2020 Revised Code of Washington
Title 47 - Public Highways and Transportation
Chapter 47.60 - Puget Sound Ferry and Toll Bridge System.
47.60.375 Capital plan.

RCW 47.60.375 Capital plan.

(1) The capital plan must adhere to the following:

(a) A current ridership demand forecast;

(b) Vehicle level of service standards as described in RCW 47.06.140;

(c) Operational strategies as described in RCW 47.60.327; and

(d) Terminal and vessel design standards as described in RCW 47.60.365.

(2) The capital plan must include the following:

(a) A current vessel preservation plan;

(b) A current systemwide vessel rebuild and replacement plan as described in RCW 47.60.377;

(c) A current vessel deployment plan; and

(d) A current terminal preservation plan that adheres to the life-cycle cost model on capital assets as described in RCW 47.60.345.

[ 2010 c 283 § 5; 2008 c 124 § 3; 2007 c 512 § 13.]

NOTES:

Findings—Intent—Effective date—2010 c 283: See notes following RCW 47.60.355.

Finding—Intent—2007 c 512: See note following RCW 47.06.140.

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.