2011 US Code
Title 16 - Conservation
Chapter 12C - FORT PECK PROJECT (§§ 833 - 833q)
Section 833e - Factors in determining rate schedules

View Metadata
Metadata
Publication TitleUnited States Code, 2006 Edition, Supplement 5, Title 16 - CONSERVATION
CategoryBills and Statutes
CollectionUnited States Code
SuDoc Class NumberY 1.2/5:
Contained WithinTitle 16 - CONSERVATION
CHAPTER 12C - FORT PECK PROJECT
Sec. 833e - Factors in determining rate schedules
Containssection 833e
Date2011
Laws in Effect as of DateJanuary 3, 2012
Positive LawNo
Dispositionstandard
Source CreditMay 18, 1938, ch. 250, §6, 52 Stat. 405; Pub. L. 95-91, title III, §301(b), Aug. 4, 1977, 91 Stat. 578.
Statutes at Large References52 Stat. 405
64 Stat. 1265
91 Stat. 578
Public Law ReferencesPublic Law 95-91

Download PDF
16 USC § 833e (2011)
§833e. Factors in determining rate schedules

It is the intent of Congress that rate schedules for the sale of electric energy which is or may be generated at the Fort Peck project in excess of the amount required for operating the dam and appurtenant works at said project shall be determined with due regard to and predicated upon the fact that such electric energy is developed from water power created as an incident to the construction of the dam in the Missouri River at the Fort Peck project for the purposes set forth in section 833 of this title. Rate schedules shall be drawn having regard to the recovery (upon the basis of the application of such rate schedules to the capacity of the electric facilities of Fort Peck project) of the cost of producing and transmitting such electric energy, including the amortization of the capital investment over a reasonable period of years. Rate schedules shall be based upon an allocation of costs made by the Secretary of Energy. In computing the cost of electric energy developed from water power created as an incident to and a byproduct of the construction of Fort Peck project, the Secretary of Energy may allocate to the costs of electric facilities such a share of the cost of facilities having joint value for the production of electric energy and other purposes as the power development may fairly bear as compared with such other purposes.

(May 18, 1938, ch. 250, §6, 52 Stat. 405; Pub. L. 95–91, title III, §301(b), Aug. 4, 1977, 91 Stat. 578.)

Transfer of Functions

“Secretary of Energy” substituted in text for “Federal Power Commission” pursuant to Pub. L. 95–91, §301(b), which is classified to section 7151(b) of Title 42, The Public Health and Welfare.

Federal Power Commission terminated and its functions, personnel, property, funds, etc., transferred to Secretary of Energy (except for certain functions transferred to Federal Energy Regulatory Commission) by sections 7151(b), 7171(a), 7172(a), 7291, and 7293 of Title 42.

Executive and administrative functions of Federal Power Commission, with certain reservations, transferred to Chairman of such Commission, with authority vested in him to authorize their performance by any officer, employee, or administrative unit under his jurisdiction, by Reorg. Plan No. 9 of 1950, §§1, 2, eff. May 24, 1950, 15 F.R. 3175, 64 Stat. 1265, set out as a note under section 792 of this title.

Disclaimer: These codes may not be the most recent version. The United States Government Printing Office may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the US site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.