§ 8005. Sustainably priced energy enterprise development (SPEED) program

(a) In order to achieve the goals of section 8001 of this title, there is created the Sustainably Priced Energy Enterprise Development (SPEED) program. The SPEED program shall have two categories of projects: qualifying SPEED resources and nonqualifying SPEED resources.

(b) The SPEED program shall be established, by rule, order, or contract, by the board. As part of the SPEED program, the board may, and in the case of subdivisions (1), (2), and (5) of this subsection shall:

(1) Name one or more entities to become engaged in the purchase and resale of electricity generated within the state by means of qualifying SPEED resources or nonqualifying SPEED resources, and shall implement the standard offer required by subdivision (2) of this subsection through this entity or entities. An entity appointed under this subdivision shall be known as a SPEED facilitator.

(2) Issue standard offers for qualifying SPEED resources with a plant capacity of 2.2 MW or less. These standard offers shall be available until the cumulative plant capacity of all such resources commissioned in the state that have accepted a standard offer under this subdivision (2) equals or exceeds 50 MW; provided, however, that a plant owned and operated by a Vermont retail electricity provider shall count toward this 50-MW ceiling if the plant has a plant capacity of 2.2 MW or less and is commissioned on or after September 30, 2009. The term of a standard offer required by this subdivision (2) shall be 10 to 20 years, except that the term of a standard offer for a plant using solar power shall be 10 to 25 years. The price paid to a plant owner under a standard offer required by this subdivision shall include an amount for each kWh generated that shall be set as follows:

(A) Until the board determines the price to be paid to a plant owner in accordance with subdivision (2)(B) of this subsection, the price shall be:

(i) For a plant using methane derived from a landfill or an agricultural operation, $0.12 per kWh.

(ii) For a plant using wind power that has a plant capacity of 15 kW or less, $0.20 per kWh.

(iii) For a plant using solar power, $0.30 per kWh.

(iv) For a plant using hydropower, wind power with a plant capacity greater than 15 kW, or biomass power that is not subject to subdivision (2)(A)(i) of this subsection, a price equal, at the time of the plant's commissioning, to the average residential rate per kWh charged by all of the state's retail electricity providers weighted in accordance with each such provider's share of the state's electric load.

(B) In accordance with the provisions of this subdivision, the board by order shall set the price to be paid to a plant owner under a standard offer, including the owner of a plant described in subdivisions (2)(A)(i)-(iv) of this subsection.

(i) The board shall use the following criteria in setting a price under this subdivision:

(I) The board shall determine a generic cost, based on an economic analysis, for each category of generation technology that constitutes renewable energy. In conducting such an economic analysis the board shall: (aa) Include a generic assumption that reflects reasonably available tax credits and other incentives provided by federal and state governments and other sources applicable to the category of generation technology. For the purpose of this subdivision (2)(B), the term "tax credits and other incentives" excludes tradeable renewable energy credits. (bb) Consider different generic costs for subcategories of different plant capacities within each category of generation technology.

(II) The board shall include a rate of return on equity not less than the highest rate of return on equity received by a Vermont investor-owned retail electric service provider under its board-approved rates as of the date a standard offer goes into effect.

(III) The board shall include such adjustment to the generic costs and rate of return on equity determined under subdivisions (2)(B)(i)(I) and (II) of this subsection as the board determines to be necessary to ensure that the price provides sufficient incentive for the rapid development and commissioning of plants and does not exceed the amount needed to provide such an incentive.

(ii) No later than September 15, 2009, the board shall open and complete a noncontested case docket to accomplish each of the following tasks:

(I) Determine whether there is a substantial likelihood that one or more of the prices stated in subdivision (2)(A) of this subsection do not constitute a reasonable approximation of the price that would be paid applying the criteria of subdivision (2)(B)(i).

(II) If the board determines that one or more of the prices stated in subdivision (2)(A) of this subsection do not constitute such an approximation, set interim prices that constitute a reasonable approximation of the price that would be paid applying the criteria of subdivision (2)(B)(i). Once the board sets such an interim price, that interim price shall be used in subsequent standard offers until the board sets prices under subdivision (2)(B)(iii) of this subsection.

(iii) Regardless of its determination under subdivision (2)(B)(ii) of this subsection, the board shall proceed to set, no later than January 15, 2010, the price to be paid to a plant owner under a standard offer applying the criteria of subdivision (2)(B)(i) of this subsection.

(C) On or before January 15, 2012 and on or before every second January 15 after that date, the board shall review the prices set under subdivision (2)(B) of this subsection and determine whether such prices are providing sufficient incentive for the rapid development and commissioning of plants. In the event the board determines that such a price is inadequate or excessive, the board shall reestablish the price, in accordance with the requirements of subdivision (2)(B)(i) of this subsection, for effect on a prospective basis commencing two months after the price has been reestablished.

(D) Once the board determines, under subdivision (2)(B) or (C) of this subsection, the generic cost and rate of return elements for a category of renewable energy, the price paid to a plant owner under a subsequently executed standard offer contract shall comply with that determination.

(E) A plant owner who has executed a contract for a standard offer under this section prior to a determination by the board under subdivision (2)(B) or (C) of this subsection shall continue to receive the price agreed on in that contract.

(F) Notwithstanding any other provision of this section, on and after June 8, 2010, a standard offer shall be available for a qualifying existing plant.

(i) For the purpose of this subdivision, "qualifying existing plant" means a plant that meets all of the following:

(I) The plant was commissioned on or before September 30, 2009.

(II) The plant generates electricity using methane derived from an agricultural operation and has a plant capacity of 2.2 MW or less.

(III) On or before September 30, 2009, the plant owner had a contract with a Vermont retail electricity provider to supply energy or attributes, including tradeable renewable energy credits from the plant, in connection with a renewable energy pricing program approved under section 8003 of this title.

(ii) Plant capacity of a plant accepting a standard offer pursuant to this subdivision (2)(F) shall not be counted toward the 50-MW amount under this subsection (b).

(iii) Award of a standard offer under this subdivision (2)(F) shall be on condition that the plant owner and the retail electricity provider agree to modify any existing contract between them described under subdivision (i)(III) of this subdivision (2)(F) so that the contract no longer requires energy from the plant to be provided to the retail electricity provider. Those provisions of such a contract that concern tradeable renewable energy credits associated with the plant may remain in force.

(iv) The price and term of a standard offer contract under this subdivision (2)(F) shall be the same, as of the date such a contract is executed, as the price and term otherwise in effect under this subsection (b) for a plant that uses methane derived from an agricultural operation.

(G) Notwithstanding the requirement of this subsection (b) that a standard offer be available for qualifying SPEED resources, the board shall make a standard offer available under this subdivision (2) to an existing hydroelectric plant that does not exceed the 2.2 MW plant capacity limit of this subsection. To such plants, the board shall not allocate more of the cumulative 50-MW plant capacity under this subdivision (2) than exceeds the amount of such capacity that is unsubscribed as of January 1, 2012. Before making this standard offer available, the board shall notify potentially eligible plants known to it and shall publish broad public notice of the future availability of the standard offer. The notice shall direct that all potentially eligible plants shall file with the board a statement of interest in the standard offer by a date to be no less than 30 days from the date of the notice. No plant may participate in this standard offer unless it timely files such a st

atement. The filing of such a statement shall constitute the consent of the plant owner to produce such information as the board may reasonably require to carry out this subdivision (2)(G), including information the board deems necessary to determine a generic cost in setting the price. The board shall have authority to require the production of such information from a plant that files a statement of interest. For the purpose of this subdivision (2)(G):

(i) "Existing hydroelectric plant" means a hydroelectric plant located in the state that was in service as of January 1, 2009 and does not, as of the effective date of this subdivision (2)(G), have an agreement with the board's purchasing agent for the purchase of its power pursuant to subdivision 209(a)(8) of this title and board rules adopted under that subdivision. The term includes hydroelectric plants that have never had such an agreement and hydroelectric plants for which such an agreement expired prior to May 25, 2011.

(ii) The provisions of subdivisions (2)(B)(i)(I)-(III) of this subsection (standard offer pricing criteria) shall apply, except that:

(I) The term "generic cost," when applied by the board to determine the price of a standard offer for an existing hydroelectric plant, shall mean the cost to own, reliably operate, and maintain such a plant for the duration of the standard offer contract. In determining this cost, the board shall consider including a generic assumption with respect to rehabilitation costs based on relevant factors such as the age of the potentially eligible plants; recently constructed or currently proposed rehabilitations to such plants; the investment that a reasonably prudent person would have made in such a plant to date under the circumstances of the plant, including the price received for power; and the availability for such a plant of improved technology.

(II) The incentive described under subdivision (2)(B)(i)(III) of this subsection shall be an incentive for continued safe, efficient, and reliable operation of existing hydroelectric plants.

(3) Maximize the benefit to rate payers from the sale of tradeable renewable energy credits or other credits that may be developed in the future, especially with regard to those plants that accept the standard offer issued under subdivision (2) of this subsection.

(4) Encourage retail electricity provider and third party developer sponsorship and partnerships in the development of renewable energy projects.

(5) Require all Vermont retail electricity providers to purchase from the SPEED facilitator, in accordance with subdivision (g)(2) of this section, the power generated by the plants that accept the standard offer required to be issued under subdivision (2) of this subsection. For the purpose of this subdivision (5), the board and the SPEED facilitator constitute instrumentalities of the state.

(6) Establish a method for Vermont retail electrical providers to obtain beneficial ownership of the renewable energy credits associated with any SPEED projects, in the event that a renewable portfolio standard comes into effect under the provisions of section 8004 of this title. It shall be a condition of a standard offer required to be issued under subdivision (2) of this subsection that tradeable renewable energy credits associated with a plant that accepts the standard offer are owned by the retail electric providers purchasing power from the plant, except that in the case of a plant using methane from agricultural operations, the plant owner shall retain such credits to be sold separately at the owner's discretion.

(7) Create a mechanism by which a retail electricity provider may establish that it has a sufficient amount of renewable energy, or resources that would otherwise qualify under the provisions of subsection (d) of this section, in its portfolio so that equity requires that the retail electricity provider be relieved, in whole or in part, from requirements established under this subsection that would require a retail electricity provider to purchase SPEED power, provided that this mechanism shall not apply to the requirement to purchase power under subdivision (5) of this subsection. However, a retail electricity provider that establishes that it receives at least 25 percent of its energy from qualifying SPEED resources that were in operation on or before September 30, 2009, shall be exempt and wholly relieved from the requirements of subdivisions (b)(5) (requirement to purchase standard offer power) and (g)(2) (allocation of standard offer electricity and costs) of this section

.

(8) Provide that in any proceeding under subdivision 248(a)(2)(A) of this title, a demonstration of compliance with subdivision 248(b)(2) of this title, relating to establishing need for the facility, shall not be required if the facility is a SPEED resource and if no part of the facility is financed directly or indirectly through investments, other than power contracts, backed by Vermont electricity ratepayers.

(9) Take such other measures as the board finds necessary or appropriate to implement SPEED.

(c) Developers of qualifying and nonqualifying SPEED resources shall be entitled to classification as an eligible facility under chapter 12 of Title 10, relating to the Vermont Economic Development Authority.

(d)(1) The board shall meet on or before January 1, 2012 and open a proceeding to determine the total amount of qualifying SPEED resources that have been supplied to Vermont retail electricity providers or have been issued a certificate of public good. If the board finds that the amount of qualifying SPEED resources coming into service or having been issued a certificate of public good after January 1, 2005 and before July 1, 2012 equals or exceeds total statewide growth in electric retail sales during that time, and in addition, at least five percent of the 2005 total statewide electric retail sales is provided by qualified SPEED resources or would be provided by qualified SPEED resources that have been issued a certificate of public good, or if it finds that the amount of qualifying SPEED resources equals or exceeds 10 percent of total statewide electric retail sales for calendar year 2005, the portfolio standards established under this chapter shall not be in force. The board sha

ll make its determination by January 1, 2013. If the board finds that the goal established has not been met, one year after the board's determination the portfolio standards established under subsection 8004(b) of this title shall take effect.

(2) A state goal is to assure that 20 percent of total statewide electric retail sales before July 1, 2017 shall be generated by SPEED resources. The board shall report to the house and senate committees on natural resources and energy and to the joint energy committee by December 31, 2011 with regard to the state's progress in meeting this goal. In addition, the board shall report to the house and senate committees on natural resources and energy and to the joint energy committee by December 31, 2013 with regard to the state's progress in meeting this goal and, if necessary, shall include any appropriate recommendations for measures that will make attaining the goal more likely.

(3) For the purposes of the determination to be made under this subsection, electricity produced at all facilities owned by or under long-term contract to Vermont retail electricity providers, whether it is generated inside or outside Vermont, that is new renewable energy shall be counted in the calculations under subdivisions (1) and (2) of this subsection.

(e) The board shall provide, by order or rule, the regulations and procedures that are necessary to allow the board and the department to implement, and to supervise further the implementation and maintenance of the SPEED program. These rules shall assure that decisions with respect to certificate of public good applications for SPEED resources shall be made in a timely manner.

(f) In order to encourage joint efforts on the part of regulated companies to purchase power that meets or exceeds the SPEED standards and to secure stable, long-term contracts beneficial to Vermonters, the board may establish standards for pre-approving the recovery of costs incurred on a SPEED project that is the subject of that joint effort.

(g) With respect to executed contracts for standard offers under this section:

(1) Such a contract shall be transferable. The contract transferee shall notify the SPEED facilitator of the contract transfer within 30 days of transfer.

(2) The SPEED facilitator shall distribute the electricity purchased to the Vermont retail electricity providers at the price paid to the plant owners, allocated to the providers based on their pro rata share of total Vermont retail kWh sales for the previous calendar year, and the Vermont retail electricity providers shall accept and pay the SPEED facilitator for the electricity.

(3) The SPEED facilitator shall transfer any tradeable renewable energy credits attributable to electricity purchased under standard offer contracts to the Vermont retail electricity providers in accordance with their pro rata share of the costs for such electricity as determined under subdivision (2) of this subsection, except that in the case of a plant using methane from agricultural operations, the plant owner shall retain such credits to be sold separately at the owner's discretion.

(4) The SPEED facilitator shall transfer all capacity rights attributable to the plant capacity associated with the electricity purchased under standard offer contracts to the Vermont retail electricity providers in accordance with their pro rata share of the costs for such electricity as determined under subdivision (2) of this subsection.

(5) All reasonable costs of a Vermont retail electricity provider incurred under this subsection shall be included in the provider's revenue requirement for purposes of ratemaking under sections 218, 218d, 225, and 227 of this title. In including such costs, the board shall appropriately account for any credits received under subdivisions (2) and (3) of this subsection. Costs included in a retail electricity provider's revenue requirement under this subdivision shall be allocated to the provider's ratepayers as directed by the board.

(h) With respect to standard offers under this section, the board shall by rule or order:

(1) Determine a SPEED facilitator's reasonable expenses arising from its role and the allocation of such expenses among plant owners and Vermont retail electricity providers.

(2) Determine the manner and timing of payments by a SPEED facilitator to plant owners for energy purchased under an executed contract for a standard offer.

(3) Determine the manner and timing of payments to the SPEED facilitator by the Vermont retail electricity providers for energy distributed to them under executed contracts for standard offers.

(4) Establish reporting requirements of a SPEED facilitator, a plant owner, and a Vermont retail electricity provider.

(i) With respect to standard offers under this section, the board shall determine whether its existing rules sufficiently address metering and the allocation of metering costs, and make such rule revisions as needed to implement the standard offer requirements of this section.

(j) Wood biomass resources that would otherwise constitute qualifying SPEED resources may receive a standard offer under subdivision (b)(2) of this section only if they have a design system efficiency (the sum of full load design thermal output and electric output divided by the heat input) of at least 50 percent.

(k) A Vermont retail electricity provider shall not be eligible for a standard offer contract under subdivision (b)(2) of this section. However, under subdivision (g)(1) of this section, a plant owner may transfer to such a provider all rights associated with a standard offer contract that has been offered to the plant without affecting the plant's status under the standard offer program. In the case of such a transfer of rights, the plant shall not be considered a utility-owned and -operated plant under subdivisions (b)(2) and (g)(2) of this section.

( l ) The existence of a standard offer under subdivision (b)(2) of this section shall not preclude a voluntary contract between a plant owner and a Vermont retail electricity provider on terms that may be different from those under the standard offer. A plant owner who declines a voluntary contract may still accept a standard offer under this section.

(m) The state and its instrumentalities shall not be liable to a plant owner or retail electricity provider with respect to any matter related to SPEED, including costs associated with a standard offer contract under this section or any damages arising from breach of such a contract, the flow of power between a plant and the electric grid, or the interconnection of a plant to that grid.

(n) On or before January 15, 2011 and every second January 15 afterward, the board shall report to the house and senate committees on natural resources and energy concerning the status of the standard offer program under this section. In its report, the board at a minimum shall:

(1) Assess the progress made toward attaining the cumulative statewide capacity ceiling stated in subdivision (b)(2) of this section.

(2) If that cumulative statewide capacity ceiling has not been met, identify the barriers to attaining that ceiling and detail the board's recommendations for overcoming such barriers.

(3) If that cumulative statewide capacity has been met or is likely to be met within a year of the date of the board's report, recommend whether the standard offer program under this section should continue and, if so, whether there should be any modifications to the program. (Added 2005, No. 61, { 4; amended 2005, No. 208 (Adj. Sess.), { 15; 2007, No. 92 (Adj. Sess.), { 22; 2009, No. 45, { 4, eff. May 27, 2009; 2009, No. 159 (Adj. Sess.), §§ 3, 4, 5, 8, eff. June 4, 2010; 2011, No. 47, { 8 (eff. May 25, 2011) and { 18.)

Disclaimer: These codes may not be the most recent version. Vermont may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.