2017 US Code
Title 42 - The Public Health and Welfare
Chapter 159 - Space Exploration, Technology, and Science
Subchapter II - Expansion of Human Space Flight Beyond the International Space Station and Low-Earth Orbit
Sec. 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle

Download PDF
Citation 42 U.S.C. § 18324 (2017)
Section Name §18324. Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle
Section Text (a) In general

In developing the Space Launch System pursuant to section 18322 of this title and the multi-purpose crew vehicle pursuant to section 18323 of this title, the Administrator shall, to the extent practicable utilize—

(1) existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—

(A) space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and

(B) Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and


(2) associated testing facilities, either in being or under construction as of October 11, 2010.

(b) Discharge of requirements

In meeting the requirements of subsection (a), the Administrator—

(1) shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;

(2) shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;

(3) shall complete construction and activation of the A–3 test stand with a completion goal of September 30, 2013;

(4) may procure, develop, and flight test applicable components; and

(5) shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.

Source Credit

(Pub. L. 111–267, title III, §304, Oct. 11, 2010, 124 Stat. 2816.)

Publication Title United States Code, 2012 Edition, Supplement 5, Title 42 - THE PUBLIC HEALTH AND WELFARE
Category Bills and Statutes
Collection United States Code
SuDoc Class Number Y 1.2/5:
Contained Within Title 42 - THE PUBLIC HEALTH AND WELFARE
CHAPTER 159 - SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE
SUBCHAPTER II - EXPANSION OF HUMAN SPACE FLIGHT BEYOND THE INTERNATIONAL SPACE STATION AND LOW-EARTH ORBIT
Sec. 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle
Contains section 18324
Date 2017
Laws In Effect As Of Date January 12, 2018
Positive Law No
Disposition standard
Statutes at Large References 124 Stat. 2816
Public Law References Public Law 111-267
Disclaimer: These codes may not be the most recent version. United States may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.