2015 US Code
Title 33 - Navigation and Navigable Waters (Sections 1 - 4009)
Chapter 26 - Water Pollution Prevention and Control (Sections 1251 - 1388)
Subchapter II - Grants for Construction of Treatment Works (Sections 1281 - 1301)
Sec. 1298 - Cost effectiveness

View Metadata
Metadata
Publication TitleUnited States Code, 2012 Edition, Supplement 3, Title 33 - NAVIGATION AND NAVIGABLE WATERS
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 33 - NAVIGATION AND NAVIGABLE WATERS
CHAPTER 26 - WATER POLLUTION PREVENTION AND CONTROL
SUBCHAPTER II - GRANTS FOR CONSTRUCTION OF TREATMENT WORKS
Sec. 1298 - Cost effectiveness
Containssection 1298
Date2015
Laws In Effect As Of DateJanuary 3, 2016
Positive LawNo
Dispositionstandard
Source CreditJune 30, 1948, ch. 758, title II, §218, as added Pub. L. 97-117, §19, Dec. 29, 1981, 95 Stat. 1630.
Statutes at Large Reference95 Stat. 1630
Public and Private LawPublic Law 97-117

Download PDF


33 U.S.C. § 1298 (2015)
§1298. Cost effectiveness(a) Congressional statement of policy

It is the policy of Congress that a project for waste treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be considered as an overall waste treatment system for waste treatment and management, and shall be that system which constitutes the most economical and cost-effective combination of devices and systems used in the storage, treatment, recycling, and reclamation of municipal sewage or industrial wastes of a liquid nature to implement section 1281 of this title, or necessary to recycle or reuse water at the most economical cost over the estimated life of the works, including intercepting sewers, outfall sewers, sewage collection systems, pumping power, and other equipment, and their appurtenances; extension, improvements, remodeling, additions, and alterations thereof; elements essential to provide a reliable recycled supply such as standby treatment units and clear well facilities; and any works, including site acquisition of the land that will be an integral part of the treatment process (including land use for the storage of treated wastewater in land treatment systems prior to land application) or which is used for ultimate disposal of residues resulting from such treatment; water efficiency measures and devices; and any other method or system for preventing, abating, reducing, storing, treating, separating, or disposing of municipal waste, including storm water runoff, or industrial waste, including waste in combined storm water and sanitary sewer systems; to meet the requirements of this chapter.

(b) Determination by Administrator as prerequisite to approval of grant

In accordance with the policy set forth in subsection (a) of this section, before the Administrator approves any grant to any State, municipality, or intermunicipal or interstate agency for the erection, building, acquisition, alteration, remodeling, improvement, or extension of any treatment works the Administrator shall determine that the facilities plan of which such treatment works are a part constitutes the most economical and cost-effective combination of treatment works over the life of the project to meet the requirements of this chapter, including, but not limited to, consideration of construction costs, operation, maintenance, and replacement costs.

(c) Value engineering review

In furtherance of the policy set forth in subsection (a) of this section, the Administrator shall require value engineering review in connection with any treatment works, prior to approval of any grant for the erection, building, acquisition, alteration, remodeling, improvement, or extension of such treatment works, in any case in which the cost of such erection, building, acquisition, alteration, remodeling, improvement, or extension is projected to be in excess of $10,000,000. For purposes of this subsection, the term "value engineering review" means a specialized cost control technique which uses a systematic and creative approach to identify and to focus on unnecessarily high cost in a project in order to arrive at a cost saving without sacrificing the reliability or efficiency of the project.

(d) Projects affected

This section applies to projects for waste treatment and management for which no treatment works including a facilities plan for such project have received Federal financial assistance for the preparation of construction plans and specifications under this chapter before December 29, 1981.

(June 30, 1948, ch. 758, title II, §218, as added Pub. L. 97–117, §19, Dec. 29, 1981, 95 Stat. 1630.)

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.