2014 US Code
Title 42 - The Public Health and Welfare (Sections 1 - 18445)
Chapter 159 - Space Exploration, Technology, and Science (Sections 18301 - 18445)
Subchapter II - Expansion of Human Space Flight Beyond the International Space Station and Low-Earth Orbit (Sections 18321 - 18327)
Sec. 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle
Publication Title | United States Code, 2012 Edition, Supplement 2, Title 42 - THE PUBLIC HEALTH AND WELFARE |
Category | Bills and Statutes |
Collection | United States Code |
SuDoc Class Number | Y 1.2/5: |
Contained Within | Title 42 - THE PUBLIC HEALTH AND WELFARE CHAPTER 159 - SPACE EXPLORATION, TECHNOLOGY, AND SCIENCE SUBCHAPTER II - EXPANSION OF HUMAN SPACE FLIGHT BEYOND THE INTERNATIONAL SPACE STATION AND LOW-EARTH ORBIT Sec. 18324 - Utilization of existing workforce and assets in development of Space Launch System and multi-purpose crew vehicle |
Contains | section 18324 |
Date | 2014 |
Laws In Effect As Of Date | January 5, 2015 |
Positive Law | No |
Disposition | standard |
Source Credit | Pub. L. 111-267, title III, §304, Oct. 11, 2010, 124 Stat. 2816. |
Statutes at Large Reference | 124 Stat. 2816 |
Public and Private Law | Public Law 111-267 |
Download PDF
In developing the Space Launch System pursuant to section 18322 of this title and the multi-purpose crew vehicle pursuant to section 18323 of this title, the Administrator shall, to the extent practicable utilize—
(1) existing contracts, investments, workforce, industrial base, and capabilities from the Space Shuttle and Orion and Ares 1 projects, including—
(A) space-suit development activities for application to, and coordinated development of, a multi-purpose crew vehicle suit and associated life-support requirements with potential development of standard NASA-certified suit and life support systems for use in alternative commercially-developed crew transportation systems; and
(B) Space Shuttle-derived components and Ares 1 components that use existing United States propulsion systems, including liquid fuel engines, external tank or tank-related capability, and solid rocket motor engines; and
(2) associated testing facilities, either in being or under construction as of October 11, 2010.
(b) Discharge of requirementsIn meeting the requirements of subsection (a), the Administrator—
(1) shall, to the extent practicable, utilize ground-based manufacturing capability, ground testing activities, launch and operations infrastructure, and workforce expertise;
(2) shall, to the extent practicable, minimize the modification and development of ground infrastructure and maximize the utilization of existing software, vehicle, and mission operations processes;
(3) shall complete construction and activation of the A–3 test stand with a completion goal of September 30, 2013;
(4) may procure, develop, and flight test applicable components; and
(5) shall take appropriate actions to ensure timely and cost-effective development of the Space Launch System and the multi-purpose crew vehicle, including the use of a procurement approach that incorporates adequate and effective oversight, the facilitation of contractor efficiencies, and the stream-lining of contract and procurement requirements.
(Pub. L. 111–267, title III, §304, Oct. 11, 2010, 124 Stat. 2816.)
Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.