2018 US Code
Title 50 - War and National Defense
Chapter 42 - Atomic Energy Defense Provisions
Subchapter II - Nuclear Weapons Stockpile Matters
Part B - Tritium
Sec. 2545 - Procedures for meeting tritium production requirements

Download PDF
Citation 50 U.S.C. § 2545 (2018)
Section Name §2545. Procedures for meeting tritium production requirements
Section Text (a) Production of new tritium

The Secretary of Energy shall produce new tritium to meet the requirements of the Nuclear Weapons Stockpile Memorandum at the Tennessee Valley Authority Watts Bar or Sequoyah nuclear power plants consistent with the Secretary's December 22, 1998, decision document designating the Secretary's preferred tritium production technology.

(b) Support

To support the method of tritium production set forth in subsection (a), the Secretary shall design and construct a new tritium extraction facility in the H-Area of the Savannah River Site, Aiken, South Carolina.

(c) Design and engineering development

The Secretary shall—

(1) complete preliminary design and engineering development of the Accelerator Production of Tritium technology design as a backup source of tritium to the source set forth in subsection (a) and consistent with the Secretary's December 22, 1998, decision document; and

(2) make available those funds necessary to complete engineering development and demonstration, preliminary design, and detailed design of key elements of the system consistent with the Secretary's decision document of December 22, 1998.

Source Credit

(Pub. L. 107–314, div. D, title XLII, §4235, formerly Pub. L. 106–65, div. C, title XXXI, §3134, Oct. 5, 1999, 113 Stat. 927; renumbered Pub. L. 107–314, div. D, title XLII, §4235, by Pub. L. 108–136, div. C, title XXXI, §3141(e)(20), Nov. 24, 2003, 117 Stat. 1762.)

Publication Title United States Code, 2018 Edition, Title 50 - WAR AND NATIONAL DEFENSE
Category Bills and Statutes
Collection United States Code
SuDoc Class Number Y 1.2/5:
Contained Within Title 50 - WAR AND NATIONAL DEFENSE
CHAPTER 42 - ATOMIC ENERGY DEFENSE PROVISIONS
SUBCHAPTER II - NUCLEAR WEAPONS STOCKPILE MATTERS
Part B - Tritium
Sec. 2545 - Procedures for meeting tritium production requirements
Contains section 2545
Date 2018
Laws In Effect As Of Date January 14, 2019
Positive Law No
Disposition standard
Statutes at Large References 113 Stat. 927
117 Stat. 1762
Public Law References Public Law 106-65, Public Law 107-314, Public Law 108-136
Disclaimer: These codes may not be the most recent version. United States may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.