2019 Rhode Island General Laws
Title 45 - Towns and Cities
Chapter 45-61.2 The Smart Development for a Cleaner Bay Act of 2007
Section 45-61.2-2 Implementation.

Universal Citation: RI Gen L § 45-61.2-2 (2019)

§ 45-61.2-2. Implementation.

(a) The department of environmental management (DEM), in conjunction with the coastal resources management council (CRMC) shall, by July 1, 2008, amend the Rhode Island stormwater design and installation standards manual. The changes shall include, but not be limited to, incorporation into existing regulatory programs that already include the review of stormwater impacts the following requirements:

(1) Maintain pre-development groundwater recharge and infiltration on site to the maximum extent practicable;

(2) Demonstrate that post-construction stormwater runoff is controlled, and that post-development peak discharge rates do not exceed pre-development peak discharge rates; and

(3) Use low impact-design techniques as the primary method of stormwater control to the maximum extent practicable.

(b) City and town ordinances and regulations may require compliance with the Rhode Island stormwater design and installation standards manual, as amended, for any development, redevelopment, or land disturbance.

History of Section.
(P.L. 2007, ch. 133, § 1; P.L. 2007, ch. 203, § 1; P.L. 2009, ch. 310, § 69; P.L. 2012, ch. 219, § 1; P.L. 2012, ch. 228, § 1.)

Disclaimer: These codes may not be the most recent version. Rhode Island may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.