2014 US Code
Title 2 - The Congress (Sections 1 - 6654)
Chapter 30 - Operation and Maintenance of Capitol Complex (Sections 2001 - 2186)
Subchapter VII - Other Entities and Services (Sections 2161 - 2172)
Sec. 2162a - Promoting maximum efficiency in operation of Capitol Power Plant
Publication Title | United States Code, 2012 Edition, Supplement 2, Title 2 - THE CONGRESS |
Category | Bills and Statutes |
Collection | United States Code |
SuDoc Class Number | Y 1.2/5: |
Contained Within | Title 2 - THE CONGRESS CHAPTER 30 - OPERATION AND MAINTENANCE OF CAPITOL COMPLEX SUBCHAPTER VII - OTHER ENTITIES AND SERVICES Sec. 2162a - Promoting maximum efficiency in operation of Capitol Power Plant |
Contains | section 2162a |
Date | 2014 |
Laws In Effect As Of Date | January 5, 2015 |
Positive Law | No |
Disposition | standard |
Source Credit | Pub. L. 110-140, title V, §504, Dec. 19, 2007, 121 Stat. 1656. |
Statutes at Large Reference | 121 Stat. 1656 |
Public and Private Law | Public Law 110-140 |
Download PDF
The Architect of the Capitol shall take such steps as may be necessary to operate the steam boilers at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting steam pressures and adjusting the operation of the boilers to take into account variations in demand, including seasonality, for the use of the system.
(2) Effective dateThe Architect shall implement the steps required under paragraph (1) not later than 30 days after December 19, 2007.
(b) Chiller plant(1) In generalThe Architect of the Capitol shall take such steps as may be necessary to operate the chiller plant at the Capitol Power Plant in the most energy efficient manner possible to minimize carbon emissions and operating costs, including adjusting water temperatures and adjusting the operation of the chillers to take into account variations in demand, including seasonality, for the use of the system.
(2) Effective dateThe Architect shall implement the steps required under paragraph (1) not later than 30 days after December 19, 2007.
(c) MetersNot later than 90 days after December 19, 2007, the Architect of the Capitol shall evaluate the accuracy of the meters in use at the Capitol Power Plant and correct them as necessary.
(d) Report on implementationNot later than 180 days after December 19, 2007, the Architect of the Capitol shall complete the implementation of the requirements of this section and submit a report describing the actions taken and the energy efficiencies achieved to the Committee on Transportation and Infrastructure of the House of Representatives, the Committee on Commerce, Science, and Transportation of the Senate, the Committee on House Administration of the House of Representatives, and the Committee on Rules and Administration of the Senate.
(Pub. L. 110–140, title V, §504, Dec. 19, 2007, 121 Stat. 1656.)
EFFECTIVE DATESection effective on the date that is 1 day after Dec. 19, 2007, see section 1601 of Pub. L. 110–140, set out as a note under section 1824 of this title.
Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.