2013 US Code
Title 42 - The Public Health and Welfare
Chapter 149 - NATIONAL ENERGY POLICY AND PROGRAMS (§§ 15801 - 16538)
Subchapter VI - NUCLEAR MATTERS (§§ 16011 - 16042)
Part B - Next Generation Nuclear Plant Project (§§ 16021 - 16025)
Section 16023 - Project organization

View Metadata
Metadata
Publication TitleUnited States Code, 2012 Edition, Supplement 1, Title 42 - THE PUBLIC HEALTH AND WELFARE
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 42 - THE PUBLIC HEALTH AND WELFARE
CHAPTER 149 - NATIONAL ENERGY POLICY AND PROGRAMS
SUBCHAPTER VI - NUCLEAR MATTERS
Part B - Next Generation Nuclear Plant Project
Sec. 16023 - Project organization
Containssection 16023
Date2013
Laws in Effect as of DateJanuary 16, 2014
Positive LawNo
Dispositionstandard
Source CreditPub. L. 109-58, title VI, §643, Aug. 8, 2005, 119 Stat. 795.
Statutes at Large Reference119 Stat. 795
Public Law ReferencePublic Law 109-58

Download PDF


Project organization - 42 U.S.C. § 16023 (2013)
§16023. Project organization (a) Major project elements

The Project shall consist of the following major program elements:

(1) High-temperature hydrogen production technology development and validation.

(2) Energy conversion technology development and validation.

(3) Nuclear fuel development, characterization, and qualification.

(4) Materials selection, development, testing, and qualification.

(5) Reactor and balance-of-plant design, engineering, safety analysis, and qualification.

(b) Project phases

The Project shall be conducted in the following phases:

(1) First project phase

A first project phase shall be conducted to—

(A) select and validate the appropriate technology under subsection (a)(1);

(B) carry out enabling research, development, and demonstration activities on technologies and components under paragraphs (2) through (4) of subsection (a);

(C) determine whether it is appropriate to combine electricity generation and hydrogen production in a single prototype nuclear reactor and plant; and

(D) carry out initial design activities for a prototype nuclear reactor and plant, including development of design methods and safety analytical methods and studies under subsection (a)(5).

(2) Second project phase

A second project phase shall be conducted to—

(A) continue appropriate activities under paragraphs (1) through (5) of subsection (a);

(B) develop, through a competitive process, a final design for the prototype nuclear reactor and plant;

(C) apply for licenses to construct and operate the prototype nuclear reactor from the Nuclear Regulatory Commission; and

(D) construct and start up operations of the prototype nuclear reactor and its associated hydrogen or electricity production facilities.

(c) Project requirements (1) In general

The Secretary shall ensure that the Project is structured so as to maximize the technical interchange and transfer of technologies and ideas into the Project from other sources of relevant expertise, including—

(A) the nuclear power industry, including nuclear powerplant construction firms, particularly with respect to issues associated with plant design, construction, and operational and safety issues;

(B) the chemical processing industry, particularly with respect to issues relating to—

(i) the use of process energy for production of hydrogen; and

(ii) the integration of technologies developed by the Project into chemical processing environments; and


(C) international efforts in areas related to the Project, particularly with respect to hydrogen production technologies.

(2) International collaboration (A) In general

The Secretary shall seek international cooperation, participation, and financial contributions for the Project.

(B) Assistance from international partners

The Secretary, through the Idaho National Laboratory, may contract for assistance from specialists or facilities from member countries of the Generation IV International Forum, the Russian Federation, or other international partners if the specialists or facilities provide access to cost-effective and relevant skills or test capabilities.

(C) Partner nations

The Project may involve demonstration of selected project objectives in a partner country.

(D) Generation IV International Forum

The Secretary shall ensure that international activities of the Project are coordinated with the Generation IV International Forum.

(3) Review by Nuclear Energy Research Advisory Committee (A) In general

The Nuclear Energy Research Advisory Committee of the Department (referred to in this paragraph as the "NERAC") shall—

(i) review all program plans for the Project and all progress under the Project on an ongoing basis; and

(ii) ensure that important scientific, technical, safety, and program management issues receive attention in the Project and by the Secretary.

(B) Additional expertise

The NERAC shall supplement the expertise of the NERAC or appoint subpanels to incorporate into the review by the NERAC the relevant sources of expertise described under paragraph (1).

(C) Initial review

Not later than 180 days after August 8, 2005, the NERAC shall—

(i) review existing program plans for the Project in light of the recommendations of the document entitled "Design Features and Technology Uncertainties for the Next Generation Nuclear Plant," dated June 30, 2004; and

(ii) address any recommendations of the document not incorporated in program plans for the Project.

(D) First project phase review

On a determination by the Secretary that the appropriate activities under the first project phase under subsection (b)(1) are nearly complete, the Secretary shall request the NERAC to conduct a comprehensive review of the Project and to report to the Secretary the recommendation of the NERAC concerning whether the Project is ready to proceed to the second project phase under subsection (b)(2).

(E) Transmittal of reports to Congress

Not later than 60 days after receiving any report from the NERAC related to the Project, the Secretary shall submit to the appropriate committees of the Senate and the House of Representatives a copy of the report, along with any additional views of the Secretary that the Secretary may consider appropriate.

(Pub. L. 109–58, title VI, §643, Aug. 8, 2005, 119 Stat. 795.)

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.