2005 Washington Revised Code RCW 43.21A.610: Steam electric generating plant — Study — Construction.

    The director shall continue the study of the state power commission made in 1956 relating to the construction of a steam power electric generating plant, and if the construction of a steam electric generating plant is found to be feasible by the director, the director may construct such plant at a site determined by him to be feasible and operate it as a state owned facility.

    [1988 c 127 § 10; 1965 c 8 § 43.21.250. Prior: 1957 c 275 § 3. Formerly RCW 43.21.250]

Disclaimer: These codes may not be the most recent version. Washington may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.