There is a newer version of the Utah Code
2006 Utah Code - Chapter 03b — Groundwater Recharge and Recovery Act
- 73-3b-101 — Short title.
- 73-3b-102 — Definitions.
- 73-3b-103 — Prohibitions.
- 73-3b-104 — Rulemaking power of state engineer.
- 73-3b-105 — Administrative procedures.
- 73-3b-106 — Water right for recharged water -- Change of use of recovered water.
- 73-3b-107 — Recoverable water -- State engineer to determine.
- 73-3b-201 — Application for a recharge permit -- Required information -- Filing fee.
- 73-3b-202 — Issuance of recharge permit -- Criteria -- Conditions.
- 73-3b-203 — Lapse of recharge permit.
- 73-3b-204 — Application for a recovery permit -- Required information.
- 73-3b-205 — Issuance of recovery permit -- Criteria -- Conditions.
- 73-3b-206 — Lapse of recovery permit.
- 73-3b-207 — Assignment of permits.
- 73-3b-208 — Proposed new well -- Compliance with water well construction rules.
- 73-3b-301 — Storage account -- Monitoring and reporting required.
- 73-3b-302 — Fee.
- 73-3b-303 — Modification of recharge or recovery permits.
- 73-3b-401 — Revocation or suspension of recharge and recovery permits.
- 73-3b-402 — Penalty.
Disclaimer: These codes may not be the most recent version. Utah may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google
Privacy Policy and
Terms of Service apply.