2011 Washington Code
Title 49 Labor regulations
49.24 Health and safety -- Underground workers.
49.24.240 Inspection after blast.

(1) After a blast is fired, loosened pieces of rock shall be scaled from the sides of the excavation and after the blasting is completed, the entire working chamber shall be thoroughly scaled.

     (2) The person in charge shall inspect the working chamber and have all loose rock or ground removed and the chamber made safe before proceeding with the work.

     (3) Drilling must not be started until all remaining butts of old holes are examined for unexploded charges.

[1941 c 194 § 17; Rem. Supp. 1941 § 7666-25.]



Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.