2018 US Code
Title 14 - Coast Guard
Subtitle I - Establishment, Powers, Duties, and Administration
Chapter 11 - Acquisitions
Subchapter I - General Provisions
Sec. 1106 - Required contract terms

Download PDF
Citation 14 U.S.C. § 1106 (2018)
Section Name §1106. Required contract terms
Section Text

(a) In General.—The Commandant shall ensure that a contract awarded or a delivery order or task order issued for an acquisition of a capability or an asset with an expected service life of 10 or more years and with a total acquisition cost that is equal to or exceeds $10,000,000—

(1) provides that all certifications for an end-state capability or asset under such contract, delivery order, or task order, respectively, will be conducted by the Commandant or an independent third party, and that self-certification by a contractor or subcontractor is not allowed;

(2) provides that the Commandant shall maintain the authority to establish, approve, and maintain technical requirements;

(3) requires that any measurement of contractor and subcontractor performance be based on the status of all work performed, including the extent to which the work performed met all performance, cost, and schedule requirements;

(4) specifies that, for the acquisition or upgrade of air, surface, or shore capabilities and assets for which compliance with TEMPEST certification is a requirement, the standard for determining such compliance will be the air, surface, or shore standard then used by the Department of the Navy for that type of capability or asset; and

(5) for any contract awarded to acquire an Offshore Patrol Cutter, includes provisions specifying the service life, fatigue life, and days underway in general Atlantic and North Pacific Sea conditions, maximum range, and maximum speed the cutter will be built to achieve.


(b) Prohibited Provisions.—

(1) In general.—The Commandant shall ensure that any contract awarded or delivery order or task order issued by the Coast Guard does not include any provision allowing for equitable adjustment that is not consistent with the Federal Acquisition Regulations.

(2) Extension of program.—A contract, contract modification, or award term extending a contract with a lead systems integrator—

(A) may not include any minimum requirements for the purchase of a given or determinable number of specific capabilities or assets; and

(B) shall be reviewed by an independent third party with expertise in acquisition management, and the results of that review shall be submitted to the appropriate congressional committees at least 60 days prior to the award of the contract, contract modification, or award term.


(c) Integrated Product Teams.—Integrated product teams, and all teams that oversee integrated product teams, shall be chaired by officers, members, or employees of the Coast Guard.

(d) Technical Authority.—The Commandant shall maintain or designate the technical authority to establish, approve, and maintain technical requirements. Any such designation shall be made in writing and may not be delegated to the authority of the Chief Acquisition Officer established by section 308 of this title.

Source Credit

(Added Pub. L. 111–281, title IV, §402(a), Oct. 15, 2010, 124 Stat. 2936, §565; amended Pub. L. 111–330, §1(4), Dec. 22, 2010, 124 Stat. 3569; Pub. L. 115–232, div. C, title XXXV, §3533(f), Aug. 13, 2018, 132 Stat. 2321; renumbered §1106 and amended Pub. L. 115–282, title I, §§108(b), 123(b)(2), Dec. 4, 2018, 132 Stat. 4208, 4240.)

Editorial Notes AMENDMENTS

2018—Pub. L. 115–282, §108(b), renumbered section 565 of this title as this section.

Subsec. (a). Pub. L. 115–232, §3533(f)(1), struck out "awarded or issued by the Coast Guard after the date of enactment of the Coast Guard Authorization Act of 2010" after "$10,000,000" in introductory provisions.

Subsec. (b)(1). Pub. L. 115–232, §3533(f)(2), struck out "after the date of enactment of the Coast Guard Authorization Act of 2010" after "Coast Guard".

Subsec. (d). Pub. L. 115–282, §123(b)(2), substituted "section 308" for "section 56".

2010—Pub. L. 111–330 amended Pub. L. 111–281, §402(a), which enacted this section.

EFFECTIVE DATE OF 2010 AMENDMENT

Pub. L. 111–330, §1, Dec. 22, 2010, 124 Stat. 3569, provided that the amendment made by section 1(4) is effective with the enactment of Pub. L. 111–281.

Publication Title United States Code, 2018 Edition, Title 14 - COAST GUARD
Category Bills and Statutes
Collection United States Code
SuDoc Class Number Y 1.2/5:
Contained Within Title 14 - COAST GUARD
SUBTITLE I - ESTABLISHMENT, POWERS, DUTIES, AND ADMINISTRATION
CHAPTER 11 - ACQUISITIONS
SUBCHAPTER I - GENERAL PROVISIONS
Sec. 1106 - Required contract terms
Contains section 1106
Date 2018
Laws In Effect As Of Date January 14, 2019
Positive Law Yes
Disposition standard
Statutes at Large References 124 Stat. 2936, 3569
132 Stat. 2321, 4208
Public Law References Public Law 111-281, Public Law 111-330, Public Law 115-232, Public Law 115-282
Disclaimer: These codes may not be the most recent version. United States may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.