2018 Vermont Statutes
Title 3 - Executive
Chapter 51 - Natural Resources
§ 2822 Budget and report; powers

Universal Citation: 3 V.S.A. § 2822

§ 2822. Budget and report; powers

(a) The Secretary shall be responsible to the Governor and shall plan, coordinate, and direct the functions vested in the Agency. The Secretary shall prepare and submit to the Governor an annual budget.

(b) The Secretary shall also have the powers and duties set forth in section 2803 of this title.

(c) If a waiver has been granted by the Public Utility Commission under 30 V.S.A. § 248(k), the Secretary or the Secretary's designee shall expedite and may authorize temporary emergency permits with appropriate conditions to minimize significant adverse environmental impacts within the jurisdiction of the Agency, after limited or no opportunity for public comment, allowing site preparation for or construction or operation of an electric transmission facility or a generating facility necessary to ensure the stability or reliability of the electric system or a natural gas facility, regardless of any provision in Title 10 or 29 V.S.A. chapter 11. Such authorization shall be given only after findings by the Secretary that: good cause exists because an emergency situation has occurred; the applicant will fulfill any conditions imposed to minimize significant adverse environmental impacts; and the applicant will, upon the expiration of the temporary emergency permit, remove, relocate, or alter the facility as required by law or by an order of the Public Utility Commission. A permit issued under this subsection shall be subject to such conditions as are required by the Secretary and shall be valid for the duration of the declared emergency plus 180 days, or such lesser overall term as determined by the Secretary. Upon the expiration of a temporary emergency permit under this subsection, if any applicable permits have not been issued by the Secretary or the Commissioner of Environmental Conservation, the Secretary may seek enforcement under applicable law.

(d) The Secretary may adopt rules to implement the authority to issue expedited, temporary emergency permits specified in subsection (c) of this section and in 20 V.S.A. § 9(11).

(e) The Secretary, with the approval of the Secretary of Administration, may transfer any unexpended funds appropriated in a capital construction act to other projects authorized in the same section of that act.

(f) For any Agency program, the Secretary may provide for simplified application forms and procedures for minor projects.

(g) The Secretary shall make all practical efforts to process permits in a prompt manner. The Secretary shall establish time limits for the processing of each permit as well as procedures and time periods within which to notify applicants whether an application is complete. The Secretary shall report no later than the third Tuesday of each annual legislative session to the General Assembly by electronic submission. The annual report shall assess the Agency's performance in meeting the limits; identify areas that hinder effective Agency performance; list fees collected for each permit; summarize changes made by the Agency to improve performance; describe staffing needs for the coming year; certify that the revenue from the fees collected is at least equal to the costs associated with those positions; and discuss the operation of the Agency during the preceding fiscal year and the future goals and objectives of the Agency. The provisions of 2 V.S.A. § 20(d) (expiration of required reports) shall not apply to the report to be made under this subsection. This report is in addition to the fee report and request required by 32 V.S.A. chapter 7, subchapter 6.

(h) [Repealed.]

(i) The Secretary shall not process an application for which the applicable fee has not been paid unless the Secretary specifies that the fee may be paid at a different time or unless the person applying for the permit is exempt from the permit fee requirements pursuant to 32 V.S.A. § 710. Municipalities shall be exempt from the payment of fees under this section except for those fees prescribed in subdivisions (j)(1), (7), (8), (14), and (15) of this section for which a municipality may recover its costs by charging a user fee to those who use the permitted services. Municipalities shall pay fees prescribed in subdivisions (j)(2), (10), (11), (12), and (26), except that a municipality shall also be exempt from those fees for stormwater systems prescribed in subdivisions (j)(2)(A)(iii)(I), (II), or (IV) and (j)(2)(B)(iv)(I), (II), or (V) of this section for which a municipality has assumed full legal responsibility under 10 V.S.A. § 1264.

(j) In accordance with subsection (i) of this section, the following fees are established for permits, licenses, certifications, approvals, registrations, orders, and other actions taken by the Agency of Natural Resources.

(1) For air pollution control permits or registrations issued under 10 V.S.A. chapter 23:

(A) Base service fees. Any persons subject to the provisions of 10 V.S.A. § 556 shall submit with each permit application or with each request for a permit amendment, a base service fee in accordance with the base fee schedule in subdivision (i) of this subdivision (1)(A). Prior to taking final action under 10 V.S.A. § 556 on any application for a permit for a nonmajor stationary source or on any request for an amendment of a permit for such a source, the Secretary shall assess each applicant for any additional fees due to the Agency, assessed in accordance with the base fee schedule and the supplementary fee schedule in subdivision (ii) of this subdivision (1)(A). The applicant shall submit any fees so assessed to the Secretary prior to issuance of the final permit, notwithstanding the provisions of subsection (i) of this section. The base fee schedule and the supplementary fee schedule are applicable to all applications on which the Secretary makes a final decision on or after the date on which this section is operative.

(i) Base fee schedule

(I) Application for permit to construct

or modify source

(aa) Major stationary source  $  15,000.00

(bb) Nonmajor stationary source  $  2,000.00

(cc) A source of emissions from  $  1,000.00

anaerobic digestion of agricultural

products, agricultural by-products,

agricultural waste, or food waste

(II) Amendments

Change in business name, division name,

or plant name; mailing address; or

company stack designation; or other

administrative amendments  $  150.00

(ii) Supplementary fee schedule for nonmajor

stationary sources

(I) Engineering review  $  2,000.00

(II) Air quality impact analysis

Review refined modeling  $  2,000.00

(III) Observe and review source emission

testing  $  2,000.00

(IV) Audit performance of continuous

emissions monitors  $  2,000.00

(V) Audit performance of ambient air

monitoring  $  2,000.00

(VI) Implement public comment requirement  $  500.00

(B) Annual registration. Any person required to register an air contaminant source under 10 V.S.A. § 555(c) shall annually pay the following:

(i) A base fee where the sum of a source's emissions of sulfur dioxide, particulate matter, carbon monoxide, nitrogen oxides, and hydrocarbons is:

(I) ten tons or greater: $1,500.00;

(II) less than ten tons but greater than or equal to five tons: $1,000.00; and

(III) less than five tons: $500.00.

(ii) Where the sum of a source's emissions of sulfur dioxide, particulate matter, carbon monoxide, nitrogen oxides, and hydrocarbons is greater than or equal to five tons: an annual registration fee that is $0.0335 per pound of such emissions except that a plant producing renewable energy as defined in 30 V.S.A. § 8002 shall pay an annual fee not exceeding $64,000.00.

(C) Anaerobic digesters. Notwithstanding the requirements of subdivisions (A) and (B) of this subdivision (j)(1), a person required to register an air contaminant source under 10 V.S.A. § 555(c) or subject to the requirements of 10 V.S.A. § 556 shall not be subject to supplementary fees assessed under subdivision (A)(ii) of this subdivision (j)(1) and shall pay an annual registration fee not exceeding $1,000.00 when the source of the emissions is the anaerobic digestion of agricultural products, agricultural by-products, agricultural waste, or food waste.

(2) For discharge permits issued under 10 V.S.A. chapter 47 and orders issued under 10 V.S.A. § 1272, an administrative processing fee of $240.00 shall be paid at the time of application for a discharge permit in addition to any application review fee and any annual operating fee, except for permit applications under subdivisions (A)(iii)(III) and (V) of this subdivision (j)(2):

(A) Application review fee.

(i) Municipal, industrial, non-

   contact cooling water, and thermal

   discharges.

(I) Individual permit: original                  $0.003 per gallon

   application; amendment for                permitted flow;

   increased flows; amendment               minimum $100.00

   for change in treatment           per outfall; maxi-

   process:                                             mum $30,000.00

                                                            per application.

(II) Renewal, transfer, or mi-                 $0.002 per gallon

   nor amendment of individual               permitted flow; minimum

   permit:                                               $50.00 per outfall;

                                                            maximum $5,000.00 per

                                                            application.

(III) General permit:                              $0.00.

(ii) Pretreatment discharges.

(I) Individual permit: original                  $0.20 per gallon design flow;

   application; amendment for                minimum $100.00 per

   increased flows; amendment               outfall.

   change in treatment process:

(II) Renewal, transfer, or mi-                 $0.002 per gallon

   nor amendment of individual               design flow; minimum

   permit:                                               $50.00 per outfall.

(iii) Stormwater discharges.

(I) Individual operating permit               $860.00 per acre

   or application to operate                    impervious area;

   under general operating         minimum $440.00

   permit for collected                            per application.

   stormwater runoff

   which is discharged to

   Class B waters: original

   application; amendment

   for increased flows;

   amendment for change

   in treatment process:

(II) Individual operating permit         $1,400.00 per acre

   or application to operate                    impervious area; mini-

   under general operating         mum $1,400.00 per

   permit for collected                            application.

   stormwater runoff which is

   discharged to Class A waters;

                           original application;

   amendment for increased flows;

   amendment for change in

   treatment process.

(III) Individual permit or

   application to operate under

   general permit for con-

   struction activities; orig-

   inal application;

   amendment for increased

   acreage.

   (aa) Projects with low risk                 $100.00 per

   to waters of the State;                        project; original

   five acres or less:                               application.

   (bb) Projects with low risk                 $220.00 per project.

   to waters of the State;

   greater than five acres.

   (cc) Projects with moderate               $480.00 per

   risk to waters of the State:                  project original

   five acres or less:                               application.

   (dd) Projects with moderate               $640.00.

   risk to waters of the State;

   greater than five acres:

   (ee) Projects that require an               $1,200.00.

   individual permit; ten acres

   or less:

   (ff) Projects that require an                 $1,800.00.

   individual permit;

   greater than 10 acres:

(IV) Individual permit or           $440.00 per

   application to operate                        facility.

   under general permit for

   stormwater runoff

   associated with industrial

   activities with specified

   SIC codes; original

   application; amendment

   for change in activities:

(V) Individual permit or                         $2,400.00

   application to operate                        per system.

   under general permit

   for stormwater runoff

   associated with municipal

   separate storm sewer systems;

   original application;

   amendment for change

   in activities:

(VI) Individual operating permit or application to operate under a general permit for a residually designated stormwater discharge original application; amendment; for increased flows amendment; for change in treatment process.

    (aa) For discharges to Class B water; $860.00 per acre of impervious area, minimum $280.00.

    (bb) For discharges to Class A water; $1,700.00 per acre of impervious area, minimum $1,700.00.

(VII) Renewal, transfer, or                    $0.00.

   minor amendment of

   individual permit:

(VIII) Application for coverage         $400.00 per application.

   under the municipal roads

   stormwater general permit:

(IX) Application for coverage               $1,200.00.

   under the State roads

   stormwater general permit:

(iv) Indirect discharge or

   underground injection control, exclud-

   ing stormwater discharges.

(I) Indirect discharge, sewage.

Individual permit: origi-                         $1,755.00 plus $0.08 per

   nal application; amendment                gallon of design capac-

   for increased flows;                            ity above 6,500 gpd.

   amendment for modifica-

   tion or replacement of sys-

   tem.

(II) Indirect discharge, nonsewage.

Individual permit:                      $0.06 per gallon

   original application;                            of design capacity;

   amendment for increased                   minimum $400.00.

   flows; amendment for modifi-

   cation or replacement of

   system.

(III) Underground injection; individual permit; amendment for increased flows; amendment for modification or replacement of system.

(aa) For applications where                $500.00 and $0.10 for

the discharge meets                        each gallon per day   groundwater enforcement             over 2,000 gallons    standards at the point                   per day.

of discharge:

   (bb) For applications where               $1,500.00 and $0.20 for

      the discharge meets                         each gallon per day

      groundwater enforcement                over 2,000 gallons

      standards at the point         per day.

      of compliance:

(B) Annual operating fee.

(i) Industrial, noncontact                            $0.0015 per gallon design

    cooling water and                      capacity. $200.00

    thermal discharges:                                minimum;

                                                                 maximum $210,000.00.

(ii) Municipal:                                                        $0.003 per gallon of permitted flows.

$200.00 minimum; maximum $12,500.00.

(iii) Pretreatment discharges:                      $0.04 per gallon design capacity. $200.00

minimum;

maximum $27,500.00.

(iv) Stormwater.

(I) Individual operating permit          $310.00 per acre

   or approval under general               impervious area;

   operating permit for col-                $310.00 minimum.

   lected stormwater runoff

   which is discharged

  to Class A waters:

(II) Individual operating permit         $160.00 per acre

   or approval under general                  impervious area;

   operating permit for                           $160.00 minimum.

   collected stormwater runoff

   which is discharged to

   Class B waters:

(III) Individual permit or            $160.00 per facility.

   approval under general

   permit for stormwater

   runoff from industrial

   facilities with speci-

   fied SIC codes:

(IV) Individual permit or           $10.00 per acre of

   application to operate                        impervious surface

   under general permit for                     within the muni-

   stormwater runoff associ-                   cipality; annually.

   ated with municipal separate

   storm sewer systems:

(V) Individual permit or approval under general permit for residually designated stormwater discharges. (aa) For discharges to Class A water; $310.00 per acre of impervious area, minimum $310.00. (bb) For discharges to Class B water; $160.00 per acre of impervious area, minimum $160.00.

(VI) For application to operate under a general permit for

stormwater runoff associated with municipal roads, the following fees per authorization annually:

   (aa) in a municipality with a population of more than 5,000 persons: $1,800.00;

(bb) in a municipality with a population of 2,500 to 5,000 persons and 95 miles or more of maintained road: $1,800.00;

(cc) in a municipality with a population of 2,500 to 5,000 persons and 25 to less than 95 miles of maintained road: $1,350.00;

(dd) in a municipality with a population of 2,500 to 5,000 persons and less than 25 miles of maintained road: $500.00;

(ee) in a municipality with a population of fewer than 2,500 but more than 500  persons and 25 miles or more of maintained road: $1,350.00;

(ff) in a municipality with a population of fewer than 2,500 but more than 500  persons and less than 25 miles of maintained road: $500.00;

(gg) in a municipality with a population of fewer than 500 persons: $500.00;

(hh) in a municipality that is covered under a municipal separate storm sewer system permit: $0.00; and

(ii) in an unincorporated or disincorporated municipality: $0.00. (VII) Application to operate under a general permit for stormwater runoff associated with State roads: $90,000.00 per authorization annually.

(VIII) Individual permit or approval under a general permit for

a discharge from a medium concentrated animal feeding operation: $1,500.00 per facility.

(IX) Individual permit or approval under a general permit for a

discharge from  a large concentrated animal feeding operation: $2,500.00 per facility.

(X) Individual or general operating permits authorizing

discharges of stormwater runoff from new development or redevelopment of less than one acre of impervious surface permitted after July 1, 2022 pursuant to 10 V.S.A. § 1264(c)(1) shall be exempt from the fees imposed by subdivisions (I) and (II) of this subdivision (iv).

(v) Indirect discharge or underground

   injection control, exclud-

   ing stormwater discharges:

(I) Indirect discharge.

   (aa) Individual permit:            $400.00 plus $0.035 per

gallon of design capacity

                                                            above 6,500 gpd.

maximum $27,500.00.

   (bb) Approval under                          $220.00.

                       general permit:

(II) Underground injection control.

   (aa) For applications where                $500 and $0.02 for

     the discharge meets ground-          each gallon per

     water enforcement standards         day over 2,000

     at the point of discharge:                  gallons per day.

(bb) For applications where                  $1,500.00 and $0.02

     the discharge meets                          for each gallon per day

     groundwater enforcement                 over 2,000 gallons

     standards at the point of                   per day.

     compliance:

(cc) Approval under general                  $220.00.

                        permit:

(C) The Secretary shall bill all persons who hold discharge permits for the required annual operating fee. Annual operating fees may be divided into semiannual or quarterly billings.

(3) Repealed.]

(4) For potable water supply and wastewater permits issued under 10 V.S.A. chapter 64. Projects under this subdivision include: a wastewater system, including a sewerage connection; and a potable water supply, including a connection to a public water supply:

(A) Original applications, or major amendments for a project with the following proposed design flows. In calculating the fee, the highest proposed design flow whether wastewater or water shall be used:

(i) design flows 560 gpd or less: $306.25 per application;

(ii) design flows greater than 560 and less than or equal to 2,000 gpd: $870.00 per application;

(iii) design flows greater than 2,000 and less than or equal to 6,500 gpd: $3,000.00 per application;

(iv) design flows greater than 6,500 and less than or equal to 10,000 gpd: $7,500.00 per application;

(v) design flows greater than 10,000 gpd: $13,500.00 per application.

(B) Minor amendments:                      $150.00.

(C) Minor projects:                                        $270.00.

As used in this subdivision (j)(4)(C), "minor project" means a project that meets the following: there is an increase in design flow but no construction is required; there is no increase in design flow, but construction is required, excluding replacement potable water supplies and wastewater systems; or there is no increase in design flow and no construction is required, excluding applications that contain designs that require technical review.

(D) Notwithstanding the other provisions of this subdivision, when a project is located in a Vermont neighborhood, as designated under 24 V.S.A. chapter 76A, the fee shall be no more than $50.00 in situations in which the application has received an allocation for sewer capacity from an approved municipal system. This limitation shall not apply in the case of fees charged as part of a duly delegated municipal program.

(5) For well drillers licenses issued under 10 V.S.A. chapter 48:

$140.00 per year.

Fees shall be paid on an annual basis over the term of the license.

(6) For solid waste treatment, storage, transfer, or disposal facility certifications issued under 10 V.S.A. chapter 159:

(A) original and renewal                                 $0.75 per ton certified

applications, excluding                        operational capacity pro-

recycling and composting                                rated and paid on an

facilities, and categorical                                 annual basis over the term

solid waste facilities                                        of certification.

solid waste facilities                           

(B) original and renewal                      $100.00.

applications for recycling

and composting facilities,

excluding categorical solid

waste facilities that solely

manage recycling or composting

solid waste

(C) original and renewal applications   $0.00

for categorical solid waste facilities

solely managing recycling

or composting solid waste

 (D) original and renewal                                $100.00.

applications for cate-

gorical disposal facilities

(E) original and renewal                      $200.00 for facilities

applications for facilities,                                 with an operational

certified pursuant to 10 V.S.A.           capacity less than

§§ 6605 and 6605b, that treat,                       25,000 cubic yards;

store, or dispose of waste                               for facilities with

generated solely from mining,                          operational capacity

extraction, or mineral processing         above 25,000 cubic

                                                                                    yards $0.95 per cubic

                                                                                    yard of operational

                                                                                    capacity.

                                                                                    Maximum annual

                                                                                    payment, $75,000.00.

(F) increase in tonnage, excluding                   $0.75 per ton of certified

recycling and composting facilities,                  and operational capacity

categorical solid waste facilities           prorated and paid on an

                                                                                    annual basis over the term

of certification.

(G) insignificant waste management                 $100.00 per event.

(7) For public water supply and bottled water permits and approvals issued under 10 V.S.A. chapter 56 and interim groundwater withdrawal permits and approvals issued under 10 V.S.A. chapter 48:

(A) For public water supply construction permit and permit amendment applications:

(i) For public community and nontransient noncommunity water supplies: $900.00.

(ii) For transient noncommunity: $500.00.

(B) For water treatment plant applications, except those applications submitted by a municipality as defined in 1 V.S.A. § 126 or a consolidated water district established under 24 V.S.A. § 3342: $0.003 per gallon of design capacity. Amendments $150.00 per application.

(C) For source permit applications:

(i) Community water systems:                    $945.00 per source.

(ii) Transient noncommunity:           $385.00 per source.

(iii) Nontransient, noncommunity:         $770.00 per source.

(iv) Amendments.                                      $150.00 per application.

(D) For public water supplies and bottled water facilities, annually:

     (i) Transient noncommunity:                       $100.00.

       (ii) Nontransient, noncommunity:                $0.0355 per 1,000 gallons of water produced annu-

ally or $70.00, whichever is greater.

      (iii) Community:                                          $0.05 per 1,000 gallons

of water produced annu-

                                                ally.

       (iv) Bottled water:                          $1,390.00 per permitted

                                                                        facility.

 (E) Amendment to bottled water facility permit, $150.00 per application.

 (F) For facilities permitted to withdraw groundwater pursuant to 10 V.S.A. § 1418: $2,300.00 annually per facility.

 (G) In calculating flow-based fees under this subsection, the Secretary will use metered production flows where available. When metered production flows are not available, the Secretary shall estimate flows based on the standard design flows for new construction.

 (H) The Secretary shall bill public water supplies and bottled water companies  for the required fee. Annual fees may be divided into semiannual or quarterly  billings.

(8) For public water system operator certifications issued under 10 V.S.A. § 1674:

(A) For class IA and IB operators:        $45.00 per initial certificate or

                                                            renewal.

  (B) For all other classes:                        $80.00 per initial certificate or

                                                               renewal.

  (9)(A) For a solid waste hauler:

(i) $50.00 per vehicle for small vehicles with two axels, including pickup trucks, utility trailers, and stakebody trucks.

(ii) $75.00 per vehicle for vehicles with three or four axels, including packer trucks, dump trucks, and roll offs.

(iii) $100.00 per vehicle for tractors and any number axel tandem trailers.

(B) For a hazardous waste hauler: an annual operating fee of $125.00 per vehicle.

(10) For management of lakes and ponds permits issued under 29 V.S.A. chapter 11:

    (A) Nonstructural erosion control:                    $155.00 per application.

 (B) Structural erosion control:              $250.00 per application.

 (C) All other encroachments:                $300.00 per application

plus one percent of

construction costs, not

to exceed $20,000.00

                                                                        per application.

(11) For stream alteration and flood hazard area permits issued under 10 V.S.A. chapters 41 and 32:

(A) Stream alteration; individual permit: $350.00.

(B) Stream alteration; general permit; reporting category: $200.00.

(C) Stream alteration; individual permit; municipal bridge, culvert, and unimproved property protection: $350.00.

(D) Stream alteration; general permit; municipal bridge, culvert, and unimproved property protection: $200.00.

(E) Stream alteration; Agency of Transportation reviews; bridge, culvert, and high risk projects: $350.00.

(F) Flood hazard area; individual permit; State facilities; hydraulic and hydrologic modeling required: $350.00.

(G) Flood hazard area; individual permit; State facilities; hydraulic and hydrologic modeling not required: $200.00.

(H) Flood hazard area; municipal reviews; reviews requiring hydraulic and hydrologic modeling, compensatory storage volumetric analysis, or river corridor equilibrium: $350.00.

(I) Flood hazard area; municipal review; projects not requiring hydraulic or hydrologic modeling: $200.00.

(J) River corridor; major map amendments: $350.00.

(12)(A) For dam permits issued under 10 V.S.A. chapter 43: 1.00 percent of construction costs, minimum fee of $1,000.00.

     (B) For all dams capable of impounding 500,000 or more cubic feet of water or other liquid, an annual fee:

(i) for dams classified as low risk: $200.00 per year.

(ii) for dams classified as significant risk: $350.00 per year.

(iii) for dams classified as high risk: $1,000.00 per year.

(iv) for dams that have not been classified by the Department: $0.00 per year.

(13) For aquatic nuisance control permits issued under 10 V.S.A. § 1455:

  (A) Projects in private waters, as that term is defined in 10 V.S.A. § 5210:

(i) Aquatic pesticide aqua-                    $50.00 per application.

shade, Copper compounds used

as algicides

(ii) All other pesticides              $75.00 per application.

and chemicals

(iii) Bottom barriers, Pow-                    $35.00 per application.

 ered mechanical devices

(iv) Structural controls,              $75.00 per application.

Biological controls

(v) Approval under general permit         $25.00 per approval.

  (B) Projects in all other waters:

(i) All pesticides and other                     $500.00 per application.

chemicals

(ii) Bottom barriers                               $75.00 per application.

(iii) Powered mechanical                       $175.00 per application.

devices

(iv) Structural controls,              $300.00 per application.

Biological controls

(v) Approval under general permit         $50.00 per approval.

(14) Repealed.]

(15) For sludge or septage facility certifications issued under 10 V.S.A. chapter 159:

(A) land application sites; facilities that further reduce pathogens; disposal facilities:                                                      $1,000.00 per application.

(B) all other types of facilities:             $125.00 per application.

(16) For underground storage tank permits issued under 10 V.S.A. chapter 59:                                                                $125.00 per tank per year.

(17) For hazardous waste treatment, storage, or disposal facility certifications issued under 10 V.S.A. chapter 159:

  (A) original application                                    $5,775.00.

  (B) annual operating fee:

(i) commercial facilities              $2,000.00.

(ii) captive facilities                                $1,100.00.

  (C) renewal application                                   $0.00.

(18) For recycle or reuse exemptions issued under 10 V.S.A. §§ 6602(9) and 6603(1):

  (A) initial determination of exemption   $100.00.

  (B) administrative modifications                       $100.00.

  (C) all other modifications                               $50.00.

(19) For delistings of hazardous waste issued under 10 V.S.A. §§ 6602(4) and 6603(1):                                                 $265.00 per application.

(20) For underground storage tank tester licenses issued under 10 V.S.A. § 1936:

  (A) original application                                    $50.00.

  (B) renewal application                                   $50.00.

(21) Repealed.]

(22) For certificates of need issued under 10 V.S.A. § 6606a:

                                                                                    $7,500.00 per application.

(23) Notwithstanding all other subdivisions of this subsection, for administrative amendments of the listed permits, licenses, certifications, approvals, and exemptions, the Secretary may charge less than the listed fees, provided that the amount charged is no less than $35.00 and is sufficient to cover the costs with processing the administrative amendment.

(24) Repealed.]

(25) For hazardous waste generator registrations required by 10 V.S.A. § 6608(f):

  (A) small quantity generators                             $125.00 per year.

  (B) large quantity generators                              $600.00 per year.

  (C) conditionally exempt generators                   $75.00 per year.

Subdivision (j)(26) effective until July 1, 2019; see also subdivision (j)(26) effective July 1, 2019 .

(26) For individual conditional use determinations, for individual wetland permits, for general conditional use determinations issued under 10 V.S.A. § 1272, or for wetland authorizations issued under a general permit, an administrative processing fee assessed under subdivision (2) of this subsection and an application fee of:

(A) $0.75 per square foot of proposed impact to Class I or II wetlands.

(B) $0.25 per square foot of proposed impact to Class I or II wetland buffers.

(C) Maximum fee, for the conversion of Class II wetlands or wetland buffers to cropland use or for installation of a pipeline in a wetland for the transport of manure for the purpose of farming, as that term is defined in 10 V.S.A. § 6001(22), when the pipeline will serve or implement a water quality or conservation practice, $200.00 per application. As used in this subdivision, "cropland" means land that is used for the production of agricultural crops, including row crops, fibrous plants, pasture, fruit-bearing bushes, trees, or vines, and the production of Christmas trees.

(D) $0.25 per square foot of proposed impact to Class I or II wetlands or Class I or II wetland buffer for utility line, pipeline, and ski trail projects when the proposed impact is limited to clearing forested wetlands in a corridor and maintaining a cleared condition in that corridor for the project life.

(E) $1.50 per square foot of impact to Class I or II wetlands when the permit is sought after the impact has taken place.

(F) $100.00 per revision to an application for an individual wetland permit or authorization under a general permit when the supplement is due to a change to the project that was not requested by the Secretary.

(G) Minimum fee, $50.00 per application.

 

Subdivision (j)(26) effective July 1, 2019; see also subdivision (j)(26) effective until July 1, 2019 .

(26) For individual conditional use determinations, for individual wetland permits, for general conditional use determinations issued under 10 V.S.A. § 1272, or for wetland authorizations issued under a general permit, an administrative processing fee assessed under subdivision (2) of this subsection and an application fee of:

(A) $0.75 per square foot of proposed impact to Class I or II wetlands.

(B) $0.25 per square foot of proposed impact to Class I or II wetland buffers.

(C) Maximum fee, for the conversion of Class II wetlands or wetland buffers to cropland use, $200.00 per application. As used in this subdivision, "cropland" means land that is used for the production of agricultural crops, including row crops, fibrous plants, pasture, fruit-bearing bushes, trees, or vines, and the production of Christmas trees.

(D) $0.25 per square foot of proposed impact to Class I or II wetlands or Class I or II wetland buffer for utility line, pipeline, and ski trail projects when the proposed impact is limited to clearing forested wetlands in a corridor and maintaining a cleared condition in that corridor for the project life.

(E) $1.50 per square foot of impact to Class I or II wetlands when the permit is sought after the impact has taken place.

(F) $100.00 per revision to an application for an individual wetland permit or authorization under a general permit when the supplement is due to a change to the project that was not requested by the Secretary.

(G) Minimum fee, $50.00 per application.

(27) For approvals of the operation of mineral prospecting equipment issued under 10 V.S.A. chapter 41:

(A) annual approval for a resident $25.00. (B) annual approval for a nonresident $50.00.

(28) For approvals of the offset permits issued under 10 V.S.A. § 1264a:

(A) Individual offset permit $300.00. (B) General offset permit $100.00.

(29) For salvage yards permitted under 24 V.S.A chapter 61, subchapter 10:

(A) facilities that crush or shred $1,250.00 per facility. junk motor vehicles. (B) facilities that accept or $750.00 per facility. dismantle junk motor vehicles. (C) facilities that manage junk $350.00 per facility. on site excluding junk motor vehicles. (D) facilities the primary activity $300.00 per facility. of which is handling total-loss vehicles from insurance companies.

(30) For review of a project requiring water quality certification under Section 401 of the Clean Water Act: one percent of project costs; minimum fee $200.00; maximum fee $20,000.00. For an application seeking review of multiple projects under this subdivision, the fee shall apply to each project.

(31) For continuing review of plans required by 10 V.S.A. § 6673: $15,000.00.

(32) For projects taking place in a protected shoreland area that require:

(A) a registration under 10 V.S.A. § 1446: $100.00;

(B) a permit under 10 V.S.A. §§ 1443, 1444, and 1445: $125.00 plus $0.50 per square foot of impervious surface.

(33) $10.00 per 1,000 gallons based on the rated capacity of the tank being pumped rounded to the nearest 1,000 gallon.

(k) Any person required to pay a fee to register an air contaminant source under 10 V.S.A. § 555(c) and who emits five or more tons per year shall pay fees as follows:

(1) Where the emissions are resulting from the combustion of any of the following fuels in fuel burning or manufacturing process equipment:

(A)(i) Wood-$0.1915 per ton burned; or

(ii) Wood burned in electric utility units with advanced particulate matter and nitrogen oxide reduction technologies-$0.0607 per ton burned;

(B) No. 4, 5, 6 grade fuel oil and used oil-$0.0015 per gallon burned;

(C) No. 2 grade fuel oil-$0.0005 per gallon burned;

(D) Propane-$0.0003 per gallon burned;

(E) Natural gas-$2.745 per million cubic feet burned;

(F) Diesel generator-$0.0055 per gallon burned;

(G) Gas turbine using No. 2 grade fuel oil-$0.0022 per gallon burned.

(2) For the emission of any hazardous air contaminant not subject to subdivision (1) of this subsection:

(A) Contaminants which cause short-term irritant effects-$0.02 per pound of emissions;

(B) Contaminants which cause chronic systemic toxicity-$0.04 per pound of emissions;

(C) Contaminants known or suspected to cause cancer -$0.95 per pound of emissions.

(l) [Repealed.]

(m)(1) Except as provided in subdivision (3) of this subsection, in addition to any other requirement or fee required for registration, on and after January 1, 1994, a motor vehicle registered under 23 V.S.A. chapter 7 shall be assessed an annual emission fee of $2.00 at time of first registration and annually thereafter.

(2) The Department of Motor Vehicles shall collect the emission fee imposed in subdivision (1) of this subsection on an annual basis, consistent with the registration period. Notwithstanding 19 V.S.A. § 11, all funds collected shall be credited to the Fund established under section 2805 of this title.

(3) The fee imposed under subdivision (1) of this subsection shall not apply to any electrically powered vehicle, trailer, or government vehicle.

(4) The Department of Motor Vehicles shall not issue a registration for any vehicle for which the emission fee required under this subsection has not been paid.

(n) [Repealed.]  (Added 1969, No. 246 (Adj. Sess.), § 4(b), (h), eff. June 1, 1970; amended 1971, No. 93, § 3, eff. April 22, 1971; 1971, No. 164 (Adj. Sess.), eff. March 21, 1972; 1975, No. 254 (Adj. Sess.), § 155; 1977, No. 78, § 1, eff. April 26, 1977; 1977, No. 106, § 2; 1979, No. 159 (Adj. Sess.), § 3; 1981, No. 222 (Adj. Sess.), § 2; 1983, No. 193 (Adj. Sess.), § 1, eff. April 27, 1984; 1985, No. 67, § 4; 1987, No. 76, §§ 1, 2, 18; 1987, No. 268 (Adj. Sess.), § 1, eff. June 21, 1988; 1989, No. 88, § 3; 1989, No. 98, § 4(a); 1989, No. 279 (Adj. Sess.), §§ 4, 8; 1991, No. 71, §§ 4, 4b; 1993, No. 48, §§ 1, 2, eff. June 1, 1993; 1993, No. 92, §§ 16, 17; 1993, No. 187 (Adj. Sess.), § 3, eff. Sept. 1, 1994; 1993, No. 221 (Adj. Sess.), § 4g; 1995, No. 48, § 1; 1995, No. 103 (Adj. Sess.), § 8; 1995, No. 141 (Adj. Sess.), § 9, eff. Apr. 30, 1996; 1997, No. 106 (Adj. Sess.), §§ 3, 4, eff. April 27, 1998; 1997, No. 155 (Adj. Sess.), § 32; 2001, No. 65, §§ 23, 24, 26; 2001, No. 133 (Adj. Sess.), § 2, eff. June 13, 2002; 2001, No. 143 (Adj. Sess.), §§ 52, 54, eff. June 21, 2002; 2003, No. 82 (Adj. Sess.), § 4; 2003, No. 140 (Adj. Sess.), § 5; 2003, No. 163 (Adj. Sess.), § 19; 2005, No. 15, § 1; 2005, No. 65, § 1; 2007, No. 76, §§ 30, 30a; 2007, No. 122 (Adj. Sess.), § 1; 2007, No. 153 (Adj. Sess.), § 3; 2007, No. 176 (Adj. Sess.), § 5, eff. May 28, 2008; 2009, No. 3, § 12a, eff. Sept. 1, 2009; 2009, No. 43, § 37, eff. May 27, 2009; 2009, No. 46, § 10b; 2009, No. 134 (Adj. Sess.), § 30; 2011, No. 139 (Adj. Sess.), § 4, eff. May 14, 2012; 2011, No. 161 (Adj. Sess.), § 1; 2013, No. 58, § 2, eff. June 3, 2013; 2013, No. 59, § 10; 2013, No. 172 (Adj. Sess.), § 6; 2015, No. 57, § 21; 2015, No. 58, § E.225.4; 2015, No. 64, § 44; 2015, No. 97 (Adj. Sess.), § 6; 2015, No. 149 (Adj. Sess.), § 45; 2015, No. 156 (Adj. Sess.), § 14a, eff. Jan. 1, 2017; 2015, No. 159 (Adj. Sess.), § 56; 2017, No. 77, § 7, eff. Jan. 1, 2018; 2017, No. 168 (Adj. Sess.), § 14; 2017, No. 181 (Adj. Sess.), § 7, eff. May 28, 2018; 2017, No. 194 (Adj. Sess.), § 8, eff. May 30, 2018; 2017, No. 194 (Adj. Sess.), § 8a, eff. July 1, 2019.)

Disclaimer: These codes may not be the most recent version. Vermont may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.