View Our Newest Version Here

2011 Utah Code
Title 54 Public Utilities
Chapter 18 Siting of High Voltage Power Line Act
Section 302 Public workshops.

54-18-302. Public workshops.
After a public utility files the notice of intent in accordance with Subsection 54-18-301(3) and before it files a land use application, the public utility shall:
(1) conduct informal public workshops at locations along the proposed corridor to provide information about:
(a) the high voltage power line; and
(b) the process for obtaining a land use permit; and
(2) provide notice of the public workshops at least 14 days before a public workshop to:
(a) a newspaper of general circulation in the target study area;
(b) radio stations in the target study area; and
(c) an affected entity.

Disclaimer: These codes may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.