2015 US Code
Title 33 - Navigation and Navigable Waters (Sections 1 - 4009)
Chapter 26 - Water Pollution Prevention and Control (Sections 1251 - 1388)
Subchapter II - Grants for Construction of Treatment Works (Sections 1281 - 1301)
Sec. 1296 - Determination of priority of projects

View Metadata
Metadata
Publication TitleUnited States Code, 2012 Edition, Supplement 3, Title 33 - NAVIGATION AND NAVIGABLE WATERS
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 33 - NAVIGATION AND NAVIGABLE WATERS
CHAPTER 26 - WATER POLLUTION PREVENTION AND CONTROL
SUBCHAPTER II - GRANTS FOR CONSTRUCTION OF TREATMENT WORKS
Sec. 1296 - Determination of priority of projects
Containssection 1296
Date2015
Laws In Effect As Of DateJanuary 3, 2016
Positive LawNo
Dispositionstandard
Source CreditJune 30, 1948, ch. 758, title II, §216, as added Pub. L. 95-217, §40, Dec. 27, 1977, 91 Stat. 1582; amended Pub. L. 97-117, §18, Dec. 29, 1981, 95 Stat. 1630.
Statutes at Large References91 Stat. 1582
95 Stat. 1630
Public and Private LawsPublic Law 95-217, Public Law 97-117

Download PDF


33 U.S.C. § 1296 (2015)
§1296. Determination of priority of projects

Notwithstanding any other provision of this chapter, the determination of the priority to be given each category of projects for construction of publicly owned treatment works within each State shall be made solely by that State, except that if the Administrator, after a public hearing, determines that a specific project will not result in compliance with the enforceable requirements of this chapter, such project shall be removed from the State's priority list and such State shall submit a revised priority list. These categories shall include, but not be limited to (A) secondary treatment, (B) more stringent treatment, (C) infiltration-in-flow correction, (D) major sewer system rehabilitation, (E) new collector sewers and appurtenances, (F) new interceptors and appurtenances, and (G) correction of combined sewer overflows. Not less than 25 per centum of funds allocated to a State in any fiscal year under this subchapter for construction of publicly owned treatment works in such State shall be obligated for those types of projects referred to in clauses (D), (E), (F), and (G) of this section, if such projects are on such State's priority list for that year and are otherwise eligible for funding in that fiscal year. It is the policy of Congress that projects for wastewater treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency shall be projects which, in the estimation of the State, are designed to achieve optimum water quality management, consistent with the public health and water quality goals and requirements of this chapter.

(June 30, 1948, ch. 758, title II, §216, as added Pub. L. 95–217, §40, Dec. 27, 1977, 91 Stat. 1582; amended Pub. L. 97–117, §18, Dec. 29, 1981, 95 Stat. 1630.)

AMENDMENTS

1981—Pub. L. 97–117 inserted provision that it is the policy of Congress that projects for wastewater treatment and management undertaken with Federal financial assistance under this chapter by any State, municipality, or intermunicipal or interstate agency be projects which, in the estimation of the State, are designed to achieve optimum water quality management, consistent with the public health and water quality goals and requirements of this chapter.

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.