entry of Summit Lane,3 across the front of the property adjoining the
Appellants’ property on the south side, turn 90 degrees and run in a westerly direction
down the south side of the Nobles’ property approximately three quarters of the way, then
diagonally down and across the rear of the Nobles’ property. In an effort to alleviate
complaints made during the public hearing, the proposed easement was moved as far back
on the Nobles’ property as possible. The sewer line was altered to run south to north to
approximately the southern corner of the junction of Summit Lane and Alexandria Pike,
then 45 degrees southwest down Summit Lane to approximately the center of Summit
Lane, then approximately 90 degrees north/northwest directly across the rear of 4628
2
Non-responsive and unreturned cards are considered a positive response.
3
Appellants live north of Summit Lane.
-3-
Alexandria Pike and 4626 Alexandria Pike, the Nobles’ property. In order to install the
sewer lines SD1 would need a temporary construction easement with a maximum width
of thirty feet from the centerline of the permanent easement.
In the summer of 2004, SD1 sent documents to the Appellants seeking
twenty-foot wide permanent easements on each property for an underground sanitary
sewer line, and forty-foot4 wide temporary easements. SD1 offered the Nobles $1400 for
their easements and Smith $1700. Both offers were declined. All necessary property for
the project had been acquired with the exception of that owned by the Appellants.
On October 14, 2004, SD1 filed condemnation proceedings against the
Appellants in an effort to obtain the easements. Court-appointed commissioners
determined that the Nobles were entitled to $650 and Smith was entitled to $700 for their
easements. The trial court entered Interlocutory Orders and Judgments finding that SD1
had the right to condemn each property. Subsequently, the Appellants filed exceptions to
the interlocutory orders. Appellants took issue with the precise location of the easement
on their property. The Campbell Circuit Court held hearings on April 14, 2005, April 27,
2005, and May 4, 2005, in the Noble matter and on August 17, 2005, and August 19,
2005, in the Smith matter.
On July 18, 2005, and November 7, 2005, the trial court entered Orders
granting easements for the proposed sanitary sewer line and allowing the easements to be
4
The temporary easement granted by the trial court was thirty feet from the centerline of the
permanent easement. Since the center line of the permanent easements are ten feet from the rear
property lines, the temporary easements extend forty feet from the Nobles’ and Smith’s rear
property lines.
-4-
located in the rear of the Appellants' properties. This appeal followed. The Appellants’
claims have been consolidated.
As a preliminary matter, we note SD1’s contention that the Appellants’
brief contains documents which are not part of the record on appeal. We agree and thus
strike Appendices A – D of the Appellants’ brief.
The Appellants argue our standard of review is governed by American
Beauty Homes Corp. v. Louisville and Jefferson County Planning, 379 S.W.2d 450 (Ky.
1964). We agree that the three-prong test for reviewing agency actions would be the
applicable standard of review had Appellants sought review of the Board's action by
means of a cross-claim before the circuit court. However, they did not. This appeal is
taken only from two orders of the Campbell Circuit Court granting SB1 the right to take
Appellants’ property pursuant to KRS 416.610.
As such, we review the trial court’s factual findings under a clearly
erroneous standard and the legal issues de novo. See Carroll v. Meredith, 59 S.W.3d 484,
489 (Ky.App. 2001); Commonwealth, Transportation Cabinet, Dept. of Highways v.
Taub, 766 S.W.2d 49 (Ky. 1988); and CR 52.01. Factual findings are not clearly
erroneous if they are supported by substantial evidence. Id. “Substantial evidence has
been conclusively defined by Kentucky courts as that which, when taken alone or in light
of all the evidence, has sufficient probative value to induce conviction in the mind of a
reasonable person.” Bowling v. Natural Resources & Environmental Protection Cabinet,
891 S.W.2d 406, 409 (Ky.App. 1994), citing Kentucky State Racing Commission v.
-5-
Fuller, 481 S.W.2d 298, 308 (Ky. 1972); and Blankenship v. Lloyd Blankenship Coal
Co., Inc., 463 S.W.2d 62 (Ky. 1970). It is within the province of the trial court as the
fact-finder to determine the credibility of the witnesses and the weight to be given the
evidence. See Uninsured Employers' Fund v. Garland, 805 S.W.2d 116, 118 (Ky. 1991);
Cole v. Gilvin, 59 S.W.3d 468, 473 (Ky.App. 2001).
The Appellants argue that the trial court inappropriately granted SB1’s
petitions for condemnation. Their first contention is that the trial court incorrectly
concluded SD1 was entitled to condemn Appellants’ properties for sewer easements
because the easements sought were neither necessary nor for a public purpose. We
disagree.
Under KRS 416.610(4), when a property owner has filed an answer putting
the right to condemn in issue, the circuit court is required to hear the matter and to
determine whether the petitioner has the right to condemn the property sought and to
make findings regarding that right. In making such determination, the circuit court must
consider two basic questions: (1) the authority of the petitioner to condemn the property;
and (2) the public necessity in exercising that authority. Duerson v. East Kentucky Power
Cooperative, Inc., 843 S.W.2d 340, 343 (Ky.App. 1992).
SD1 is a political subdivision, or municipal corporation, of the
Commonwealth of Kentucky, organized pursuant to the provisions of KRS Chapter 220
et seq. It is undisputed among the parties that SD1 has specific statutory authority to
condemn property for public use. KRS 220.310. A condemning body is given broad
-6-
discretion regarding the amount of land to be taken and in determining whether the taking
is a necessity. Kentucky courts have consistently held “[m]unicipal corporations are
agencies of the state and when they declare through their constituted authorities that the
taking of private property is requisite for an authorized public use, they exercise a public
function and it is assumed that, as public agencies, they have carried out with wisdom and
discretion the power lodged in them by the Legislature.” McGee v. City of Williamstown,
308 S.W.2d 795, 797 (Ky. 1958); see also, Jefferson County v. Clausen, 297 Ky. 414, 180
S.W.2d 297 (1944). The party challenging the condemnation bears the burden of
establishing a lack of necessity for the taking or an absence of public use. God's Center
Foundation, Inc. v. Lexington Fayette Urban County Government, 125 S.W.3d 295, 300
(Ky.App. 2002).
“Although the factors of necessity and public use associated with
condemnation are ultimately legal issues, resolution of those issues encompasses factual
matters subject to deferential review on appeal.” God’s Center at 300. In their assertions
made in support of their argument, the Appellants’ criticize the trial court’s evaluation of
and the weight given various portions of the evidence concerning the sewage problem in
their neighborhood. They characterize the septic system leaks as a private nuisance for
which individual responsibility should be taken. The trial court applied these facts
differently and after several hearings and extensive testimony from those affected,
concluded the easements were necessary. Taking into consideration the findings of fact
made by the trial court, which after a thorough review of the record we conclude to be
-7-
supported by substantial evidence, we find that the Appellants did not succeed in
establishing a lack of necessity. This neighborhood clearly had problems with its septic
systems. We are not compelled by, nor will we reverse the determination of SD1, based
upon the Appellants’ theories of conspiracy.
The Appellants also attempt to challenge the public use of the proposed
sewer system. They do not, however, provide this court with a single basis upon which
we might conclude that condemnation of their property for the purpose of installing a
sewer line is not in the public’s interest. Having shown no support for such a position, we
defer to SD1's decision that the easement is for public use.
Appellants next dispute the trial court’s finding that SD1 engaged in good
faith negotiations to purchase the easements prior to filing their eminent domain petition.
SD1’s authority to condemn property is carefully circumscribed by constitutional
provisions requiring that the taking be for a public use and that the condemnee receive
just compensation. Kentucky Constitution, §§ 13, 242; KRS 416.540-680; God's Center,
supra. Kentucky courts have imposed an additional duty on the condemnor to negotiate
in good faith for the acquisition of the property prior to seeking condemnation. See
Eaton Asphalt Paving Co. v. CSX Transportation, Inc., 8 S.W.3d 878, 883 (Ky.App.
1999), quoting Usher & Gardner, Inc. v. Mayfield Independent Board of Education, 461
S.W.2d 560 (Ky. 1970). See also Coke v. Commonwealth, Department of Finance, 502
S.W.2d 57 (Ky. 1973).
-8-
On October 7, 2004, SD1’s attorney sent letters to the Nobles and to Smith
offering them $1400 and $1700, respectively, for the easements. Mrs. Noble claims she
unsuccessfully attempted to contact SD1’s attorney several times before she eventually
rejected the offer. Smith declined the $1700 and made a counteroffer of $50,000, which
SD1 rejected. SD1 then filed its petition for condemnation. The easements were later
appraised by the court-appointed commissioners at values considerably lower than SD1’s
offers.
It has been established in this state that a “condemnor is not required to
haggle in order to satisfy its obligation to negotiate in good faith the purchase of
property.” God’s Center at 304, citing Coke, supra, at 59. The evidence shows that SD1
made a legitimate offer and the Appellants rejected it. It is our opinion that there was a
good faith effort on the part of SD1 to purchase the easements prior to the condemnation
proceedings.
Finally we turn to the Appellants’ allegations that SD1 acted arbitrarily and
capriciously in its selection of the easement locations. We will review the condemning
body's exercise of discretion for arbitrariness or action in excess of its authority. See
Proffitt v. Louisville & Jefferson County Metropolitan Sewer District, 850 S.W.2d 852,
854 (Ky. 1993); and Vandertoll, supra, at 360.
The Appellants claim the procedures SD1 followed in deciding where the
easement would be located on their property were arbitrary and capricious and thus
violated their constitutional right to due process. More specifically, they take issue with
-9-
SD1’s decision to move the easement from the middle of their backyards to the outermost portion of their property. This was done after a public hearing for the purpose of
allowing those affected by the project to voice their opinions and ask questions of SD1.
The Appellants expressed their desire that the easement not be located in their backyards,
but instead in front of their homes. After the public hearing, the affected property owners
voted on whether they would like the sewer installation to proceed and the majority was
in favor of the project. Taking into consideration the opposition the Appellants had for
the plan, SD1’s engineer moved the location of the easement on the Appellants’ property
so that it was located at the very rear of their property. The Appellants believe after this
change was made, an additional public hearing should have been held and another vote of
the property owners taken.
We fail to see how the actions taken by SD1 were arbitrary or capricious.
Changes to the preliminary sewer plan were made in order to better accommodate the
Appellants and intrude upon their property as little as possible. Further, SD1 had no duty
to place the easement in the exact location desired by the Appellants. As stated above,
the condemning body has substantial discretion in determining what particular property is
needed in connection with a valid public project. McGee, supra. Further, the record
reflects SD1 and its agents properly researched the sewer project and even went to great
lengths to try to satisfy the Appellants who they knew were unhappy with the project as a
whole. The Appellants fail to establish any abuse of discretion upon the part of SD1 in its
proceeding to condemn their property.
- 10 -
For the foregoing reasons, the judgments of the Campbell Circuit Court are
affirmed.
ALL CONCUR.
ORAL ARUGMENT AND BRIEFS FOR
APPELLANTS, TED NOBLE AND
BARBARA NOBLE; AND S.
MARIANNE SMITH:
Robert E. Blau
Cold Spring, Kentucky
BRIEF FOR APPELLEE:
Scott M. Guenther
Jennifer H. Langen
Covington, Kentucky
ORAL ARUGUMENT FOR APPELLEE:
Scott M. Guenther
Covington, Kentucky
- 11 -