2025 Utah Code
Title 54 - Public Utilities
Chapter 21 - Small Wireless Facilities Deployment Act
Part 3 - Permitting Process for Small Wireless Facilities
Section 303 - Exceptions to permitting.

Universal Citation:
UT Code § 54-21-303 (2025)
Learn more This media-neutral citation is based on the American Association of Law Libraries Universal Citation Guide and is not necessarily the official citation.
Effective 9/1/2018
54-21-303. Exceptions to permitting.
  • (1) Except as provided in Subsection (2), an authority may not require a wireless provider to submit an application, obtain a permit, or pay a rate for:
    • (a) routine maintenance;
    • (b) the replacement of a small wireless facility with a small wireless facility that is substantially similar or smaller in size; or
    • (c) the installation, placement, maintenance, operation, or replacement of a micro wireless facility that is strung on a cable between existing utility poles, in compliance with the National Electrical Safety Code.
  • (2)
    • (a) An authority may require a wireless provider to obtain a permit in accordance with Section 72-7-102 for work that requires excavation or closing of sidewalks or vehicular lanes in a public right-of-way.
    • (b) If an authority requires a permit under Subsection (2)(a), the authority shall process and approve the permit within the same time period the authority processes and approves a permit for all other types of entities.
  • (3)
    • (a) An authority may require advance notice of an activity described in Subsection (1).
    • (b) A wireless provider may replace or upgrade a utility pole only with the approval of the utility pole's owner.


Enacted by Chapter 299, 2018 General Session
Disclaimer: These codes may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.