2021 US Code
Title 33 - Navigation and Navigable Waters
Chapter 12 - River and Harbor Improvements Generally
Subchapter I - General Provisions
Sec. 549a - Review of navigation, flood control, and water supply projects
33 U.S.C. § 549a (2021) |
§549a. Review of navigation, flood control, and water supply projects |
The Secretary of the Army, acting through the Chief of Engineers, is authorized to review the operation of projects the construction of which has been completed and which were constructed by the Corps of Engineers in the interest of navigation, flood control, water supply, and related purposes, when found advisable due 1 the significantly changed physical or economic conditions, and to report thereon to Congress with recommendations on the advisability of modifying the structures or their operation, and for improving the quality of the environment in the overall public interest. |
(Pub. L. 91–611, title II, §216, Dec. 31, 1970, 84 Stat. 1830.) |
EDITORIAL NOTES
CODIFICATION
Section is from Pub. L. 91–611, popularly known as the "Flood Control Act of 1970". |
1 So in original. Probably should be "due to". |
United States Code, 2018 Edition, Supplement 3, Title 33 - NAVIGATION AND NAVIGABLE WATERS |
Bills and Statutes |
United States Code |
Y 1.2/5: |
Title 33 - NAVIGATION AND NAVIGABLE WATERS CHAPTER 12 - RIVER AND HARBOR IMPROVEMENTS GENERALLY SUBCHAPTER I - GENERAL PROVISIONS Sec. 549a - Review of navigation, flood control, and water supply projects |
section 549a |
2021 |
January 3, 2022 |
No |
standard |
84 Stat. 1830 |
Public Law 91-611 |