24-1-132. Contracts for county bridge work; bids; exception.


WY Stat § 24-1-132 (through 2012) What's This?

(a) The board of county commissioners of any county shall cause to be prepared comprehensive plans and specifications for the construction of bridges on any dedicated and maintained county road.

(b) As used in this section a bridge is a structure, including supports, erected over a depression or an obstruction, such as water, highway or railway, having a track or passageway for carrying traffic or other moving loads and having an opening measured along the center of the roadway of more than twenty (20) feet between undercopings of abutments, or spring lines of arches, or extreme ends of openings for multiple barrel box culverts. It may include multiple pipes, where the clear distance between openings is less than one-half (1/2) of the smaller contiguous opening.

(c) When any bridge is to be constructed, which includes either new construction or reconstruction of major load carrying bridge components, upon any county road, the estimated cost of which shall exceed twenty-five thousand dollars ($25,000.00), the construction work shall be competitively bid and the bridge work constructed by contract. No contract shall be divided for the purpose of avoiding competitive bidding. The construction work may be described in the published call for bids by stating general requirements. Detailed specifications shall be available to prospective bidders at the county commissioner's office.

(d) All bridges to be constructed shall be designed by a professional engineer who holds a valid certificate of registration granted by the state board of examining engineers of the state of Wyoming. Plans and specifications shall be prepared in accordance with the provisions of W.S. 24-2-106.

(e) The board of county commissioners of any county shall cause notices of the contract to be let to be published for two (2) consecutive weeks in a newspaper having general circulation within the state and to take any other means available to achieve as wide a notice as possible, but in no case shall any letting of the contract be held within fifteen (15) days of the last published notice.

(f) All contracts shall be awarded by the county commissioners to the lowest responsible bidder. The county commissioners shall reserve the right to reject any and all bids and to waive irregularities and informalities in the bidding. No final payment upon any contract shall be made until the bridge is examined and the payment approved by the county commissioners or their designees.

(g) Whenever an emergency arises requiring expenditure of funds for the repair or rebuilding of bridges or approaches to bridges the board of county commissioners may enter into contract for any building or rebuilding of bridges or approaches without advertising for the letting of any contract. An emergency is an occasion requiring repair or rebuilding of a bridge or a portion of a bridge when, on short notice, the bridge has become unsafe or impassable due to events which are beyond the control of the county.

Disclaimer: These codes may not be the most recent version. Wyoming may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.