2019 US Code
Title 42 - The Public Health and Welfare
Chapter 92 - Powerplant and Industrial Fuel Use
Subchapter III - Existing Facilities
Part B - Exemptions
Sec. 8353 - General requirements for exemptions

Download PDF
Citation 42 U.S.C. § 8353 (2019)
Section Name §8353. General requirements for exemptions
Section Text (a) Use of mixtures or fluidized bed combustion not feasible

Except in the case of an exemption under section 8352(b), (f), or (i) of this title, the Secretary may grant a permanent exemption for a powerplant under this part only—

(1) if the applicant has demonstrated that the use of a mixture of natural gas or petroleum and coal (or other alternate fuels), for which an exemption under section 8352(b) of this title would be available, is not economically or technically feasible; and

(2) if the Secretary has not made a finding that the use of a method of fluidized bed combustion of coal or an alternate fuel is economically and technically feasible.

(b) No alternative power supply in case of a powerplant

(1) In the case of an exemption under section 8352(b) or (g) of this title, the Secretary may not grant an exemption for an existing powerplant unless he finds that the petitioner has demonstrated that there is no alternative supply of electric power which is available within a reasonable distance at a reasonable cost without impairing short-run or long-run reliability of service and which can be obtained by the petitioner, despite reasonable good faith efforts.

(2) The Secretary shall forward a copy of any such petition to the Federal Energy Regulatory Commission promptly after it is filed with the Secretary and shall consult with the Commission before making any finding on such petition under paragraph (l).

Source Credit

(Pub. L. 95–620, title III, §313, Nov. 9, 1978, 92 Stat. 3313; Pub. L. 100–42, §1(c)(10), (13), May 21, 1987, 101 Stat. 313.)

Editorial Notes AMENDMENTS

1987—Subsec. (a). Pub. L. 100–42, §1(c)(13), struck out "or installation" after "powerplant" in introductory provisions.

Pub. L. 100–42, §1(c)(10), which directed the substitution of "or (i)" for "(i), or (j)" was executed by making the substitution for "(i) or (j)" to reflect the probable intent of Congress.

EXEMPTION FOR CERTAIN ELECTRIC POWERPLANTS AS EFFECTIVE PRIOR TO 180 DAYS AFTER NOVEMBER 9, 1978

For effectiveness of exemption for certain electric powerplants as prior to 180 days after Nov. 9, 1978, see section 902(a) of Pub. L. 95–620, set out as a note under section 8301 of this title.

Publication Title United States Code, 2018 Edition, Supplement 1, Title 42 - THE PUBLIC HEALTH AND WELFARE
Category Bills and Statutes
Collection United States Code
SuDoc Class Number Y 1.2/5:
Contained Within Title 42 - THE PUBLIC HEALTH AND WELFARE
CHAPTER 92 - POWERPLANT AND INDUSTRIAL FUEL USE
SUBCHAPTER III - EXISTING FACILITIES
Part B - Exemptions
Sec. 8353 - General requirements for exemptions
Contains section 8353
Date 2019
Laws In Effect As Of Date January 24, 2020
Positive Law No
Disposition standard
Statutes at Large References 92 Stat. 3313
101 Stat. 313
Public Law References Public Law 95-620, Public Law 100-42
Disclaimer: These codes may not be the most recent version. United States may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.