2020 US Code
Title 30 - Mineral Lands and Mining
Chapter 22 - Mine Safety and Health
Subchapter III - Interim Mandatory Safety Standards for Underground Coal Mines
Sec. 867 - Grounding of equipment

Download PDF
Citation 30 U.S.C. § 867 (2020)
Section Name §867. Grounding of equipment
Section Text (a) Metallic enclosed power conductors; metallic frames and other equipment; methods

All metallic sheaths, armors, and conduits enclosing power conductors shall be electrically continuous throughout and shall be grounded by methods approved by an authorized representative of the Secretary. Metallic frames, casings, and other enclosures of electric equipment that can become "alive" through failure of insulation or by contact with energized parts shall be grounded by methods approved by an authorized representative of the Secretary. Methods other than grounding which provide no less effective protection may be permitted by the Secretary or his authorized representative.

(b) Frames of offtrack direct current machines; enclosures of related detached components

The frames of all offtrack direct current machines and the enclosures of related detached components shall be effectively grounded, or otherwise maintained at no less safe voltages, by methods approved by an authorized representative of the Secretary.

(c) Stationary high-voltage equipment powered by underground delta systems

The frames of all stationary high-voltage equipment receiving power from ungrounded delta systems shall be grounded by methods approved by an authorized representative of the Secretary.

(d) Repairs of high-voltage lines; exceptions

High-voltage lines, both on the surface and underground, shall be deenergized and grounded before work is performed on them, except that repairs may be permitted, in the case of energized surface high-voltage lines, if such repairs are made by a qualified person in accordance with procedures and safeguards, including, but not limited to a requirement that the operator of such mine provide, test, and maintain protective devices in making such repairs, to be prescribed by the Secretary prior to the operative date of this subchapter.

(e) Deenergizing of underground power circuits on idle days; exceptions

When not in use, power circuits underground shall be deenergized on idle days and idle shifts, except that rectifiers and transformers may remain energized.

Source Credit

(Pub. L. 91–173, title III, §307, Dec. 30, 1969, 83 Stat. 780.)


Editorial Notes EDITORIAL NOTES REFERENCES IN TEXT

For the operative date of this subchapter, referred to in subsec. (d), see section 509 of Pub. L. 91–173, set out as an Effective Date note under section 801 of this title.


STATUTORY NOTES AND RELATED SUBSIDIARIES EFFECTIVE DATE

Section operative 90 days after Dec. 30, 1969, except to the extent an earlier date is specifically provided for in Pub. L. 91–173, see section 509 of Pub. L. 91–173, set out as a note under section 801 of this title.

Publication Title United States Code, 2018 Edition, Supplement 2, Title 30 - MINERAL LANDS AND MINING
Category Bills and Statutes
Collection United States Code
SuDoc Class Number Y 1.2/5:
Contained Within Title 30 - MINERAL LANDS AND MINING
CHAPTER 22 - MINE SAFETY AND HEALTH
SUBCHAPTER III - INTERIM MANDATORY SAFETY STANDARDS FOR UNDERGROUND COAL MINES
Sec. 867 - Grounding of equipment
Contains section 867
Date 2020
Laws In Effect As Of Date January 13, 2021
Positive Law No
Disposition standard
Statutes at Large References 83 Stat. 780
Public Law References Public Law 91-173
Disclaimer: These codes may not be the most recent version. United States may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.