2015 US Code
Title 22 - Foreign Relations and Intercourse (Sections 1 - 9141)
Chapter 7 - International Bureaus, Congresses, Etc. (Sections 261 - 290q)
Subchapter IV - International Boundary and Water Commission (Sections 277 - 277i)
Sec. 277d-29 - Rio Grande canalization project; flood and sediment control; agreements authorized; control gates; costs; authorization of appropriations

View Metadata
Metadata
Publication TitleUnited States Code, 2012 Edition, Supplement 3, Title 22 - FOREIGN RELATIONS AND INTERCOURSE
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 22 - FOREIGN RELATIONS AND INTERCOURSE
CHAPTER 7 - INTERNATIONAL BUREAUS, CONGRESSES, ETC.
SUBCHAPTER IV - INTERNATIONAL BOUNDARY AND WATER COMMISSION
Sec. 277d-29 - Rio Grande canalization project; flood and sediment control; agreements authorized; control gates; costs; authorization of appropriations
Containssection 277d-29
Date2015
Laws In Effect As Of DateJanuary 3, 2016
Positive LawNo
Dispositionstandard
Source CreditPub. L. 88-600, Sept. 18, 1964, 78 Stat. 956; Pub. L. 93-126, §7(c), Oct. 18, 1973, 87 Stat. 452.
Statutes at Large References68 Stat. 666
78 Stat. 956
87 Stat. 452
Public and Private LawsPublic Law 88-600, Public Law 93-126

Download PDF


22 U.S.C. § 277d-29 (2015)
§277d–29. Rio Grande canalization project; flood and sediment control; agreements authorized; control gates; costs; authorization of appropriations

For the purposes of facilitating and implementing operation and maintenance of the international Rio Grande canalization project, the United States Commissioner, International Boundary and Water Commission, United States and Mexico, is authorized to enter into agreements with the appropriate official or officials of local organizations, as defined in the Watershed Protection and Flood Prevention Act of August 4, 1954, as amended [16 U.S.C. 1001 et seq.], for the maintenance by said local organizations either directly or indirectly through mutually satisfactory maintenance agreements with others, including the United States, of all those flood and arroyo sediment control dams, together with all related works, hereafter installed or constructed in the Rio Grande watershed between Caballo Dam and El Paso, Texas, in accordance with said Act, and which are necessary, in the opinion of Said Commissioner, to facilitate and implement the operation and maintenance of said project.

Such maintenance agreements between the local organization and the United States shall provide the extent of contribution by the United States as may be mutually agreed by the two parties, based on the degree of benefits to be derived from said dams and related works, and the contribution by the United States may be either in the form of funds or performance of the actual operation and maintenance.

Control gates shall not be installed on any of the dams which, in the opinion of the United States Commissioner, International Boundary and Water Commission, United States and Mexico, are necessary to facilitate and implement the operation and maintenance of the Rio Grande canalization project.

Arrangements made between the United States and the local organizations shall be satisfactory to the Secretary of Agriculture for defraying cost of maintaining such work of improvement in accordance with regulations prescribed by said Secretary.

There is hereby authorized to be appropriated not in excess of $50,000 per annum for contributions to maintenance authorized by this section.

(Pub. L. 88–600, Sept. 18, 1964, 78 Stat. 956; Pub. L. 93–126, §7(c), Oct. 18, 1973, 87 Stat. 452.)

REFERENCES IN TEXT

The Watershed Protection and Flood Prevention Act of August 4, 1954, as amended, referred to in text, is act Aug. 4, 1954, ch. 656, 68 Stat. 666, which is classified principally to chapter 18 (§1001 et seq.) of Title 16, Conservation. For complete classification of this Act to the Code, see Short Title note set out under section 1001 of Title 16 and Tables.

AMENDMENTS

1973—Pub. L. 93–126 substituted "$50,000" for "$23,000".

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.