Sec. 2215 - Feasibility studies; planning, engineering, and design
§2215. Feasibility studies; planning, engineering, and design (a) Feasibility studies
(1) The Secretary shall not initiate any feasibility study for a water resources project after November 17, 1986, until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost for such study during the period of such study. Not more than one-half of such non-Federal contribution may be made by the provision of services, materials, supplies, or other in-kind services necessary to prepare the feasibility report.
(2) This subsection shall not apply to any water resources study primarily designed for the purposes of navigational improvements in the nature of dams, locks, and channels on the Nation's system of inland waterways.
(b) Planning and engineeringThe Secretary shall not initiate any planning or engineering authorized by this Act for a water resources project until appropriate non-Federal interests agree, by contract, to contribute 50 percent of the cost of the planning and engineering during the period of the planning and engineering. Costs of planning and engineering of projects for which non-Federal interests contributed 50 percent of the cost of the feasibility study shall be treated as costs of construction.
(c) DesignCosts of design of a water resources project shall be shared in the same percentage as the purposes of such project.
(Pub. L. 99–662, title I, §105, Nov. 17, 1986, 100 Stat. 4088; Pub. L. 101–640, title III, §301, Nov. 28, 1990, 104 Stat. 4633.)
References in TextThis Act, referred to in subsec. (b), is Pub. L. 99–662, Nov. 17, 1986, 100 Stat. 4082, as amended, known as the Water Resources Development Act of 1986. For complete classification of this Act to the Code, see Short Title note set out under section 2201 of this title and Tables.
Amendments1990—Subsec. (b). Pub. L. 101–640 inserted at end “Costs of planning and engineering of projects for which non-Federal interests contributed 50 percent of the cost of the feasibility study shall be treated as costs of construction.”
Section Referred to in Other SectionsThis section is referred to in section 2282 of this title.