2018 Wyoming Statutes
TITLE 41 - WATER
CHAPTER 7 - IRRIGATION DISTRICTS
ARTICLE 3 - DISTRICT COMMISSIONERS GENERALLY
SECTION 41-7-314 - Power to enter land to repair irrigation works; construction of ditches across railway rights-of-way.

Universal Citation: WY Stat § 41-7-314 (2018)

41-7-314. Power to enter land to repair irrigation works; construction of ditches across railway rights-of-way.

(a) The commissioners, their agents, servants, and employees shall have the right to go upon all lands along any reservoirs, ditch, canal, or embankment in their district, to inspect, deepen, widen and repair the same whenever necessary, doing no unnecessary damage, and shall not be liable for trespass therefor.

(b) Said commissioners shall have the right to lay out and construct all necessary canals, ditches, drains and embankments across any railway right-of-way or yard within their district, and any railway company whose right-of-way or yard is crossed by the line of any proposed canal, ditch, drain or embankment shall open its right-of-way or yard and permit such canal, ditch, drain or embankment to cross the same as soon as such canal, ditch, drain or embankment is constructed to such right-of-way. Upon receiving fifteen (15) days notice in writing any railway company across whose right-of-way or yard any such canal, ditch, drain or embankment is laid out, shall open its right-of-way or yard and permit said commissioners and their contractors, agents and employees to construct such canal, ditch, drain or embankment across said right-of-way or yard. For every day that such railway company fails, after the end of said fifteen (15) days to open its right-of-way or yard as hereinbefore required, it shall forfeit twenty-five dollars ($25.00) to said irrigation district to be collected in an action as other forfeitures are collected, or to be set off against any damages that have been awarded to such railway company. If such railway company fails to open its right-of-way or yard along the line of any such canal, ditch, drain or embankment, the commissioners may at any time after the expiration of said fifteen (15) days open such right-of-way or yard along the line of such canal, ditch, drain or embankment and construct the same. Every irrigation district shall be liable to the railway company whose right-of-way or yard is crossed by any canal, ditch, drain or embankment of the district, for the reasonable cost of any culverts or bridges for railway purposes made necessary by the crossing of such right-of-way or yard by any such canal, ditch, drain or embankment, but the cost so entailed shall not be greater than the average cost of other culverts and bridges of similar size installed on the same division of the railway, and crossing streams, canals, ditches or drains of approximately the same width and depth within a distance of one hundred (100) miles of the canals, ditches or drains of said district.

Disclaimer: These codes may not be the most recent version. Wyoming may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.