§49-37-3.1 Criteria considered in development of power systems--Alternative sources--Board determination as to size of facility.


SD Codified L § 49-37-3.1 (through 2011) What's This?

49-37-3.1. Criteria considered in development of power systems--Alternative sources--Board determination as to size of facility. In order to provide electric power and energy to the people of this state at a more economical cost and with greater reliability, the board of directors of a consumers power district in providing for development of power plants, lines and systems or interest therein, for the generation, transmission, and transformation of electric power and energy, shall take into account, among other things, the reliability and availability of existing alternative supply sources and economies and exigencies to be achieved in developing large scale facilities for the generation and transmission of electric power and energy, whether or not such facilities have a capacity or capability in excess of the present or foreseeable needs of such district. A determination by a board of directors as to the size of the facility to be developed shall be made by resolution, and shall be final.

Source: SL 1976, ch 298, § 4.

Disclaimer: These codes may not be the most recent version. South Dakota may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.