2022 Pennsylvania Consolidated & Unconsolidated Statutes
Act 27 - CAPITAL BUDGET PROJECT ITEMIZATION ACT OF 2021-2022 - ENACTMENT

 

An Act

 

Providing for the capital budget for fiscal year 2021-2022; itemizing public improvement projects, furniture and equipment projects, transportation assistance, redevelopment assistance projects, flood control projects and Pennsylvania Fish and Boat Commission projects leased or assisted by the Department of General Services and other State agencies, together with their estimated financial costs; authorizing the incurring of debt without the approval of the electors for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies; authorizing the use of current revenue for the purpose of financing the projects to be constructed, acquired or assisted by the Department of General Services and other State agencies stating the estimated useful life of the projects; and making appropriations.

 

The General Assembly of the Commonwealth of Pennsylvania hereby enacts as follows:

Section 1.  Short title.

This act shall be known and may be cited as the Capital Budget Project Itemization Act of 2021-2022.

Section 2.  Total authorizations.

(a)  Public improvements.--The total authorization for the additional capital projects in the category of public improvement projects itemized in section 3 and to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $7,531,796,595.

(b)  Furniture and equipment.--The total authorization for the additional capital projects in the category of public improvement projects consisting of the acquisition of original movable furniture and equipment to complete public improvement projects itemized in section 4 and to be acquired by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt shall be $340,239,190.

(c)  Transportation assistance.--The total authorization for the capital projects in the category of transportation assistance projects itemized in section 5 with respect to which an interest is to be acquired in or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt shall be $471,138,000.

(d)  Redevelopment assistance.--The total authorization for the capital projects in the category of redevelopment capital projects itemized in section 6 for capital grants by the Department of Community and Economic Development, its successors or assigns, and to be financed by the incurring of debt shall be $12,904,190,591.

(e)  Flood control.--The total authorization for the capital projects in the category of flood control projects itemized in section 7 and to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt shall be $112,127,000.

(f)  Fish Fund and Boat Fund.--The total authorization for the capital projects in the category of public improvement projects itemized in section 8 to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by current revenues of the Fish Fund and the Boat Fund pursuant to executive authorization shall be $113,130,000.

Section 3.  Itemization of public improvement capital projects.

Additional capital projects in the category of public improvement projects to be acquired or constructed by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt, are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project

Allocation

(1)  Department of Agriculture

 

(i)  Farm Show Complex

 

(A)  Renovations of the underground (Cameron Street) pedestrian/cyclist walk from Department of Agriculture to the Farm Show Complex and associated pathways

 

Project Allocation

3,000,000

(ii)  Samuel E. Hayes Jr. Livestock Evaluation Center

 

(A)  Renovations to the Livestock Evaluation Center

 

Project Allocation

2,000,000

(iii)  Health Diagnostic Laboratory

 

(A)  Renovations, additions and new construction, including site and infrastructure improvements for design and construction to satisfy modern testing procedures

 

Project Allocation

25,000,000

(2)  Department of Conservation and Natural Resources

 

(i)  Clear Creek Forest District

 

(A)  New maintenance shop and equipment storage

 

Project Allocation

4,000,000

(ii)  Cornplanter Forest District

 

(A)  Office renovation

 

Project Allocation

3,000,000

(ii.1)  Cowans Gap State Park

 

(A)  Rehabilitate Cowans Gap Dam

 

Project Allocation

9,200,000

(iii)  Delaware State Forest

 

(A)  Lilly Pond Dam spillway repair/ replacement

 

Project Allocation

1,350,000

(iii.1)  Hickory Run State Park

 

(A)  Additional funding to replace pit latrines with modern comfort stations

 

Project Allocation

700,000

(iii.2)  Kooser State Park

 

(A)  Day-use improvements and dam rehabilitation

 

Project Allocation

6,250,000

(iii.3)  Laurel Hill State Park

 

(A)  Rehabilitate Penn Scenic View Dam

 

Project Allocation

5,000,000

(iii.4)  Leonard Harrison State Park

 

(A)  Turkey Path Trail rehabilitation and realignment

 

Project Allocation

3,750,000

(iii.5)  McKeever Center

 

(A)  Land acquisition, construction and infrastructure costs

 

Project Allocation

1,000,000

(iii.6)  Memorial Lake State Park

 

(A)  Rehabilitate dam

 

Project Allocation

9,800,000

(iv)  Norristown Farm Park

 

(A)  Replace multiple vehicular and pedestrian bridges

 

Project Allocation

6,250,000

(iv.1)  Parker Dam State Park

 

(A)  Dam repairs and lake dredging

 

Project Allocation

11,250,000

(v)  Pinchot State Forest

 

(A)  Remove Turtle Creek Dam

 

Project Allocation

1,875,000

(vi)  Pinchot Forest District

 

(A)  Remove Race Run Dam

 

Project Allocation

2,000,000

(B)  Remove Dam 148-118 SGL 260

 

Project Allocation

2,000,000

(vi.1)  Point State Park

 

(A)  Portal bridge replacement and park sidewalk rehabilitation and ADA compliance

 

Project Allocation

3,750,000

(vi.2)  Prince Gallitzin State Park

 

(A)  Rehabilitate Sandy Run Dam

 

Project Allocation

12,000,000

(vi.3)  Promised Land State Park

 

(A)  Rehabilitate Promised Land Dam

 

Project Allocation

5,000,000

(vi.4)  Pymatuning State Park

 

(A)  Rehabilitate park and campground facilities

 

Project Allocation

5,000,000

(vi.5)  Raccoon Creek State Park

 

(A)  Extend toe drain at Raccoon Creek Lake Dam

 

Project Allocation

1,250,000

(vi.6)  Shikellamy State Park

 

(A)  Rehabilitate dam

 

Project Allocation

15,000,000

(vii)  Tiadaghton & Tioga Forest Districts

 

(A)  Pine Creek Rail Trail-truss bridges over Pine Creek

 

Project Allocation

6,700,000

(vii.1)  Yellow Creek State Park

 

(A)  Construction, infrastructure, renovations and other related costs for improvements and upgrades

 

Project Allocation

5,850,000

(viii)  Various State Parks - Statewide

 

(A)  Campground facility amenities - construct washhouses, including utility and site work

 

Project Allocation

12,500,000

(B)  Rehabilitate historic structures

 

Project Allocation

12,500,000

(C)  Statewide critical regulatory system repairs and replacements at multiple water and wastewater treatment plants

 

Project Allocation

12,500,000

(D)  New and replacement of roofed overnight colonies and support infrastructure at five State parks

 

Project Allocation

6,250,000

(E)  Construct solar arrays at various State park facilities

 

Project Allocation

15,000,000

(ix)  Bureau of Forestry

 

(A)  New Regional Air Operations facilities

 

Project Allocation

9,600,000

(B)  New Fire Cache/Forestry warehouse - replace main building

 

Project Allocation

7,200,000

(C)  Construct solar arrays at various forestry facilities

 

Project Allocation

3,750,000

(3)  Department of Corrections

 

(i)  Elizabethtown Training Facility

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

3,982,700

(ii)  Quehanna Boot Camp

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

2,793,000

(iii)  State Correctional Institution at Albion

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

4,362,000

(iv)  State Correctional Institution at Benner

 

(A)  Design and construction of a transportation hub, including land development and site infrastructure improvements

 

Project Allocation

3,000,000

(B)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

5,933,490

(v)  State Correctional Institution at Cambridge Springs

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

15,354,000

(vi)  State Correctional Institution at Camp Hill

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

37,425,000

(vii)  State Correctional Institution at Chester

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

6,848,000

(viii)  State Correctional Institution at Coal Township

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

12,567,000

(ix)  State Correctional Institution at Dallas

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

1,657,000

(x)  State Correctional Institution at Fayette

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

15,679,200

(xi)  State Correctional Institution at Forest

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

14,394,000

(xii)  State Correctional Institution at Frackville

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

6,397,900

(xiii)  State Correctional Institution at Graterford

 

(A)  Design and construction of code, permit and site/utility/infrastructure-related issues

 

Project Allocation

650,000

(xiv)  State Correctional Institution at Greene

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

7,462,000

(xv)  State Correctional Institution at Houtzdale

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

11,897,500

(xvi)  State Correctional Institution at Huntingdon

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

14,292,350

(xvii)  State Correctional Institution at Laurel Highlands

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

6,738,300

(xviii)  State Correctional Institution at Mahanoy

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

20,493,500

(xix)  State Correctional Institution at Mercer

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

7,908,500

(xx)  State Correctional Institution at Muncy

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

14,342,980

(xxi)  State Correctional Institution at Pine Grove

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

8,596,000

(xxii)  State Correctional Institution at Retreat

 

(A)  Design and construction of facility upgrades, including land development and site infrastructure improvements and new construction

 

Project Allocation

1,500,000

(xxiii)  State Correctional Institution at Rockview

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

10,131,000

(xxiv)  State Correctional Institution at Smithfield

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

8,375,270

(xxv)  State Correctional Institution at Somerset

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

8,403,610

(xxvi)  State Correctional Institution at Waymart

 

(A)  Design and construction of building expansion, new construction, renovations and alterations, including land development and site infrastructure improvements

 

Project Allocation

19,787,295

(4)  Department of Education

 

(i)  Department of Education Headquarters (Reserved)

 

(ii)  Lincoln University

 

(A)  Infrastructure replacement, upgrade and improvements

 

Project Allocation

26,000,000

(B)  Renovation of Houston Hall

 

Project Allocation

12,000,000

(iii)  The Pennsylvania State University

 

(A)  Davey Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Davey Laboratory at the University Park campus. The project scope includes building systems renewal, including mechanical, electrical, plumbing and sprinkler systems and code upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

100,000,000

(B)  Osmond Laboratory Renovation - Phase II (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Phase II of Osmond Laboratory at the University Park campus. This project will complete the renovation of Osmond Laboratory. The project will renew the remainder of facility by replacing worn systems, improving the thermal envelope, replacing windows and interior finishes. Interior space modifications will be made to meet the needs of the departments and activities currently housed there and into the future. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

40,000,000

(C)  Carpenter Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Carpenter Building at the University Park campus. The Carpenter Building requires building-wide renewal to include building, life safety system and accessibility upgrades. The project includes building systems and envelope renewal/replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

40,000,000

(D)  Student Support and Services Center (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Student Support and Services Center at the University Park campus. A new multistory building will be constructed to provide functional spaces for student support and engagement, admissions and administration. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

90,000,000

(E)  Electrical Engineering West Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering West at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building-wide systems renewal, including mechanical, electrical, plumbing and sprinkler systems to improve efficiency and performance. The building exterior improvements include masonry repair, roof and window replacement. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

65,000,000

(F)  Electrical Engineering East Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Electrical Engineering East at the University Park campus. This project addresses the continuing needs of the College of Engineering. The project scope includes building systems renewal, including mechanical, electrical, plumbing and fire suppression systems to improve efficiency and performance. The building exterior improvements include glazing, curtain wall and door replacement. Interior and accessibility improvements are needed. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

45,000,000

(G)  Pattee Library/Paterno Library Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Pattee Library/Paterno Library at the University Park campus. This project will address aging systems, accessibility concerns, reliability issues and safety concerns. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

60,000,000

(H)  Sparks Building Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Sparks Building at the University Park campus. The project will include building system and envelope renewal and renovation to address programmatic and system needs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

65,000,000

(I)  Applied Research Laboratory Renovation (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Applied Research Laboratory at the University Park campus. The ARL Building requires building-wide renewal to include building systems and envelope renewal/replacement. The project scope also includes life safety system and accessibility upgrades. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

50,000,000

(J)  Capital Renewal, Phase X (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal, Phase X at the University Park campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in the other phases of renewal. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

40,000,000

(K)  Chilled Water Plant (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Chilled Water Plant at the University Park campus. Scope includes new building construction along with the initial chilled water, condenser water and electrical equipment and plant infrastructure. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

80,000,000

(L)  Advanced Water Treatment System (University Park Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Advanced Water Treatment System at the University Park campus. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

15,000,000

(M)  Classroom-Library Building Renovation (and Nursing Addition) (Scranton Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Classroom-Library Building Renovation (and Nursing Addition) at the Scranton campus. A total renovation is needed to address a multitude of deficiencies. An addition for the expansion of the Nursing program is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

20,000,000

(N)  Kelly Library Renovation and Addition (Greater Allegheny Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the Kelly Library Renovation and Addition at the Greater Allegheny campus. A total renovation is needed to address a multitude of deficiencies. An addition for an auditorium is planned. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

20,000,000

(O)  Classroom/Class Lab Teaching and Learning Building (Harrisburg Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Classroom/Class Lab Teaching and Learning Building at the Harrisburg campus. A new multistory Classroom/Class Lab Teaching and Learning Building will be constructed to provide modern classrooms, instructional laboratories, faculty offices, instructional support and flexible/adaptable space to support both general and technology instructional programs, as well as campus engagement activities. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

50,000,000

(P)  Teaching and Administrative Support Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Teaching and Administrative Support Building at the Hershey campus. This project will provide space for key administrative units on campus. The program will include new administrative and support spaces, offices and meeting rooms. The facility will be equipped with state-of-the-art technology. The facility will be located on the core campus adjacent to clinical, administrative, research and academic facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

80,000,000

(Q)  Capital Renewal (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for Capital Renewal at the Hershey campus. This project is part of a continuing effort to make significant comprehensive upgrades to infrastructure in the College of Medicine buildings at the Hershey campus. This project will allow the University to replace, install or upgrade as appropriate systems in major academic, research and administrative buildings across campus that were not addressed in routine renewal programs. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

30,000,000

(R)  Academic and Research Building (Hershey Campus) design, construction (new space or addition to and/or renovation of existing space; including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for an Academic and Research Building at the Hershey campus. This project will include new wet and dry research laboratories, comparative medicine spaces, support spaces, instructional spaces, seminar rooms, offices and administration space. The facility will be equipped with state-of-the-art instructional technology. The facility will be located on the core campus adjacent to academic, clinical and other research facilities easily accessible by students, faculty and visitors. Funding will be used for both design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for both occupant and program relocation or interim facilities will be included. The construction will both meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

160,000,000

(S)  North Wing of Chambers Building (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for the North Wing of Chambers Building at the University Park campus. This project involves the renovation, demolition and reconstruction of Chambers Building. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

60,000,000

(T)  Demolition Program (University Park Campus) design, construction (new space or addition to and/or renovation of existing space, including demolition, abatement of hazardous materials, extensions and/or upgrading of utilities and other infrastructure needs) and other related costs for a Demolition Program at the University Park campus. This project involves the demolition of campus facilities. Funding will be used for design and construction costs, as well as necessary utility upgrades and extensions, site improvements and code-related upgrades. All costs for occupant and program relocation or interim facilities will be included. The construction will meet all current building code requirements and provide for barrier-free access as required by the Americans with Disabilities Act and related codes

 

Project Allocation

10,000,000

(U)  Critical infrastructure improvements to athletic facilities at University Park campus

 

Project Allocation

150,000,000

(V)  Acquisition, reclamation, infrastructure improvements and construction to land and facilities at the Pennsylvania College of Technology in the City of Williamsport

 

Project Allocation

10,000,000

(iv)  Temple University

 

(A)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University

 

Project Allocation

250,000,000

(B)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University

 

Project Allocation

185,000,000

(C)  New classroom building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a classroom building academic complex. This will involve renovating and adding to an existing building or building a stand-alone classroom building

 

Project Allocation

125,000,000

(C.1) New Science, Technology, Engineering and Mathematics (STEM) academic building, addition, renovation - design, infrastructure, abatement of hazardous materials and construction of a STEM academic complex. This will involve renovating and adding to an existing building or building a stand-alone building

 

Project Allocation

125,000,000

(D)  Design, infrastructure, abatement of hazardous materials, renovation and construction of expansion to Ritter Hall, including utility upgrades and extensions, site improvements, code-related upgrades, including ADA compliance-related upgrades

 

Project Allocation

40,000,000

(E)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, educational and exterior facilities of Temple University Hospital and affiliated physician practices

 

Project Allocation

60,000,000

(F)  Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Health System

 

Project Allocation

60,000,000

(G)  Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, educational and exterior facilities of Temple University Health System

 

Project Allocation

30,000,000

(H)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital-Boyer Pavilion

 

Project Allocation

40,000,000

(I)  Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities of Temple University Hospital

 

Project Allocation

60,000,000

(J)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital

 

Project Allocation

60,000,000

(K)  Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Episcopal Campus

 

Project Allocation

40,000,000

(L)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, educational and exterior facilities for Fox Chase Cancer Center

 

Project Allocation

60,000,000

(M)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, educational and exterior facilities for Temple University Hospital Jeanes Campus

 

Project Allocation

40,000,000

(N)  Construction, infrastructure, acquisition, redevelopment and other related costs to be used for academic space at Temple University Main Campus

 

Project Allocation

1,300,000

(v)  Thaddeus Stevens College of Technology

 

(A)  Hartzell renovations

 

Project Allocation

4,000,000

(B)  Jones renovations

 

Project Allocation

5,000,000

(C)  Mellor renovations

 

Project Allocation

20,000,000

(D)  Dorm renovations

 

Project Allocation

7,000,000

(E)  Shop addition

 

Project Allocation

5,000,000

(F)  Student Center addition

 

Project Allocation

5,000,000

(G)  Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements

 

Project Allocation

18,000,000

(H)  Branch Campus improvements to meet current and future demands, including, but not limited to, land acquisition, site and building infrastructure improvements, new construction, renovations and building system upgrades and improvements

 

Project Allocation

8,000,000

(I)  Roof - Renovations, alterations, infrastructure upgrades and associated design and construction expenses at the Bourne, Brenner, Kreider, Hartzell and Metzger Buildings

 

Project Allocation

3,500,000

(J)  Snyder Building - Renovations, alterations, additions, infrastructure upgrades, site improvements and associated design and construction expenses

 

Project Allocation

5,000,000

(K)  ALMS House - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses

 

Project Allocation

25,000,000

(L)  Orange Street Campus - Renovations, repairs, alterations, additions, infrastructure upgrades and associated design and construction expenses

 

Project Allocation

3,500,000

(M)  Main Campus - Sidewalks/road repair

 

Project Allocation

1,500,000

(vi)  University of Pittsburgh

 

(A)  New Integrated Health Sciences Building, Oakland Campus

 

Project Allocation

200,000,000

(B)  New Academic Student Support Center Building, Oakland Campus

 

Project Allocation

80,000,000

(C)  New One Bigelow Academic Teaching and Research Complex, Oakland Campus

 

Project Allocation

300,000,000

(D)  Posvar Hall addition and renovation, Oakland Campus

 

Project Allocation

100,000,000

(E)  Posvar Hall Chiller Plant expansion and upgrade, Oakland Campus

 

Project Allocation

50,000,000

(F)  Programmatic and infrastructure upgrades to buildings, Oakland Campus

 

Project Allocation

50,000,000

(G)  Crabtree Hall renovations, Oakland Campus

 

Project Allocation

110,000,000

(vii)  Butler County Community College

 

(A)  Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space

 

Project Allocation

1,750,000

(5)  Pennsylvania Emergency Management Agency (Reserved)

 

(6)  Department of Environmental Protection

 

(i)  Carbon County

 

(A)  Quakake Treatment Facility - Additional funds for construction of acid mine treatment facility

 

Project Allocation

6,000,000

(ii)  Clarion County

 

(A)  Mill Creek Treatment Facility - Construction of treatment facility

 

Project Allocation

14,000,000

(iii)  Clearfield County

 

(A)  Additional funds for additional culvert alignment under borough streets at Stinky Run

 

Project Allocation

1,000,000

(iv)  Fayette County

 

(A)  Phillips Discharge Treatment Facility - Construction of treatment facility

 

Project Allocation

12,000,000

(v)  Jefferson County

 

(A)  Weisner Hollow - Additional funds to decertify high-hazard dam and construct permanent drainage channel. Regrade and revegetate site

 

Project Allocation

6,500,000

(vi)  Lycoming County

 

(A)  Grafius Run and Freedom Road Tributary - Improve existing culverts in the City of Williamsport

 

Project Allocation

3,500,000

(vii)  Westmoreland County

 

(A)  West Newton Coal Logistics Slope - Embankment stabilization and coal refuse slurry impoundment capping

 

Project Allocation

23,000,000

(7)  Department of General Services

 

(i)  Berks County

 

(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Reading area

 

Project Allocation

15,000,000

(ii)  Dauphin County

 

(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in the Harrisburg area

 

Project Allocation

200,000,000

(B)  Upgrade and expansion of IT infrastructure and automation system redundancy

 

Project Allocation

100,000,000

(C)  Renovations and alterations for upgrades and infrastructure improvements to the Finance Building

 

Project Allocation

100,000,000

(iii)  Lackawanna County

 

(A)  Renovations, alterations, new construction, site improvements, infrastructure upgrades and land acquisition for DGS-owned buildings in Scranton

 

Project Allocation

15,000,000

(iv)  Statewide

 

(A)  Professional services for the development of agency facility strategic master plans and capital planning

 

Project Allocation

15,000,000

(B)  Renovations, alterations, new construction, site improvements and infrastructure upgrades for Commonwealth child-care centers

 

Project Allocation

7,000,000

(7.1)  Department of Health

 

(i)  Bureau of Laboratories

 

(A)  Construct new laboratory, including site and infrastructure improvements

 

Project Allocation

60,000,000

(8)  Department of Human Services

 

(i)  Clarks Summit State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(ii)  Danville State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(iii)  Ebensburg Center

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(iv)  Loysville Youth Development Center

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(v)  Norristown State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(B)  Additional funds for the design and construction of a psychiatric forensic building on existing lands of the Commonwealth at Norristown State Hospital in West Norriton Township to be utilized for the care and treatment of clients admitted to the institution

 

Project Allocation

190,000,000

(vi)  North Central Secure Treatment Unit

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

7,000,000

(vii)  Selinsgrove Center

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(viii)  South Mountain Secure Treatment Unit

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

5,000,000

(ix)  South Mountain Restoration Center

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(x)  Torrance State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(xi)  Warren State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(xii)  Wernersville State Hospital

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(xiii)  Youth Forestry Camp No.2

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

9,000,000

(xiv)  Youth Forestry Camp No.3

 

(A)  Renovate the institution, including new construction, alterations, renovations, site improvements and infrastructure upgrades, and land acquisition

 

Project Allocation

5,000,000

(xv)  Northeast Juvenile Justice Facility

 

(A)  New construction, renovation, rehabilitation, acquisition of land and facility and associated costs in northeastern Pennsylvania

 

Project Allocation

25,000,000

(9)  Pennsylvania Historical and Museum Commission

 

(i)  State Museum

 

(A)  Exhibit upgrades

 

Project Allocation

20,000,000

(ii)  Brandywine Battlefield Park

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

5,000,000

(iii)  Daniel Boone Homestead

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

5,000,000

(iv)  Drake Well

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

3,000,000

(v)  Erie Maritime Museum

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

2,000,000

(vi)  Graeme Park

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

3,500,000

(B)  Exhibit upgrades

 

Project Allocation

1,000,000

(vii)  Railroad Museum of Pennsylvania

 

(A)  Building, site and infrastructure improvements

 

Project Allocation

13,000,000

(10)  Department of Military and Veterans Affairs

 

(i)  Delaware Valley Veterans Home

 

(A)  Construct new adult day health care and 48-bed nursing care addition with additional parking area

 

Project Allocation

20,000,000

(B)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(ii)  Gino J. Merli Veterans Center

 

(A)  Construct new adult day health care addition with parking area, including demolition as required

 

Project Allocation

13,500,000

(B)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(iii)  Hollidaysburg Veterans Home

 

(A)  Construct new adult day health care addition with additional parking area

 

Project Allocation

8,040,000

(B)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(iv)  Pennsylvania Soldiers' & Sailors' Home, Erie

 

(A)  Construct new adult day health care addition with additional parking area

 

Project Allocation

10,720,000

(B)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(v)  Southeastern Veterans' Center, Spring City

 

(A)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(vi)  Southwestern Veterans' Center, Pittsburgh

 

(A)  Construct new adult day health care addition with additional parking area

 

Project Allocation

14,740,000

(B)  Rehabilitate Veterans' Home

 

Project Allocation

10,000,000

(vii)  Statewide Veterans' Homes

 

(A)  Provide safety measures and physical security upgrades, including new construction, renovations, electronic security systems and equipment, and site work

 

Project Allocation

30,000,000

(B)  Provide additional funding to rehabilitate PA Veterans' Homes, including to remedy life safety and regulatory deficiencies

 

Project Allocation

30,000,000

(viii)  Allentown Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(ix)  Beaver Falls Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(x)  Berks County Readiness Centers

 

(A)  Renovate DMVA facilities in Berks County, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

20,000,000

(xi)  Cambridge Springs Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

12,500,000

(xii)  Cumberland County Readiness Centers

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades for all DMVA facilities in Cumberland County

 

Project Allocation

27,500,000

(xiii)  Chambersburg Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xiv)  Coatesville Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xv)  Easton Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xvi)  Everett Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xvii)  Fort Indiantown Gap DMVA facilities and infrastructure

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

37,500,000

(xviii)  Greensburg Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xviii.1)  Hiller Army Reserve Center, Fayette County

 

(A)  Rehabilitate various buildings, including an unheated storage facility and parking

 

Project Allocation

2,500,000

(xix)  Huntingdon Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xx)  Lebanon Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

12,500,000

(xxi)  Lewisburg Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

12,500,000

(xxii)  Lewistown Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

12,500,000

(xxiii)  Luzerne County Readiness Centers

 

(A)  Renovate DMVA facilities in Luzerne County, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades

 

Project Allocation

25,000,000

(xxiv)  Philadelphia/Delaware Counties Readiness Center

 

(A)  Renovate the facility, including demolition, new construction, correcting structure and infrastructure deficiencies, and security system upgrades for Readiness Center

 

Project Allocation

20,000,000

(xxv)  Punxsutawney Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

7,500,000

(xxvi)  South Mountain Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

7,500,000

(xxvii)  Tamaqua Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

15,000,000

(xxviii)  Wellsboro Readiness Center

 

(A)  Renovate the Readiness Center, including demolition, new construction, correcting structure and infrastructure deficiencies and security system upgrades

 

Project Allocation

10,000,000

(xxix)  New Readiness Center

 

(A)  Land and/or building acquisition for new readiness center to relocate existing center in Dauphin and/or Lebanon counties

 

Project Allocation

20,000,000

(B)  Acquisition of land and or facilities to build or renovate buildings for a new readiness center in southeastern Pennsylvania

 

Project Allocation

33,000,000

(xxx)  Horsham Air Guard Station

 

(A)  Acquisition, construction and other related costs for a capital improvement project

 

Project Allocation

15,000,000

(11)  Office of Administration

 

(i)  Commonwealth Technology Center (Reserved)

 

(12)  Pennsylvania State Police

 

(i)  Statewide

 

(A)  Capital renewal of existing facilities, including site and building envelop improvements, interior renovations, building system upgrades and code-required improvements

 

Project Allocation

25,000,000

(B)  Land acquisition or purchase of existing facility to replace existing troop headquarter buildings or provide new facilities

 

Project Allocation

29,000,000

(ii)  Regional Forensic Laboratory

 

(A)  Renovate and construct new laboratory in central Pennsylvania, including site and infrastructure improvements

 

Project Allocation

30,000,000

(iii)  Pennsylvania State Police Academy and BESO Complex

 

(A)  Additional funding for construction and other related costs for the Pennsylvania State Police Academy and BESO Complex in Derry Township, Dauphin County

 

Project Allocation

8,000,000

(iv)  Erie Headquarters

 

(A)  Additional funding for construction and other related costs for new headquarters in Erie County

 

Project Allocation

5,500,000

(v)  DNA Laboratory

 

(A)  Additional funding for design and construction of a new DNA laboratory in the City of Greensburg, Westmoreland County

 

Project Allocation

5,500,000

(13)  State System of Higher Education

 

(i)  Bloomsburg University

 

(A)  Acquisition or construction of student housing

 

Project Allocation

98,000,000

(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

25,000,000

(C)  Additional funding for Waller Administration Building renovations

 

Project Allocation

11,000,000

(ii)  California University

 

(A)  Acquisition or construction of student housing, additional funds

 

Project Allocation

33,000,000

(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(C)  Renovations and rehabilitation of athletic facilities

 

Project Allocation

2,000,000

(iii)  Cheyney University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(iv)  Clarion University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(v)  East Stroudsburg University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(vi)  Edinboro University

 

(A)  Hamilton Hall renovation

 

Project Allocation

25,000,000

(B)  Demolition of underutilized and obsolete buildings

 

Project Allocation

15,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(D)  Renovation and rehabilitation of athletic facilities

 

Project Allocation

2,000,000

(vii)  Indiana University

 

(A)  Upgrade of campus utilities infrastructure

 

Project Allocation

40,000,000

(B)  Demolition of underutilized and obsolete buildings, additional funds

 

Project Allocation

15,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

35,000,000

(viii)  Kutztown University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(B)  Beeky Education Building renovation

 

Project Allocation

19,000,000

(ix)  Lock Haven University

 

(A)  Acquisition or construction of student housing, additional funds

 

Project Allocation

20,000,000

(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(x)  Mansfield University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(B)  Renovation, replacement or upgrade of campus utilities infrastructure, additional funds

 

Project Allocation

5,000,000

(xi)  Millersville University

 

(A)  Renovation, replacement or upgrade of campus utilities infrastructure, additional funds

 

Project Allocation

21,000,000

(B)  Stadium renovation

 

Project Allocation

15,000,000

(xii)  Shippensburg University

 

(A)  Heiges Field House renovation and addition

 

Project Allocation

40,000,000

(B)  Old Main renovation

 

Project Allocation

15,000,000

(C)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

20,000,000

(xiii)  Slippery Rock University

 

(A)  Additional funds for McKay Building renovation/addition

 

Project Allocation

15,000,000

(B)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

29,000,000

(xiv)  West Chester University

 

(A)  Provide for deferred maintenance needs and capital renewal repairs, additional funds

 

Project Allocation

32,000,000

(14)  Department of Transportation

 

(i)  Adams County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(ii)  Allegheny County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 11-0

 

Project Allocation

10,000,000

(B)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the western training facility

 

Project Allocation

5,000,000

(C)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(D)  Provide for the construction or renovation of maintenance facility at Fort Pitt Tunnel, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(E)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 11

 

Project Allocation

5,000,000

(F)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 12

 

Project Allocation

5,000,000

(G)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(iii)  Armstrong County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(iv)  Beaver County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(v)  Bedford County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(vi)  Berks County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(vii)  Blair County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 9-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(viii)  Bradford County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(ix)  Bucks County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site P

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(x)  Butler County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xi)  Cambria County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xii)  Cameron County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xiii)  Carbon County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xiv)  Centre County

 

(A)  Provide for the construction or renovation of Bellefonte Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Provide for the construction or renovation of Phillipsburg Maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 29

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 30

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xv)  Chester County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xvi)  Clarion County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xvii)  Clearfield County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 2-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xviii)  Clinton County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 33

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 34

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xix)  Columbia County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 37

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 38

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xx)  Crawford County

 

(A)  Provide for the construction or renovation of Centerville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Provide for the construction or renovation of Meadville maintenance  facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 19

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 20

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxi)  Cumberland County

 

(A)  Provide for the construction or renovation of Carlisle maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Provide for the construction or renovation of Lemoyne maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 45

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 46

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxii)  Dauphin County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 8-0

 

Project Allocation

10,000,000

(B)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the material testing lab

 

Project Allocation

8,000,000

(C)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the fleet management facility

 

Project Allocation

5,000,000

(D)  Construction or renovation of sign shop facility. May include site acquisition and development, design and construction of buildings and utility work

 

Project Allocation

5,000,000

(E)  Provide for the construction or renovation of Harrisburg maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(F)  Provide for the construction or renovation of Elizabethville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(G)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 47

 

Project Allocation

5,000,000

(H)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 48

 

Project Allocation

5,000,000

(I)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxiii)  Delaware County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site N

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxiv)  Elk County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxv)  Erie County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site L

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site M

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxvi)  Fayette County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 12-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxvii)  Forrest County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxviii)  Franklin County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site G

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxix)  Fulton County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site B

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 3

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxx)  Greene County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site D

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxi)  Huntingdon County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxii)  Indiana County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 10-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxiii)  Jefferson County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 25

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 26

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxiv)  Juniata County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxv)  Lackawanna County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 4-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 55

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxvi)  Lancaster County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxvii)  Lawrence County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 15

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 16

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxviii)  Lebanon County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at the eastern training facility

 

Project Allocation

5,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xxxix)  Lehigh County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 5-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xl)  Luzerne County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 39

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 53

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 54

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xli)  Lycoming County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 3-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlii)  McKean County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xliii)  Mercer County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site E

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 17

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 18

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xliv)  Mifflin County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlv)  Monroe County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site F

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 41

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlvi)  Montgomery County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 6-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlvii)  Montour County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 35

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 36

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlviii)  Northampton County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(xlix)  Northumberland County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(l)  Perry County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(li)  Philadelphia County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lii)  Pike County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site K

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot, and sewage plant upgrades, at roadside rest area - Site 61

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 62

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(liii)  Potter County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(liv)  Schuylkill County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lv)  Snyder County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lvi)  Somerset County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lvii)  Sullivan County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lviii)  Susquehanna County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site H

 

Project Allocation

5,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 56

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition, or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lix)  Tioga County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site T

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lx)  Union County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxi)  Venango County

 

(A)  Renovation and expansion for code compliance, upgraded building systems, improved program requirements and energy efficiency at District Office 1-0

 

Project Allocation

10,000,000

(B)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 21

 

Project Allocation

5,000,000

(D)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at roadside rest area - Site 22

 

Project Allocation

5,000,000

(E)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxii)  Warren County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxiii)  Washington County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Provide for the construction or renovation of West Brownsville maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(C)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site A

 

Project Allocation

5,000,000

(D)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxiv)  Wayne County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxv)  Westmoreland County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxvi)  Wyoming County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

(lxvii)  York County

 

(A)  Provide for the construction or renovation of maintenance facility, including site acquisition and development, design and construction of buildings, systems and utility work

 

Project Allocation

7,000,000

(B)  Renovation, expansion or replacement, including land acquisition, roof replacement, building systems, sidewalks, curbing, steps, parking lot and sewage plant upgrades, at welcome center - Site J

 

Project Allocation

5,000,000

(C)  Construction of a new stockpile facility with land acquisition or renovation of an existing facility to meet code and program requirements

 

Project Allocation

5,000,000

Section 4.  Itemization of furniture and equipment projects.

Additional capital projects in the category of public improvement projects consisting of the acquisition of movable furniture and equipment to complete public improvement projects and to be purchased by the Department of General Services, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial cost, as follows:

 

Project

Total Project

Allocation

(1)  Department of Agriculture

 

(i)  Diagnostic Laboratory

 

(A)  Provide original furniture and equipment for diagnostic laboratory

 

Project Allocation

6,000,000

(1.1)  Department of Education

 

(i)  Lincoln University

 

(A)  Provide original furniture and equipment for Houston Hall

 

Project Allocation

3,000,000

(ii)  The Pennsylvania State University

 

(A)  Davey Laboratory renovation (University Park campus) original furniture, fixtures and equipment for Davey Laboratory at the University Park campus

 

Project Allocation

15,000,000

(B)  Osmond Laboratory renovation - Phase II (University Park campus) original furniture, fixtures and equipment for Phase II of Osmond Laboratory at the University Park campus

 

Project Allocation

6,000,000

(C)  Carpenter Building renovation (University Park campus) original furniture, fixtures and equipment for the Carpenter Building at the University Park campus

 

Project Allocation

6,000,000

(D)  Student Support and Services Center (University Park campus) original furniture, fixtures and equipment for the Student Support and Services Center at the University Park campus

 

Project Allocation

12,000,000

(E)  Electrical Engineering West renovation (University Park campus) original furniture, fixtures and equipment for Electrical Engineering West at the University Park campus

 

Project Allocation

8,000,000

(F)  Electrical Engineering East renovation (University Park campus) original furniture, fixtures and equipment for Electrical Engineering East at the University Park campus

 

Project Allocation

6,000,000

(G)  Pattee Library/Paterno Library renovation (University Park campus) Pattee Library/Paterno Library renovation at University Park campus

 

Project Allocation

6,000,000

(H)  Sparks Building renovation (University Park campus) original furniture, fixtures and equipment for the Sparks Building at the University Park campus

 

Project Allocation

13,000,000

(I)  Applied Research Laboratory renovation (University Park campus) original furniture, fixtures and equipment for the Applied Research Laboratory at the University Park campus

 

Project Allocation

7,000,000

(J)  Chilled water plant (University Park campus) original furniture, fixtures and equipment for a chilled water plant at the University Park campus

 

Project Allocation

4,000,000

(K)  Advanced water treatment system (University Park campus) original furniture, fixtures and equipment for an advanced water treatment system at the University Park campus

 

Project Allocation

3,000,000

(L)  Classroom-library building renovation (and nursing addition) (Scranton campus) original furniture, fixtures and equipment for the classroom-library building renovation (and nursing addition) at the Scranton campus

 

Project Allocation

3,000,000

(M)  Kelly Library renovation (and addition) (Greater Allegheny campus) original furniture, fixtures and equipment for Kelly Library renovation (and addition) at the Greater Allegheny campus

 

Project Allocation

3,000,000

(N)  Classroom/class lab teaching and learning building (Harrisburg campus) original furniture, fixtures and equipment for a classroom/class lab teaching and learning building at the Harrisburg campus

 

Project Allocation

5,000,000

(O)  Teaching and administrative support building (Hershey campus) original furniture, fixtures and equipment for a teaching and administrative support building at the Hershey campus

 

Project Allocation

12,000,000

(P)  Academic and research building (Hershey campus) original furniture, fixtures and equipment for an academic and research building at the Hershey campus

 

Project Allocation

10,000,000

(Q)  Chambers Building - North Wing Renovation (University Park campus) original furniture, fixtures and equipment for the North Wing of Chambers Building at the University Park campus

 

Project Allocation

12,000,000

(iii)  Thaddeus Stevens College of Technology

 

(A)  Original furniture, fixtures and equipment for dormitory buildings

 

Project Allocation

125,000

(B)  Original furniture, fixtures and equipment for Transportation Center

 

Project Allocation

3,500,000

(1.2)  Department of Environmental Protection

 

(i)  Bureau of Laboratories

 

(A)  Provide original furniture and equipment for Bureau of Laboratories laboratory

 

Project Allocation

18,000,000

(2)  Department of General Services

 

(i)  Department of General Services

 

(A)  Provide original furniture and equipment for the Finance Building

 

Project Allocation

25,000,000

(B)  Provide original furniture and equipment for the Scranton State Office Building

 

Project Allocation

3,500,000

(C)  Provide original furniture and equipment for the Reading Office Building

 

Project Allocation

3,500,000

(2.1)  Department of Health

 

(i)  Bureau of Laboratories

 

(A)  Provide original furniture and equipment for Bureau of Laboratories laboratory

 

Project Allocation

7,000,000

(3)  Pennsylvania Historical and Museum Commission

 

(i)  Pennsylvania State Archive Building

 

(A)  Provide original furniture and equipment for facility

 

Project Allocation

3,000,000

(3.1)  Department of Human Services

 

(i)  Norristown State Hospital

 

(A)  Provide original furniture and equipment for the facility

 

Project Allocation

13,000,000

(4)  Department of Military and Veterans Affairs

 

(i)  Delaware Valley Veterans Home

 

(A)  Provide original furniture and equipment for new nursing care addition and new adult day health care program

 

Project Allocation

3,814,190

(ii)  Gino J. Merli Veterans Center

 

(A)  Provide original furniture and equipment for new adult day health care program

 

Project Allocation

500,000

(iii)  Hollidaysburg Veterans Home

 

(A)  Provide original furniture and equipment for new adult day health care program

 

Project Allocation

500,000

(iv)  Pennsylvania Soldiers' & Sailors' Home, Erie

 

(A)  Provide original furniture and equipment for new adult day health care program

 

Project Allocation

500,000

(v)  Southwestern Veterans' Center, Pittsburgh

 

(A)  Provide original furniture and equipment for new adult day health care program

 

Project Allocation

500,000

(vi)  Allentown Readiness Center

 

(A)  Provide original furniture and equipment for Allentown Readiness Center

 

Project Allocation

1,000,000

(vii)  Beaver Falls Readiness Center

 

(A)  Provide original furniture and equipment for Beaver Falls Readiness Center

 

Project Allocation

1,000,000

(viii)  Berks County Readiness Centers

 

(A)  Provide original furniture and equipment for Berks County Readiness Centers

 

Project Allocation

2,000,000

(ix)  Cambridge Springs Readiness Center

 

(A)  Provide original furniture and equipment for Cambridge Springs Readiness Center

 

Project Allocation

1,000,000

(x)  Carlisle Readiness Center

 

(A)  Provide original furniture and equipment for Carlisle Readiness Center

 

Project Allocation

1,000,000

(xi)  Chambersburg Readiness Center

 

(A)  Provide original furniture and equipment for Chambersburg Readiness Center

 

Project Allocation

1,000,000

(xii)  Coatesville Readiness Center

 

(A)  Provide original furniture and equipment for Coatesville Readiness Center

 

Project Allocation

1,000,000

(xiii)  Easton Readiness Center

 

(A)  Provide original furniture and equipment for Easton Readiness Center

 

Project Allocation

1,000,000

(xiv)  Everett Readiness Center

 

(A)  Provide original furniture and equipment for Everett Readiness Center

 

Project Allocation

1,000,000

(xv)  Fort Indiantown Gap DMVA facilities

 

(A)  Provide original furniture and equipment for Fort Indiantown Gap DMVA facilities

 

Project Allocation

10,000,000

(xvi)  Greensburg Readiness Center

 

(A)  Provide original furniture and equipment for Greensburg Readiness Center

 

Project Allocation

1,000,000

(xvii)  Huntingdon Readiness Center

 

(A)  Provide original furniture and equipment for Huntingdon Readiness Center

 

Project Allocation

1,000,000

(xviii)  Lebanon Readiness Center

 

(A)  Provide original furniture and equipment for Lebanon Readiness Center

 

Project Allocation

1,000,000

(xix)  Lewisburg Readiness Center

 

(A)  Provide original furniture and equipment for Lewisburg Readiness Center

 

Project Allocation

1,000,000

(xx)  Lewistown Readiness Center

 

(A)  Provide original furniture and equipment for Lewistown Readiness Center

 

Project Allocation

1,000,000

(xxi)  Luzerne County Readiness Centers

 

(A)  Provide original furniture and equipment for Luzerne Readiness Centers

 

Project Allocation

5,000,000

(xxii)  Philadelphia/Delaware Counties

 

(A)  Provide original furniture and equipment for Philadelphia/Delaware County Readiness Centers

 

Project Allocation

4,000,000

(xxiii)  Punxsutawney Readiness Center

 

(A)  Provide original furniture and equipment for Punxsutawney Readiness Center

 

Project Allocation

500,000

(xxiv)  South Mountain Readiness Center

 

(A)  Provide original furniture and equipment for South Mountain Readiness Center

 

Project Allocation

500,000

(xxv)  Tamaqua Readiness Center

 

(A)  Provide original furniture and equipment for Tamaqua Readiness Center

 

Project Allocation

1,000,000

(xxvi)  Wellsboro Readiness Center

 

(A)  Provide original furniture and equipment for Wellsboro Readiness Center

 

Project Allocation

1,000,000

(4.1)  Pennsylvania State Police

 

(i)  Regional Forensic Laboratory

 

(A)  Provide original furniture and equipment for Regional Forensic Laboratory

 

Project Allocation

7,000,000

(5)  State System of Higher Education

 

(i)  Edinboro University

 

(A)  Provide original furniture and equipment for Hamilton Hall renovation

 

Project Allocation

2,500,000

(ii)  Shippensburg University

 

(A)  Provide original furniture and equipment for Heiges Field House renovation and addition

 

Project Allocation

4,000,000

(B)  Provide original furniture and equipment for Old Main renovation

 

Project Allocation

1,500,000

(6)  (Reserved)

 

(7)  Department of Transportation

 

(i)  Adams County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(ii)  Allegheny County

 

(A)  Provide original furniture and equipment for District Office 11-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(iii)  Armstrong County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(iv)  Beaver County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(v)  Bedford County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(vi)  Berks County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(vii)  Blair County

 

(A)  Provide original furniture and equipment for District Office 9-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(viii)  Bradford County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(ix)  Bucks County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(x)  Butler County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xi)  Cambria County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xii)  Cameron County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xiii)  Carbon County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xiv)  Centre County

 

(A)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(xv)  Chester County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xvi)  Clarion County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xvii)  Clearfield County

 

(A)  Provide original furniture and equipment for District Office 2-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xviii)  Clinton County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xix)  Columbia County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xx)  Crawford County

 

(A)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(xxi)  Cumberland County

 

(A)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(xxii)  Dauphin County

 

(A)  Provide original furniture and equipment for District Office 8-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(xxiii)  Delaware County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxiv)  Elk County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxv)  Erie County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxvi)  Fayette County

 

(A)  Provide original furniture and equipment for District Office 12-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxvii)  Forrest County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxviii)  Franklin County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxix)  Fulton County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxx)  Greene County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxi)  Huntingdon County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxii)  Indiana County

 

(A)  Provide original furniture and equipment for District Office 10-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxiii)  Jefferson County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxiv)  Juniata County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxv)  Lackawanna County

 

(A)  Provide original furniture and equipment for District Office 4-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxvi)  Lancaster County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxvii)  Lawrence County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxviii)  Lebanon County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xxxix)  Lehigh County

 

(A)  Provide original furniture and equipment for District Office 5-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xl)  Luzerne County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xli)  Lycoming County

 

(A)  Provide original furniture and equipment for District Office 3-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlii)  McKean County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xliii)  Mercer County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xliv)  Mifflin County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlv)  Monroe County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlvi)  Montgomery County

 

(A)  Provide original furniture and equipment for District Office 6-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlvii)  Montour County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlviii)  Northampton County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(xlix)  Northumberland County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(l)  Perry County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(li)  Philadelphia County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lii)  Pike County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(liii)  Potter County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(liv)  Schuylkill County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lv)  Snyder County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lvi)  Somerset County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lvii)  Sullivan County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lviii)  Susquehanna County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lix)  Tioga County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lx)  Union County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxi)  Venango County

 

(A)  Provide original furniture and equipment for District Office 1-0

 

Project Allocation

2,000,000

(B)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxii)  Warren County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxiii)  Washington County

 

(A)  Provide original furniture and equipment for maintenance facilities

 

Project Allocation

1,200,000

(lxiv)  Wayne County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxv)  Westmoreland County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxvi)  Wyoming County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

(lxvii)  York County

 

(A)  Provide original furniture and equipment for maintenance facility

 

Project Allocation

600,000

Section 5.  Itemization of transportation assistance projects.

(a)  Mass transit.--Additional capital projects in the category of transportation assistance projects for mass transit in which an interest is to be acquired or constructed by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their estimated financial costs, as follows:

 

Project

Total Project

Allocation

(1)  York County

 

(i)  York County Economic Alliance

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, rehabilitation and other related costs for public transit modernization in York County

 

Project Allocation

8,000,000

(b)  Rural and intercity rail.--Additional capital projects in the category of transportation assistance projects for rural and intercity rail service projects to be constructed or with respect to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project

Allocation

(1)  Allegheny County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(2)  Beaver County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(ii)  Center Township

 

(A)  Construction, excavation, infrastructure and other related costs for a new rail siding at the site of the former J&L Steel Plant

 

Project Allocation

4,500,000

(2.1)  Berks County

 

(i)  County projects

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a second rail line

 

Project Allocation

5,000,000

(B)  Rehabilitation, construction and renovation of rail infrastructure to service Evergreen Community Power site, including track construction and rebuild, property and right-of-way acquisition, design, engineering, permitting, rails, ties, ballast, crossings, switches, turnouts, repair of grade crossings, track and other repairs and rebuilds, construction of rail service and any other related costs

 

Project Allocation

5,000,000

(2.2)  Carbon County

 

(i)  Nesquehoning Borough

 

(A)  Acquisition, redevelopment and other related costs for the renovation of current buildings and grounds and for repair and maintenance of open top and covered hoppers to support anthracite coal shipping domestically and internationally

 

Project Allocation

1,000,000

(2.3)  Chester County

 

(i)  Phoenixville Borough

 

(A)  Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation, construction and other costs related to the widening and expansion of the Black Rock Train Tunnel and the construction and installation of a second track

 

Project Allocation

10,000,000

(3)  Clearfield County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure and other related costs for rehabilitation of the rail line known as the Clearfield Cluster located in Cambria, Centre, Clearfield, Clinton and Indiana Counties, including railbed, ties, rail and other materials to support business growth and improve safety

 

Project Allocation

15,000,000

(3.1)  Cumberland and Adams Counties

 

(i)  Gettysburg & Northern Railroad

 

(A)  Rehabilitate rail infrastructure, construct new sidings and install transload equipment to support customer development

 

Project Allocation

3,500,000

(B)  Improve, replace and construct rail infrastructure to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, crossings, bridges and related equipment

 

Project Allocation

4,000,000

(4)  Dauphin County

 

(i)  Steelton and Highspire Railroad

 

(A)  Rehabilitation of rail infrastructure, including engineering, site preparation, drainage, grading, ties, rail, ballast, switches, crossings, bridge and paving

 

Project Allocation

7,500,000

(4.1)  Fayette County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(4.2)  Franklin County

 

(i)  Meyers Grain LLC

 

(A)  Construct rail infrastructure and install necessary transload equipment to support the development of a grain and fertilizer transload facility in Franklin County, including engineering, site preparation, rail, turnouts, ties, ballast, other track related materials, scales, rail car mover, car unloading equipment, unloading pits, conveyor and elevator systems and other required materials for project completion

 

Project Allocation

5,000,000

(ii)  Franklin Storage LP

 

(A)  Rehabilitate, construct rail infrastructure and install necessary transload equipment to support existing operations in the county, including site preparation, engineering, rail, turnouts, ties, ballast, other track-related materials, overhead crane, car mover, fall protection, unloading ramps, paving, lighting and other required materials for project completion

 

Project Allocation

5,000,000

(4.3)  Greene County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(ii)  Monongahela Township

 

(A)  Construction and extension of an existing rail line in Monongahela Township, including an off-load facility to transport coal and other items on a currently idle coal site

 

Project Allocation

10,000,000

(4.4)  Indiana County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(5)  Lackawanna County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery, equipment and other related costs for new, expansions and improvements to transportation, rail airport and multimodal infrastructure

 

Project Allocation

15,000,000

(6)  Lancaster County

 

(i)  Lancaster County Redevelopment Authority

 

(A)  Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of facilities to support growth in production volumes and jobs for Arconic, Inc.

 

Project Allocation

3,500,000

(6.1)  Lawrence County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(ii)  LVR Railroad LLC

 

(A)  Rehabilitate, construct, extend rail infrastructure and install necessary transload equipment to support existing operations, as well as the addition of a new food ingredient transfer customer in Lancaster County, including engineering, site preparation, rail, turnouts, ties, ballast, other track related materials, crossings, scales, utility upgrades, paving, required security/lighting for handling of food grade products, commodity storage, conveyor systems and other required materials for project completion

 

Project Allocation

10,000,000

(7)  Luzerne County

 

(i)  Newport Township

 

(A)  Acquisition, construction and infrastructure for a rail extension for the Newport Township Energy Park

 

Project Allocation

5,000,000

(7.1)  Montgomery County

 

(i)  County projects

 

(A)  Construct rail infrastructure to accommodate current traffic volume, as well as future planned expansions, including, but not limited to, property acquisition, rail car scale acquisition and installation, site preparation, engineering, permitting, drainage improvements, rail, ties, ballast, turnouts, switches, surfacing and all rail-related materials necessary for project

 

Project Allocation

10,000,000

(8)  Somerset County

 

(i)  County projects

 

(A)  Construction and rehabilitation of rail at the Cambria Branch Rail Line

 

Project Allocation

7,000,000

(8.1)  Union County

 

(i)  County projects

 

(A)  Construction of a standard ballasted track for a main loop and bypass track, including all track materials, turnouts, grade crossing and receiving equipment, including hoppers, bins, conveyors, outlets, elevators and other related costs to support a feed mill in White Deer Township

 

Project Allocation

3,000,000

(8.2)  Washington County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(8.3)  Westmoreland County

 

(i)  County projects

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for the upgrade, expansion and extension of rail services to support a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(9)  Multiple Counties

 

(i)  Redevelopment Authority of County of Berks

 

(A)  Acquisition, construction, infrastructure, rehabilitation and other related costs for the Colebrookdale Railroad Preservation Trust/Eastern Berks Gateway Railroad

 

Project Allocation

30,000,000

(i.1)  Berks and Montgomery Counties

 

(A)  Rehabilitation of railroad, including track improvements, siding extensions, visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties

 

Project Allocation

10,000,000

(ii)  Bradford and Wyoming Counties

 

(A)  Acquisition, construction, infrastructure and other related costs for rehabilitation of rail line, including railbed, ties, rail and other materials to support business growth and improve safety

 

Project Allocation

5,000,000

(ii.1)  Chester, Delaware, Montgomery and Philadelphia Counties

 

(A)  Construction of infrastructure to support track, station, ancillary features and safety improvements for operation of West Chester Railroad tourist trains, restoration of common carrier passenger rail service to West Chester, West Chester University, Westtown, Cheyney University and Center City via SEPTA connection, restoration of freight rail access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative battery technology

 

Project Allocation

3,963,000

(ii.2)  Lackawanna, Luzerne, Monroe, Northampton and Wayne Counties

 

(A)  Rehabilitate, replace and construct rail infrastructure for a passenger rail project, including land acquisition, engineering, site preparation, construction, drainage, grading, ties, rail, ballast, switches, track materials, crossings, bridges, paving and other costs related to the project

 

Project Allocation

15,000,000

(iii)  Reading Blue Mountain and Northern Railroad

 

(A)  Reconstruction by process of crop and weld of 28 miles of heavy control-cooled 136-pound main line rail from Pittston (MP 3.59) to Mehoopany (MP 31.74)

 

Project Allocation

3,300,000

(iv)  Gettysburg and Northern Railroad

 

(A)  Improve, replace and construct rail infrastructure in Adams and Cumberland Counties to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, crossings, bridges and related equipment

 

Project Allocation

4,000,000

(B)  Rehabilitate rail infrastructure, construct new sidings and install transload equipment to support customer development in Adams and Cumberland Counties

 

Project Allocation

3,500,000

(v)  Delaware-Lackawanna Railroad

 

(A)  Construction, renovation, rehabilitation and other costs related to the Delaware-Lackawanna Railroad rail infrastructure in the counties to handle existing and prospective customer shipping needs, including land acquisition, engineering, site preparation, rail, ties, ballast, turnouts, other track materials, drainage, surfacing, grade crossings, bridges, tunnels and related equipment in Lackawanna, Luzerne, Monroe, Northampton and Wayne Counties

 

Project Allocation

7,500,000

(B)  Construction, infrastructure and other costs related to the Delaware-Lackawanna Railroad upgrade of rail infrastructure, construction of new sidings and installation of transload equipment to support customer development in the counties

 

Project Allocation

3,750,000

(vi)  North Shore Railroad

 

(A)  Land acquisition, engineering, permitting, site preparation, clearing, grading, drainage, rail, ballast, switches, signals, crossings, bridges and all materials necessary for rehabilitation of existing track and construction of new track in Centre, Clinton, Columbia, Lycoming, Mifflin, Montour, Northumberland and Union Counties in areas operated by North Shore Railroad Company

 

Project Allocation

6,000,000

(c)  Air transportation.--Additional capital projects in the category of transportation assistance projects for air transportation service to which an interest is to be acquired by the Department of Transportation, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated financial costs, as follows:

 

Project

Total Project

Allocation

(1)  Blair County

 

(i)  Blair County Airport Authority

 

(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs for economic development of business and aviation facilities and infrastructure at the Altoona-Blair County Airport

 

Project Allocation

5,000,000

(2)  Cumberland County

 

(i)  South Middleton Township

 

(A)  Acquisition, renovation, construction, infrastructure and other related costs for improvement, expansion, redevelopment and revitalization of the Carlisle Airport

 

Project Allocation

20,000,000

(3)  Dauphin County

 

(i)  Susquehanna Area Regional Airport Authority

 

(A)  Construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for the long-term parking lot at Harrisburg International Airport

 

Project Allocation

3,000,000

(3.1)  Indiana County

 

(i)  White Township

 

(A)  Acquisition, rehabilitation, infrastructure, construction and related development costs for improvements at the Indiana County - Jimmy Stewart Airport

 

Project Allocation

7,000,000

(4)  Lancaster County

 

(i)  Lancaster Airport Authority

 

(A)  Acquisition of aviation fueling vehicles

 

Project Allocation

125,000

(B)  Acquisition, construction, rehabilitation and other related costs for airport maintenance and construction equipment and a storage facility

 

Project Allocation

500,000

(C)  Construction, infrastructure, abatement of hazardous materials and other related costs for relocation of the Aircraft Fuel Farm

 

Project Allocation

2,000,000

(D)  Construction, infrastructure, rehabilitation and other related costs for airport infrastructure improvements, including parking, HVAC and other building services

 

Project Allocation

2,500,000

(E)  Construction, infrastructure, rehabilitation and other related costs for airport development and improvement, including hangars, aircraft and vehicle parking and associated facilities

 

Project Allocation

2,500,000

(F)  Construction, infrastructure, rehabilitation and other related costs for site development and construction of T-hangars and offices

 

Project Allocation

3,500,000

(G)  Construction, infrastructure, rehabilitation and other related costs for site development and construction of corporate hangars and offices

 

Project Allocation

20,000,000

(5)  Lawrence County

 

(i)  Lawrence County Economic Development Corporation

 

(A)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for capacity expansion at the New Castle Municipal Airport in Union Township

 

Project Allocation

10,000,000

(6)  Luzerne County

 

(i)  Wilkes-Barre Wyoming Valley Airport

 

(A)  Construction, infrastructure and other related costs for improvements at the Wyoming Valley Airport

 

Project Allocation

5,000,000

(7)  Mercer County

 

(i)  Borough of Grove City

 

(A)  Acquisition, construction, infrastructure and other related costs for aviation, industrial and commercial site development and improvements at or surrounding the Grove City Regional Airport

 

Project Allocation

1,000,000

Section 6.  Itemization of redevelopment assistance projects.

Additional capital projects in the category of redevelopment assistance projects for capital grants by the Department of Community and Economic Development, its successors or assigns, authorized under the provisions of the act of May 20, 1949 (P.L.1633, No.493), known as the Housing and Redevelopment Assistance Law, and redevelopment assistance capital projects, and to be financed by the incurring of debt, are hereby itemized, together with their estimated financial costs, as follows:

 

Project

Total Project

Allocation

(1)  Adams County

 

(i)  County projects

 

(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other associated costs for the development of WellSpan Health health care facilities

 

Project Allocation

5,000,000

(ii)  Adams County Industrial Development Authority

 

(A)  Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction

 

Project Allocation

10,000,000

(B)  Acquisition, site preparation, remediation, renovation, construction, redevelopment, infrastructure and other associated costs for a community and economic development project

 

Project Allocation

5,000,000

(C)  Site preparation, acquisition, infrastructure, rehabilitation, renovation, construction and other related costs for the construction, expansion and adaptive reuse of Bermudian Springs buildings in Huntingdon Township

 

Project Allocation

2,000,000

(D)  Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the redevelopment of the Berlin Junction Manufacturing Center site in Oxford Township

 

Project Allocation

5,000,000

(E)  Site preparation, remediation, acquisition, renovation, construction, redevelopment, infrastructure and other associated costs for the redevelopment of former foundry site

 

Project Allocation

3,500,000

(iii)  Butler Township

 

(A)  Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs associated with the construction of a municipal and emergency services facility

 

Project Allocation

2,500,000

(iv)  Reading Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, flood mitigation, renovation and other related costs for the complete replacement of an existing spillway at Lake Meade Dam with a three-stage labyrinth spillway, including the installment of a system to control the release capacity of the spillway to accommodate Department of Environmental Protection requirements

 

Project Allocation

5,000,000

(2)  Allegheny County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project

 

Project Allocation

30,000,000

(B)  Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the field of automation, transportation and technology

 

Project Allocation

600,000

(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

30,000,000

(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

30,000,000

(E)  Acquisition, construction, redevelopment, rehabilitation, infrastructure and other costs related to an elementary school building project in the Steel Valley School District

 

Project Allocation

2,000,000

(F)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for SteelBridge Land Management, LLC, and its affiliates

 

Project Allocation

25,000,000

(G)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities

 

Project Allocation

35,000,000

(i.1)  City of Pittsburgh Urban Redevelopment Authority

 

(A)  Construction, renovation, infrastructure and other costs related to HVAC, boilers, lighting improvements and other building system upgrades at the Squirrel Hill facility of the JCC of Greater Pittsburgh

 

Project Allocation

750,000

(B)  Construction, infrastructure and other costs related to a new medical center and office building complex for Primary Care Health Services in Homewood

 

Project Allocation

7,500,000

(ii)  Moon Transportation Authority

 

(A)  Construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for development projects along Stevenson Mill and Rouser Road Connectors and adjacent areas in Moon Township

 

Project Allocation

5,000,000

(iii)  Allegheny County Airport Authority

 

(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for the development of industrial and commercial sites at or surrounding Pittsburgh International Airport

 

Project Allocation

50,000,000

(iv)  Pittsburgh Gateways Corporation

 

(A)  Construction, infrastructure, redevelopment, rehabilitation and other related costs for the Energy Innovation Center and related projects in accordance with Pittsburgh Gateway's mission

 

Project Allocation

6,000,000

(B)  Economic development projects in southwest Pennsylvania

 

Project Allocation

6,000,000

(iv.1)  Redevelopment Authority of Allegheny County

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in Oakmont Borough

 

Project Allocation

5,000,000

(B)  Construction, infrastructure, rehabilitation and other costs related to the construction of housing for individuals with intellectual and physical disabilities in Ross Township

 

Project Allocation

800,000

(C)  Demolition, environmental assessment, planning, remediation, rehabilitation, site preparation, infrastructure, construction and other related costs associated with the redevelopment of a former power generation facility

 

Project Allocation

10,000,000

(D)  Construction, infrastructure and other related costs associated with the development of a teaching and research facility at Chatham University's Eden Hall campus

 

Project Allocation

2,000,000

(iv.2)  Urban Redevelopment Authority of Pittsburgh

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for a redevelopment project on land owned or controlled by Bethel A.M.E. Church in the Hill District Neighborhood

 

Project Allocation

20,000,000

(v)  Pittsburgh

 

(A)  Acquisition, construction, infrastructure, redevelopment and other costs related to the UPMC Children's Hospital of Pittsburgh

 

Project Allocation

30,000,000

(vi)  City of Clairton

 

(A)  Construction, acquisition, infrastructure, renovation and other related costs leading to economic development projects in the city

 

Project Allocation

5,000,000

(vi.1)  City of McKeesport

 

(A)  Construction, rehabilitation, infrastructure, renovation and other related costs for the redevelopment of the Carnegie Library of McKeesport

 

Project Allocation

500,000

(vii)  City of Pittsburgh

 

(A)  Construction, infrastructure, renovation, rehabilitation and abatement of hazardous materials associated with the development of a manufacturing facility with associated parking structure

 

Project Allocation

10,000,000

(B)  Construction, acquisition, infrastructure, renovation and rehabilitation for a construction project that will expand the History Center

 

Project Allocation

5,000,000

(C)  Construction, infrastructure, renovation and rehabilitation of structures and public open space assessments

 

Project Allocation

5,000,000

(D)  Construction, acquisition, infrastructure improvements, abatement of hazardous materials, renovation and rehabilitation related to the development of Hazelwood Green in the Greater Hazelwood neighborhood

 

Project Allocation

50,000,000

(E)  Construction, infrastructure improvement, renovation, rehabilitation and other related costs to create apartment-style living arrangements for individuals with disabilities

 

Project Allocation

5,000,000

(F)  Acquisition, construction, infrastructure, redevelopment, and all other related costs for Carrick redevelopment projects

 

Project Allocation

20,000,000

(G)  Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of a former brownfield site in Squirrel Hill and Swisshelm Park neighborhoods

 

Project Allocation

20,000,000

(H)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Homewood redevelopment projects

 

Project Allocation

20,000,000

(I)  Acquisition, construction, infrastructure, redevelopment and other costs related to a mixed-use affordable housing development in the Homewood Business district

 

Project Allocation

20,000,000

(J)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Homewood Avenue

 

Project Allocation

25,000,000

(K)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Second Avenue

 

Project Allocation

25,000,000

(L)  Construction and acquisition relating to the redevelopment of the Forest Hills - Chalfant Westinghouse Site

 

Project Allocation

1,500,000

(M)  Renovation, rehabilitation and other costs related to Phase 2 of this project, including the renovation of the 23 units in the former three-story Highlander building

 

Project Allocation

1,300,000

(N)  Renovation, rehabilitation and other costs related to the remediation and site infrastructure improvements to the former Westinghouse Atomy Smasher facility and site

 

Project Allocation

10,000,000

(O)  Construction, acquisition, renovation, rehabilitation and other costs related to the redevelopment project of the Trade Institute of Pittsburgh to renovate a nearby property into short-term workforce housing

 

Project Allocation

500,000

(P)  Construction, renovation and rehabilitation of an updated and expanded facility for the Jubilee Soup Kitchen

 

Project Allocation

1,000,000

(Q)  Acquisition, construction, infrastructure, redevelopment and all other related costs for Garfield redevelopment projects

 

Project Allocation

20,000,000

(R)  Acquisition, construction, infrastructure, redevelopment and all other related costs for Fairywood Industrial Park redevelopment projects

 

Project Allocation

20,000,000

(S)  Acquisition, construction, infrastructure, redevelopment and other related costs for the redevelopment of the former J. Allen Steel site redevelopment projects

 

Project Allocation

60,000,000

(T)  Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Greater Hill District neighborhoods of Pittsburgh

 

Project Allocation

20,000,000

(U)  Acquisition, construction, infrastructure, redevelopment and other related costs for redevelopment projects in the Uptown neighborhood of Pittsburgh

 

Project Allocation

20,000,000

(V)  Acquisition, construction, infrastructure, redevelopment and other related costs for Beechview redevelopment projects

 

Project Allocation

20,000,000

(W)  Acquisition, construction, infrastructure, redevelopment and other related costs for Sheraden redevelopment projects

 

Project Allocation

20,000,000

(X)  Acquisition, construction, infrastructure, redevelopment and other related costs for Warrington Avenue redevelopment projects

 

Project Allocation

20,000,000

(Y)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Centre Avenue

 

Project Allocation

25,000,000

(Z)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Perrysville Avenue

 

Project Allocation

25,000,000

(AA)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - Chartiers Avenue

 

Project Allocation

25,000,000

(BB)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Avenues of Hope Program - East Warrington Avenue

 

Project Allocation

25,000,000

(CC)  Acquisition, construction, infrastructure and other related costs for the redevelopment of the Clack site in Lawrenceville

 

Project Allocation

20,000,000

(DD)  Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Manchester neighborhood

 

Project Allocation

20,000,000

(EE)  Acquisition, construction, infrastructure and other related costs for a scattered site mixed-use development in the Perry South neighborhood

 

Project Allocation

20,000,000

(FF)  Acquisition, construction, infrastructure, redevelopment and other related costs for Chartiers City redevelopment projects

 

Project Allocation

20,000,000

(GG)  Acquisition, construction, infrastructure, redevelopment and other related costs for Elliot redevelopment projects

 

Project Allocation

20,000,000

(HH)  Acquisition, construction, infrastructure and other related costs for public park expansion project

 

Project Allocation

20,000,000

(II)  Acquisition, construction, infrastructure and other related costs for Allegheny Riverfront redevelopment project

 

Project Allocation

20,000,000

(JJ)  Acquisition, construction, infrastructure, redevelopment and other costs related to the Avenues of Hope Program - Larimer Avenue

 

Project Allocation

25,000,000

(KK)  Acquisition, construction, infrastructure, redevelopment and other costs related to East Liberty redevelopment projects

 

Project Allocation

20,000,000

(LL)  Acquisition, construction, infrastructure, redevelopment and all other related costs for the redevelopment of strategic brownfield sites

 

Project Allocation

50,000,000

(MM)  Acquisition, construction, infrastructure, redevelopment and all other related costs for transit-oriented development projects

 

Project Allocation

50,000,000

(NN)  Acquisition, construction, infrastructure, redevelopment and all other related costs for developing closed schools and historic churches for housing, office or commercial uses

 

Project Allocation

50,000,000

(OO)  Acquisition, construction, infrastructure, redevelopment and all other related costs for Innovation and Entrepreneurship Center projects

 

Project Allocation

50,000,000

(PP)  Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh-based advanced technology and incubator development projects

 

Project Allocation

50,000,000

(QQ)  Acquisition, construction, infrastructure, redevelopment and all other related costs for Pittsburgh riverfront redevelopment projects

 

Project Allocation

50,000,000

(RR)  Acquisition, construction, infrastructure and other related costs for mixed-use development on Penn Avenue from Shady Avenue to Fifth Avenue in the Larimer and East Liberty sections of Pittsburgh

 

Project Allocation

250,000,000

(SS)  Construction, renovation, rehabilitation and other costs related to the next phase of the museum's growth on Pittsburgh's North Side, including redevelopment and maintenance to buildings and grounds

 

Project Allocation

5,000,000

(TT)  Acquisition, construction, infrastructure and other related costs for Pittsburgh riverfront redevelopment projects

 

Project Allocation

14,000,000

(UU)  Renovation, rehabilitation and other costs relating to the renovation of a commercial building to house Work Hard Pittsburgh's expanded coworking, media production, meeting and maker spaces

 

Project Allocation

1,000,000

(VV)  Construction, infrastructure, renovation, rehabilitation and other costs related to the rehabilitation and renovation of Saints Peter and Paul Church

 

Project Allocation

10,000,000

(WW)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, and other costs related to infrastructure improvements to libraries within the Allegheny County Library System

 

Project Allocation

10,000,000

(XX)  Acquisition, construction, infrastructure and other related costs for mixed-use development, including residential, retail, parking and offices within the Boulevard of the Allies, Halket, Zulema and McKee Place in Oakland

 

Project Allocation

200,000,000

(YY)  Construction, infrastructure, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment at and adjacent to 2400 East Carson Street in Pittsburgh's South Side

 

Project Allocation

2,500,000

(ZZ)  Construction and other costs related to the development of a multiphased, mixed-use knowledge community in the Pittsburgh Innovation District

 

Project Allocation

10,000,000

(AAA)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to redevelopment located at the former Wholey building in the Strip District

 

Project Allocation

20,000,000

(BBB)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure construction and remediation projects throughout the region

 

Project Allocation

50,000,000

(CCC)  Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Sky Car project

 

Project Allocation

15,000,000

(DDD)  Acquisition, construction, infrastructure, rehabilitation and other related costs for the Pittsburgh Downtown Commercial Office Conversion Program project

 

Project Allocation

50,000,000

(EEE)  Infrastructure, improvements, redevelopment, construction and other related costs for the renovation of the Historic Crawford Grill facility

 

Project Allocation

3,000,000

(FFF)  Infrastructure, renovation, rehabilitation and other related costs for an economic development project

 

Project Allocation

3,000,000

(GGG)  Construction, infrastructure, renovation and other related costs for the redevelopment and expansion of the Pittsburgh Ballet Theatre

 

Project Allocation

5,000,000

(HHH)  Construction, infrastructure, renovation, rehabilitation and other related costs for the development of the Marketplace of Ideas initiative

 

Project Allocation

3,000,000

(III)  Construction, rehabilitation, infrastructure, renovation and other related costs for the development of a facility for the Humane Animal Rescue of Pittsburgh

 

Project Allocation

2,500,000

(JJJ)  Construction, infrastructure, site preparation, rehabilitation and other related costs for the redevelopment of Beth Shalom Synagogue

 

Project Allocation

2,500,000

(KKK)  Construction, site preparation, demolition, infrastructure, acquisition and other costs related to the expansion and renovation of a STEM laboratory

 

Project Allocation

2,000,000

(LLL)  Construction, infrastructure and other costs related to the redevelopment of the National Aviary in Pittsburgh

 

Project Allocation

10,000,000

(MMM)  Construction, redevelopment and other related costs for the development of an advanced biotechnology center at Carnegie Mellon University

 

Project Allocation

10,000,000

(NNN)  Construction, redevelopment and other related costs for an economic development project at Carnegie Mellon University

 

Project Allocation

5,000,000

(OOO)  Renovation, rehabilitation and other related costs for the redevelopment of the DePaul School for Hearing and Speech

 

Project Allocation

625,000

(PPP)  Construction, renovation, infrastructure improvements and other related costs for the Kingsley Association in the neighborhood of Larimer

 

Project Allocation

6,000,000

(viii)  Bethel Park Borough

 

(A)  Construction, rehabilitation and other related costs for the improvement of the Irishtown, Patterson and Logan intersection with a roundabout

 

Project Allocation

1,300,000

(B)  Construction, infrastructure, redevelopment, rehabilitation and other related costs for the expansion of the Montour Trail and construction of sidewalks for pedestrians

 

Project Allocation

600,000

(viii.1)  Braddock Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for the development of a facility for Braddock Arts and Media

 

Project Allocation

2,000,000

(B)  Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of a building

 

Project Allocation

500,000

(viii.2)  Bradford Woods Borough

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

1,000,000

(ix)  Brentwood Borough

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to facilities at AHN Brentwood Neighborhood Hospital

 

Project Allocation

10,000,000

(B)  Construction, redevelopment and other related costs for Brentwood Municipal Public Safety Center

 

Project Allocation

3,000,000

(C)  Construction, redevelopment and other related costs for Brentwood Municipal Stadium

 

Project Allocation

1,000,000

(ix.1)  Crafton Borough

 

(A)  Crafton Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including improvements and upgrades to borough facilities

 

Project Allocation

5,000,000

(x)  Etna Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for residential, mixed-use and retail development

 

Project Allocation

10,000,000

(x.1)  Franklin Park Borough

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

1,000,000

(x.2)  Green Tree Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for Parkway Center Mall project as well as improvements and renovations to borough facilities

 

Project Allocation

10,000,000

(x.3)  Ingram Borough

 

(A)  Ingram Park renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects in the borough, including improvements and upgrades to borough facilities

 

Project Allocation

5,000,000

(xi)  Borough of Jefferson Hills

 

(A)  Acquisition, construction, infrastructure and other related costs for consolidation of existing and outdated fire stations into a new facility

 

Project Allocation

1,000,000

(B)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for facility upgrades and renovations for the Steel Center

 

Project Allocation

14,636,150

(xi.1)  McKees Rocks Borough

 

(A)  Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment projects, including replacement or renovation of the Borough Building or other borough facilities

 

Project Allocation

10,000,000

(xi.2)  Mt. Oliver Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for Brownsville Road Corridor development projects

 

Project Allocation

2,500,000

(xi.3)  Oakmont Borough and Plum Borough

 

(A)  Acquisition, construction, environmental remediation, infrastructure improvements, storm water management and other related costs for economic development initiatives at an outdoor facility and surrounding areas which host amateur and professional sporting events

 

Project Allocation

10,000,000

(xii)  Sharpsburg Borough and O'Hara Township

 

(A)  Construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs associated with the development of a site along the Allegheny River

 

Project Allocation

15,000,000

(xii.1)  Swissvale Borough

 

(A)  Acquisition, construction, infrastructure, site preparation, demolition and other related costs for the development of a municipal building

 

Project Allocation

1,000,000

(xii.2)  Thornburg Borough

 

(A)  Renovation, rehabilitation, general construction, infrastructure, acquisition and redevelopment within the borough, including, but not limited to, improvements and upgrades to borough facilities

 

Project Allocation

2,500,000

(xiii)  Wilkinsburg Borough

 

(A)  Renovation and rehabilitation of Community Forge to modernize key parts of the facility

 

Project Allocation

750,000

(B)  Construction, acquisition and other costs relating to the redevelopment of the Ardmore Boulevard Texaco Station site

 

Project Allocation

1,750,000

(C)  Construction and other costs related to the Wilkinsburg Townhome Development

 

Project Allocation

1,750,000

(xiv)  Wilmerding Borough

 

(A)  Acquisition, construction, infrastructure and other costs related to the expansion of Allegheny Petroleum Products

 

Project Allocation

20,000,000

(xiv.1)  Elizabeth Township

 

(A)  Construction, infrastructure and other related costs to convert a brownfield into a utility-scale solar field

 

Project Allocation

10,000,000

(xv)  Harmar Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Harmar Neighborhood Hospital

 

Project Allocation

10,000,000

(xv.1)  Marshall Township

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

1,000,000

(xvi)  McCandless Township

 

(A)  Acquisition, construction, infrastructure, redevelopment, and other related costs for facilities at AHN McCandless Neighborhood Hospital

 

Project Allocation

10,000,000

(B)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to infrastructure and renovation of the A.W. Beattie Career Center

 

Project Allocation

5,000,000

(xvii)  North Versailles Township

 

(A)  Acquisition, construction, infrastructure, renovation, rehabilitation and other related costs for economic development projects and the construction of a new township building complex

 

Project Allocation

10,000,000

(B)  Acquisition, construction, infrastructure and other related costs for historic, cultural or civic and economic development

 

Project Allocation

10,000,000

(xviii)  Pine Township

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at AHN Wexford Hospital

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

1,000,000

(xviii.1)  Scott Township

 

(A)  Renovations and rehabilitation project as well as general construction, infrastructure, acquisition and redevelopment project, including, but not limited to, renovation or replacement of the township building or other township facilities

 

Project Allocation

15,000,000

(xix)  South Fayette Township

 

(A)  Construction, infrastructure, redevelopment and other related costs for a municipal complex, police station and administration offices

 

Project Allocation

6,000,000

(xx)  South Park Township

 

(A)  Construction, infrastructure, redevelopment, rehabilitation and other related costs for an addition to existing building

 

Project Allocation

500,000

(B)  Construction, redevelopment, rehabilitation and other related costs for the reconstruction of Route 88 and Brownsville Road intersection, including sidewalks

 

Project Allocation

800,000

(xxi)  Town of McCandless

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

1,000,000

(B)  Construction and renovation of municipal facilities and park areas in the Town of McCandless

 

Project Allocation

1,000,000

(3)  Armstrong County

 

(i)  County projects

 

(A)  Site development, construction and other related costs for relocation of the ARC Manor residential facility to property in the West Hills Industrial Park

 

Project Allocation

2,000,000

(B)  Acquisition, infrastructure, construction and other related costs for an on-campus, assisted living/senior housing facility adjacent to the Armstrong Center for Medicine and Health (ACMH), including expansion, acquisition of properties and buildings, renovations and equipment upgrades at ACMH facilities

 

Project Allocation

10,000,000

(C)  Construction, infrastructure and other related costs for construction of a two-story building for additional instructional space at Butler County Community College

 

Project Allocation

1,750,000

(D)  Acquisition, construction and other related costs for the improvement of the South Bend Quarry lightweight aggregate production facility

 

Project Allocation

5,000,000

(4)  Beaver County

 

(i)  County projects

 

(A)  Construction, infrastructure and other related costs for public works building and fire station in Big Beaver Borough

 

Project Allocation

500,000

(B)  Construction, infrastructure and other related costs for rehabilitation of the Legacy Dining Hall at Pine Valley Camp, including roofing, steel structure, enclosures, utilities and fire suppression services

 

Project Allocation

1,000,000

(C)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for an emergency services garage, training and storage facility in the Borough of Ambridge

 

Project Allocation

2,000,000

(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(F)  Redevelopment, restoration and other related costs for the former Pittsburgh and Lake Erie Railroad passenger station to be used as a multipurpose meeting and event space

 

Project Allocation

1,000,000

(G)  Construction, infrastructure and other related costs for a public works building and fire station in Big Beaver Borough

 

Project Allocation

500,000

(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(K)  Acquisition, infrastructure, construction and other related costs for expansion of multiuse community operational food facilities and headquarters for Crop and Kettle

 

Project Allocation

3,000,000

(ii)  Beaver County Corporation for Economic Development

 

(A)  Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility

 

Project Allocation

1,000,000

(B)  Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment of industrial properties located within Ellwood City

 

Project Allocation

15,000,000

(C)  Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located within Potter Township

 

Project Allocation

15,000,000

(D)  Infrastructure, site improvements and other related costs for construction of compressed natural gas fueling facility

 

Project Allocation

1,000,000

(E)  Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for redevelopment and improvement of industrial sites located in Potter Township

 

Project Allocation

15,000,000

(iii)  Redevelopment Authority of Beaver County

 

(A)  Renovation and rehabilitation of patient rooms and corridors at Heritage Valley Beaver Hospital facility

 

Project Allocation

1,000,000

(B)  Rehabilitation, construction and other related costs for renovations to radiology department at Heritage Valley Beaver Hospital facility

 

Project Allocation

1,000,000

(iii.1)  City of Aliquippa

 

(A)  Acquisition, construction, infrastructure and other related costs for a business or manufacturing facility associated with the petrochemical industry

 

Project Allocation

10,000,000

(B)  Infrastructure, demolition, construction and other related costs for rehabilitation and renovation of the high school stadium

 

Project Allocation

2,000,000

(iii.2)  Ambridge Borough

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a health, wellness and sports complex that will include exercise space and indoor athletic courts

 

Project Allocation

5,000,000

(iv)  Baden Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for Baden Academy Charter School expansion project

 

Project Allocation

5,000,000

(iv.1)  Conway Borough

 

(A)  Acquisition, site preparation, renovation, remediation, demolition, construction, infrastructure and other related costs to be used for a municipal building project

 

Project Allocation

3,000,000

(v)  Ellwood City Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for redevelopment projects

 

Project Allocation

15,000,000

(vi)  Harmony Township

 

(A)  Construction, infrastructure and other related costs for CNG conversion project

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park

 

Project Allocation

20,000,000

(C)  Construction, infrastructure and other related costs for CNG conversion project

 

Project Allocation

1,000,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for an industrial park

 

Project Allocation

20,000,000

(5)  Bedford County

 

(i)  County projects

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for the Mission Critical Solutions Expansion project

 

Project Allocation

750,000

(B)  Design, engineering, demolition, renovation and construction for a community center and office space to house service providers and resources that promote self-sufficiency and community and economic development in Snake Spring Township

 

Project Allocation

606,000

(ii)  Bedford County Development Association

 

(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects in the county

 

Project Allocation

5,000,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of a community development project

 

Project Allocation

5,000,000

(iii)  Bedford County Economic Development Corporation

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk

 

Project Allocation

5,000,000

(6)  Berks County

 

(i)  County projects

 

(A)  Construction, infrastructure, redevelopment and other related costs for a St. Luke's Medical Office Building in Ontelaunee Township

 

Project Allocation

5,000,000

(B)  Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials related to an affordable, accessible and inclusive apartment complex and community and education center in the county

 

Project Allocation

5,000,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation and abatement of hazardous materials relating to economic projects in the county

 

Project Allocation

30,000,000

(D)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility

 

Project Allocation

10,000,000

(E)  Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility

 

Project Allocation

10,000,000

(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(G)  Acquisition, infrastructure, construction and other related costs for development of 104 acres for expansion of Reading Health System

 

Project Allocation

3,500,000

(H)  Acquisition, construction, infrastructure, redevelopment and other related costs for projects for Berks County Community Health Center

 

Project Allocation

15,000,000

(I)  Rehabilitation of railroad, including track improvements, siding extensions, visitors center, equipment and equipment maintenance facility, construction and related work to enhance economic development opportunities and preserve corridor for future freight traffic in Berks and Montgomery Counties

 

Project Allocation

10,000,000

(ii)  Berks County Redevelopment Authority

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for sewer-related services extension for the Blue Rock Bowman Business Center

 

Project Allocation

3,000,000

(B)  Redevelopment, infrastructure, construction and other related costs for a business expansion project in the county

 

Project Allocation

10,000,000

(C)  Rehabilitation, infrastructure, renovation, abatement of hazardous materials, construction and other related costs for redevelopment of Titus Station, a 200-acre industrial-zoned property in the county

 

Project Allocation

10,000,000

(D)  Acquisition, construction, infrastructure, rehabilitation and other related costs for expansion of Frecon Farms

 

Project Allocation

5,000,000

(ii.1)  Reading Redevelopment Authority

 

(A)  Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 212 S. 8th Street and surrounding properties

 

Project Allocation

10,000,000

(B)  Acquisition, demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for 7th Street and Franklin Street as well as surrounding properties

 

Project Allocation

10,000,000

(ii.2)  Berks County Industrial Development Authority

 

(A)  Acquisition, construction, infrastructure, renovation and other related costs for development projects in Berks County

 

Project Allocation

10,000,000

(iii)  City of Reading

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment and rehabilitation of several buildings and properties in the area of 7th and Franklin Streets

 

Project Allocation

30,000,000

(B)  Construction, infrastructure, acquisition, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Performing Arts Center

 

Project Allocation

10,000,000

(C)  Construction, acquisition, infrastructure, renovation and rehabilitation relating to the general renovation and upgrade of the Santander Arena

 

Project Allocation

10,000,000

(D)  Construction, acquisition, infrastructure, renovation and rehabilitation of a project involving the building of a new state-of-the-art early learning academy, with related academic training and support programs

 

Project Allocation

16,500,000

(E)  Renovation, rehabilitation and infrastructure relating to upgrades and renovations to an existing structure for the Reading Area Community College Weitz Health Pavilion

 

Project Allocation

10,000,000

(F)  Construction, acquisition, infrastructure, renovation and rehabilitation relating to a new support or academic facility for college and community use

 

Project Allocation

5,000,000

(G)  Renovation, restoration, construction, infrastructure improvements and other related costs to enhance and modernize the Reading Public Museum

 

Project Allocation

5,000,000

(H)  Construction, infrastructure and other related costs for an early learning center at Albright College

 

Project Allocation

1,500,000

(I)  Construction, infrastructure and other related costs for Albright College Co-Generation Plant expansion project

 

Project Allocation

2,500,000

(J)  Construction, infrastructure and other related costs for Albright College Track and Field Facility project

 

Project Allocation

1,500,000

(K)  Construction, infrastructure and other related costs for Albright College Library Holocaust Resource Center project

 

Project Allocation

500,000

(L)  Renovation, restoration, reconstruction, infrastructure improvements and related costs for Reading Public Museum

 

Project Allocation

1,112,000

(M)  Construction, infrastructure improvements and other related costs for installation of a natural gas refueling station at Evergreen Community Power site

 

Project Allocation

5,000,000

(N)  Construction, reconstruction, rehabilitation, remediation, infrastructure improvements and other related costs for redevelopment of existing building at Evergreen Community Power site

 

Project Allocation

5,000,000

(O)  Construction, infrastructure improvements and related costs for the Reading Area Community College Berks Hall renovation and conservation project

 

Project Allocation

600,000

(P)  Construction, infrastructure improvements and related costs for the Reading Area Community College pedestrian safety, gateway and traffic improvement project

 

Project Allocation

1,178,000

(iii.1)  Bernville Borough

 

(A)  Acquisition, construction and other related costs for a new borough hall, library, police department, fire station and community center at the same location

 

Project Allocation

3,500,000

(iii.2)  Mohnton Borough

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for a Holocaust Museum

 

Project Allocation

1,750,000

(iii.3)  West Reading Borough

 

(A)  Acquisition, infrastructure, renovations and other related costs for Reading Health System surgical tower and related facilities

 

Project Allocation

3,500,000

(iv)  Wyomissing Borough

 

(A)  Acquisition, demolition, environmental remediation, infrastructure, site work, redevelopment, construction and related costs for blighted and underutilized sites intended for redevelopment

 

Project Allocation

10,000,000

(v)  Bern Township

 

(A)  Construction, acquisition, redevelopment and other costs to develop a portion of Reading Regional Airport Authority-owned land for an end-user, with the potential for a maintenance and overhaul (MRO) operator and amenities other than fuel

 

Project Allocation

8,400,000

(B)  Construction, infrastructure, redevelopment, renovation and other related costs for Penn State Health St. Joseph Regional Medical Center

 

Project Allocation

6,000,000

(v.1)  Maxatawny Township

 

(A)  Acquisition, construction, infrastructure, renovation and other related costs for an expansion project at the Rodale Institute

 

Project Allocation

5,000,000

(vi)  Muhlenberg Township

 

(A)  Construction, facility improvements and renovations for the KidsPeace Berks campus

 

Project Allocation

1,000,000

(B)  Acquisition, infrastructure, renovations and other related costs for NKG Metals facility redevelopment and reuse project

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, renovations and other related costs for Fifth Street Highway Corridor revitalization project

 

Project Allocation

10,000,000

(vii)  Ontelaunee Township

 

(A)  Design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a copper tubing manufacturing facility

 

Project Allocation

3,000,000

(7)  Blair County

 

(i)  County projects

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Nason Medical Center

 

Project Allocation

5,000,000

(B)  Acquisition, construction, restoration, historic preservation and other related costs for a rail heritage development project with the Railroaders Memorial Museum

 

Project Allocation

40,000,000

(ii)  Altoona-Blair County Development Corporation

 

(A)  Construction, infrastructure, rehabilitation and other related costs for upgrades and improvements to the Peoples Natural Gas Field baseball stadium

 

Project Allocation

10,000,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of a facility or facilities of the Southern Alleghenies Museum of Art

 

Project Allocation

1,000,000

(8)  Bradford County

 

(i)  (Reserved)

 

(9)  Bucks County

 

(i)  County projects

 

(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network Facility 1

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of bridges, trails, locks and other structures along Delaware Canal State Park

 

Project Allocation

3,000,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a life sciences advance manufacturing facility

 

Project Allocation

15,000,000

(D)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction or renovation of buildings in order to utilize renewable energy or manufacture products to produce renewable energy

 

Project Allocation

5,000,000

(E)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects

 

Project Allocation

5,000,000

(F)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to a community mental health crisis center

 

Project Allocation

2,500,000

(G)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition, renovation and construction of facilities for workforce development

 

Project Allocation

5,000,000

(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(ii)  Bucks County Industrial Development Authority

 

(A)  Construction, infrastructure, renovation and other related costs for water, sewer, commercial and industrial projects in Bensalem Township

 

Project Allocation

3,000,000

(B)  Acquisition, construction, infrastructure and abatement of hazardous materials for a mixed-use development project in Quakertown Borough

 

Project Allocation

5,000,000

(C)  Acquisition of land and other related costs for future construction and manufacturing expansion at the Klover III Panel Shop

 

Project Allocation

5,000,000

(D)  Acquisition, construction and other related costs for future construction of a crane-served building for increased engineering-related and manufacturing-related job expansion at the Klover III Panel Shop

 

Project Allocation

11,000,000

(E)  Construction, acquisition, infrastructure, redevelopment and other costs related to a mixed-use development project located at the corner of West Broad and Front Streets in Quakertown Borough

 

Project Allocation

2,500,000

(F)  Acquisition, construction and other related costs to purchase a prepared storage yard and construct a crane-served building for Klover Contracting in Richland Township

 

Project Allocation

7,250,000

(iii)  Redevelopment Authority of the County of Bucks

 

(A)  Infrastructure, redevelopment, renovation, rehabilitation and other related costs to repurpose a former military site in Warminster Township

 

Project Allocation

5,000,000

(B)  Infrastructure, redevelopment and other related costs for an economic development project along the Delaware River in Bensalem Township

 

Project Allocation

5,000,000

(C)  Construction, redevelopment, renovation and other related costs for a historic building in Bristol Borough

 

Project Allocation

500,000

(D)  Construction, redevelopment and infrastructure for the installation of curbs and sidewalks and storm water management in Bensalem Township

 

Project Allocation

5,000,000

(E)  Construction, redevelopment, rehabilitation and other related costs for the Mill Race Inn site in Northampton Township

 

Project Allocation

3,000,000

(F)  Acquisition, construction, infrastructure, hazardous material remediation and other related costs for the Neshaminy Mall site in Bensalem Township

 

Project Allocation

10,000,000

(G)  Acquisition and construction for corporate headquarters development project in Bensalem Township

 

Project Allocation

10,000,000

(H)  Acquisition, rehabilitation, infrastructure, flood mitigation and associated costs for a riverfront redevelopment project

 

Project Allocation

10,000,000

(iv)  Bristol Borough

 

(A)  Acquisition, construction and infrastructure for a new consolidated fire station in the borough

 

Project Allocation

1,500,000

(v)  Doylestown Borough

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation of a former PennDOT building and construction of additional structures for a regional police facility and mixed-use complex

 

Project Allocation

2,500,000

(vi)  Morrisville Borough

 

(A)  Construction, acquisition, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the acquisition and renovation of an existing building for affordable housing

 

Project Allocation

3,000,000

(vii)  New Hope Borough

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the land acquisition and construction of a parking garage

 

Project Allocation

4,000,000

(viii)  Perkasie Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for the Pennridge Airport Business Park

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, redevelopment and other related costs for a retail/entertainment development project in downtown Perkasie Borough

 

Project Allocation

750,000

(ix)  Bensalem Township

 

(A)  Construction and other related costs for the installation of a new drainage infrastructure project for the Bensalem Township County Club

 

Project Allocation

1,000,000

(B)  Construction and renovation of a recreational facility located in the township

 

Project Allocation

1,000,000

(x)  Bristol Township

 

(A)  Infrastructure, construction and other related costs for a new fire and rescue services building in the township

 

Project Allocation

2,500,000

(B)  Infrastructure, construction and other related costs for a new fire and rescue services building

 

Project Allocation

2,500,000

(C)  Construction, reconstruction, renovation, infrastructure, improvements related to energy, transportation, parking and common areas and all other related costs for expansion and renovation of an existing facility

 

Project Allocation

5,000,000

(D)  Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the redevelopment of buildings and facilities at Lower Bucks Hospital

 

Project Allocation

525,000

(xi)  Buckingham Township

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development of the PA Biotechnology Center Research Clusters

 

Project Allocation

10,000,000

(xii)  Doylestown Township

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former county nursing home into a mixed-use facility

 

Project Allocation

5,000,000

(B)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the renovation and construction of a forensic diversion, treatment and rehabilitation center for mental health and substance abuse treatment and rehabilitation on land owned by Bucks County

 

Project Allocation

4,000,000

(xiii)  Doylestown Township and New Britain Borough

 

(A)  Construction, infrastructure, abatement of hazardous materials, renovation, rehabilitation and other costs related to the construction and renovation of three major capital projects at the Delaware Valley University relating to a mixed-use, multigenerational housing and health care development; the redevelopment of the campus gateway and main entrance to include a boutique hotel and conference center; and renovations to student housing buildings

 

Project Allocation

40,000,000

(xiv)  Falls Township

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of a historic fire house to accommodate necessary fire equipment, firefighter accommodations and a community room

 

Project Allocation

200,000,000

(B)  Acquisition, construction, infrastructure and other related costs for the Keystone Trade Center Project

 

Project Allocation

10,000,000

(xv)  Lower Makefield Township

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction and/or renovation of Municipal Complex and Police Department

 

Project Allocation

10,000,000

(xvi)  Lower Southampton Township

 

(A)  Construction, renovation and other related costs for projects at a swimming complex located in the township

 

Project Allocation

1,000,000

(xvii)  Middletown Township

 

(A)  Infrastructure, construction, demolition, abatement of hazardous materials and other related costs for redevelopment of the township's Department of Public Works yard and facilities

 

Project Allocation

5,000,000

(B)  Construction, redevelopment and other related costs for a new education and training building and the renovation of an existing building for Woods Education and Training Center

 

Project Allocation

1,000,000

(xviii)  Northampton Township

 

(A)  Construction, infrastructure and other related costs for a new fire station

 

Project Allocation

2,000,000

(xviii.1)  Plumstead Township

 

(A)  Construction, renovation and other related costs for renovations to Plumsteadville Volunteer Fire Company Station 24

 

Project Allocation

800,000

(B)  Demolition, construction and other related costs for the demolition of an old fire house and the construction of a replacement structure for Plumsteadville Volunteer Fire Company Station 20

 

Project Allocation

600,000

(xix)  Richland Township

 

(A)  Acquisition, construction, infrastructure and other related costs for the expansion of St. Luke's Upper Bucks Campus to meet the growing health care needs of the community

 

Project Allocation

10,000,000

(xx)  Solebury Township

 

(A)  Construction, infrastructure and other related costs to build a new facility and parking areas for the Bucks County Children's Museum

 

Project Allocation

500,000

(xxi)  Warwick Township

 

(A)  Construction of sidewalks and street frontages in the township

 

Project Allocation

1,500,000

(10)  Butler County

 

(i)  County projects

 

(A)  Site preparation, environmental remediation, development and redevelopment, infrastructure, construction and other related costs for economic development in the county

 

Project Allocation

15,000,000

(B)  Acquisition, construction, renovation and other related costs for a firm in Marshall Township to acquire a robotics and manufacturing test facility or proving grounds in the fields of automation, transportation and technology

 

Project Allocation

600,000

(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(ii)  Butler County Community Development Corporation

 

(A)  Acquisition, infrastructure, abatement of hazardous materials, rehabilitation, construction and other related costs for a Bantam Jeep Events Center

 

Project Allocation

2,000,000

(iii)  Cranberry Township

 

(A)  Construction, acquisition, infrastructure, redevelopment, abatement of hazardous materials and other related costs for expansion and improvement of the Kawneer facilities

 

Project Allocation

10,000,000

(B)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for parks, recreational and open space in the township

 

Project Allocation

2,000,000

(C)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for economic development projects in the township

 

Project Allocation

5,000,000

(D)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for the Cranberry Township Municipal Center

 

Project Allocation

2,500,000

(E)  Acquisition, construction, infrastructure, rehabilitation, environmental remediation and other related costs for township-owned facilities

 

Project Allocation

5,000,000

(iv)  Slippery Rock Township

 

(A)  Acquisition, infrastructure, renovation, redevelopment, construction and other related costs for Slippery Rock University Foundation development

 

Project Allocation

1,500,000

(v)  Zelienople Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for development of Sensory House Museum on Glade Run's Zelienople campus for individuals with autism and other developmental disabilities

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a new fire station for Harmony Fire District

 

Project Allocation

2,500,000

(11)  Cambria County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center

 

Project Allocation

2,500,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a cultural, civic and historical community development project

 

Project Allocation

5,000,000

(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for a regional economic development project

 

Project Allocation

5,000,000

(D)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements related to energy, transportation, parking and common areas and other related costs for expansion, historic preservation and development of Conemaugh Health System

 

Project Allocation

5,000,000

(E)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an economic development project at John Murtha Johnstown-Cambria County Airport

 

Project Allocation

5,000,000

(F)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for an infrastructure and facility improvement project at Saint Francis University

 

Project Allocation

7,500,000

(G)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of any Conemaugh Health System new or existing facility located in the county

 

Project Allocation

5,000,000

(H)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of an economic development project located at the John Murtha Johnstown-Cambria County Airport in Richland Township

 

Project Allocation

5,000,000

(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(J)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(K)  Construction, acquisition, redevelopment and other related costs for the installation of communications infrastructure in the county

 

Project Allocation

9,000,000

(L)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of building and grounds, and all other related costs for the development of a Community Health Wellness and Recreation Facility in the county

 

Project Allocation

10,000,000

(i.1)  Cambria County Redevelopment Authority

 

(A)  Acquisition, renovation, redevelopment, construction, infrastructure and other related costs for the development of the Mid Atlantic Opportunity Park at Jack Murtha Cambria County Airport

 

Project Allocation

10,000,000

(ii)  City of Johnstown

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous materials assessment and remediation, infrastructure improvement, including improvements related to energy, transportation, parking and common areas, and all other related costs for development, expansion, renovation, redevelopment, reuse, historic preservation and green development of the Cambria County War Memorial

 

Project Allocation

5,000,000

(B)  Construction and other related costs of a new firehouse and Public Safety Administration Building for the city

 

Project Allocation

3,000,000

(C)  Economic development activities, including acquisition, construction, demolition, rehabilitation, infrastructure, installation of energy-efficient equipment and systems, for a pharmaceutical manufacturing facility

 

Project Allocation

10,000,000

(D)  Construction, infrastructure, acquisition, renovation, rehabilitation and other related costs to upgrade a facility at the Cambria County War Memorial site

 

Project Allocation

1,000,000

(E)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs to develop a civic center in the city

 

Project Allocation

3,000,000

(F)  Acquisition, construction, demolition, rehabilitation, infrastructure, energy systems and equipment and other related costs for a pharmaceutical manufacturing facility

 

Project Allocation

10,000,000

(iii)  Cresson Township

 

(A)  Acquisition, construction, demolition, renovation, rehabilitation, infrastructure and other related costs for the Mount Aloysius College campus

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of Ihmsen Hall at Mount Aloysius College

 

Project Allocation

5,000,000

(12)  Cameron County

 

(i)  (Reserved)

 

(13)  Carbon County

 

(i)  County projects

 

(A)  Construction, site development, infrastructure and other related costs for an educational facility located at Lehigh Carbon Community College

 

Project Allocation

4,000,000

(B)  Acquisition, construction, renovation, infrastructure and other related costs for expansion of the Carbon County Correctional facility

 

Project Allocation

5,000,000

(C)  Acquisition, demolition, construction, site development, infrastructure improvements and other related costs for economic development projects in the county

 

Project Allocation

7,500,000

(D)  Acquisition, demolition, construction, infrastructure improvements and other related costs to repurpose sites within Nesquehoning Borough

 

Project Allocation

10,000,000

(E)  Construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation, renovation, equipment and expansion of the county Human Services building

 

Project Allocation

2,500,000

(F)  Infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the renovation and expansion of office space for the county, including equipment and furniture costs in Jim Thorpe Borough

 

Project Allocation

2,500,000

(ii)  Reading Blue Mountain and Northern Railroad

 

(A)  Acquisition, redevelopment, rehabilitation and other related costs for renovation of buildings and grounds of the Nesquehoning plant to support anthracite coal shipping domestically and internationally

 

Project Allocation

1,000,000

(ii.1)  Carbon Chamber and Economic Development Corporation

 

(A)  Construction, infrastructure, abatement of hazardous materials, rehabilitation and other related costs for the redevelopment of a former industrial site in Nesquehoning Borough

 

Project Allocation

4,000,000

(iii)  Bowmanstown Borough

 

(A)  Construction, infrastructure and other related costs for a new fire station, borough hall and emergency shelter

 

Project Allocation

1,000,000

(iv)  Nesquehoning Borough

 

(A)  Acquisition, redevelopment and other related costs for the renovation of current buildings and grounds and for repair and maintenance of open-top and covered hoppers to support anthracite coal shipping domestically and internationally

 

Project Allocation

1,000,000

(v)  Palmerton Borough

 

(A)  Acquisition, site preparation, abatement, development, construction and infrastructure, including improvements related to energy and water utilities, on the former site of the New Jersey Zinc Company (West Plant)

 

Project Allocation

20,000,000

(14)  Centre County

 

(i)  County projects

 

(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(C)  Acquisition, infrastructure, construction and other related costs for rehabilitation and expansion of Memorial Field and Central Parklet in State College Borough

 

Project Allocation

8,000,000

(D)  Acquisition, infrastructure, construction and other related costs for centralized, all-inclusive YMCA multisports facility

 

Project Allocation

10,000,000

(E)  Construction, infrastructure, acquisition and other related costs for development of natural gas services

 

Project Allocation

5,000,000

(i.1)  Geisinger Authority

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for expanded access to primary and specialty care project

 

Project Allocation

3,000,000

(ii)  Moshannon Valley Economic Development Partnership, Inc.

 

(A)  Construction and other related costs for a new Moshannon Valley Emergency Medical Services ambulance headquarters building

 

Project Allocation

2,000,000

(iii)  The Pennsylvania State University

 

(A)  Critical infrastructure improvements to athletic facilities at University Park campus

 

Project Allocation

150,000,000

(iv)  State College Borough

 

(A)  Construction, infrastructure and other related costs for mixed-use development, including retail, hotel, residential and parking

 

Project Allocation

5,000,000

(15)  Chester County

 

(i)  County projects

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services

 

Project Allocation

10,000,000

(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing

 

Project Allocation

10,000,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources

 

Project Allocation

10,000,000

(D)  Acquisition, infrastructure, remediation, renovation, construction and other related costs for the adaptive reuse of historical assets (both land and buildings) throughout the county

 

Project Allocation

10,000,000

(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates

 

Project Allocation

20,000,000

(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(I)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of the mushroom industry

 

Project Allocation

40,000,000

(ii)  City of Coatesville

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of a new public safety, fire, police and EMS station

 

Project Allocation

15,000,000

(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the construction of an economic development project to include retail, commercial, manufacturing, industrial and housing projects

 

Project Allocation

20,000,000

(iii)  City of Coatesville and Valley Township

 

(A)  Acquisition, infrastructure, remediation, construction and other related costs for the economic development of the National Sports Events Center

 

Project Allocation

10,000,000

(iv)  Downingtown Borough

 

(A)  Acquisition, infrastructure, remediation, renovation, construction and other related costs for the redevelopment of the former industrial maintenance yard

 

Project Allocation

10,000,000

(v)  Kennett Square Borough

 

(A)  Acquisition, infrastructure, remediation, renovation, construction and other related costs for redeveloping a former industrial site

 

Project Allocation

5,000,000

(B)  Site preparation, construction, acquisition, preparation, infrastructure and other related costs for the redevelopment of the Kennett Library

 

Project Allocation

3,000,000

(vi)  Modena Borough

 

(A)  Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation of historic buildings and new municipal construction

 

Project Allocation

2,000,000

(vi.1)  Phoenixville Borough

 

(A)  Construction, infrastructure improvements and other costs related to Colonial Theatre expansion project

 

Project Allocation

4,000,000

(B)  Mixed-use development, including construction, infrastructure, acquisition and related costs at former Phoenix Steel site

 

Project Allocation

5,000,000

(C)  Construction, acquisition, infrastructure, redevelopment and other related costs for parking garage and reconstruction of transit service trestle bridge

 

Project Allocation

2,000,000

(D)  Construction, renovation and other related costs for upgrades to Reeves Park, including renovations to historic memorials and Civil War-era display

 

Project Allocation

750,000

(vii)  West Chester Borough

 

(A)  Acquisition, infrastructure, remediation, abatement of hazardous materials, renovation, construction and other costs related to the development and expansion of a West Chester train line and transportation center

 

Project Allocation

20,000,000

(B)  Site preparation, construction, infrastructure and other related costs for the renovation and redevelopment of a community cafe and culinary institute with expanded workforce development training facilities, a health and wellness clinic and a day-care facility at the Charles A. Melton Arts & Education Center

 

Project Allocation

3,000,000

(C)  Site preparation, construction and other related costs for the revitalization and redevelopment of the Charles A. Melton Arts & Education Center

 

Project Allocation

5,000,000

(D)  Acquisition, construction, infrastructure and other related costs for West Chester Borough redevelopment projects

 

Project Allocation

7,000,000

(E)  Acquisition, construction, infrastructure and other related costs for former biopharma site redevelopment projects

 

Project Allocation

2,500,000

(viii)  Berwyn Township

 

(A)  Acquisition, construction, demolition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to infrastructure improvements at Berwyn Fire Company

 

Project Allocation

4,500,000

(viii.1)  Birmingham Township

 

(A)  Site preparation, construction, adaptive reuse and other related costs for the development of a museum and education center on Linden Farm on Brandywine Battlefield

 

Project Allocation

1,200,000

(ix)  East Fallowfield Township

 

(A)  Acquisition, infrastructure, remediation, renovation, construction and other related costs for the development of a new municipal building

 

Project Allocation

1,500,000

(x)  East Goshen Township

 

(A)  Acquisition, construction, redevelopment, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to enhancements at the CTDI manufacturing facility, distribution center and headquarters

 

Project Allocation

10,000,000

(x.1)  East Marlborough Township

 

(A)  Infrastructure, construction, preparation and other related costs for a wastewater treatment facility at Longwood Gardens

 

Project Allocation

1,000,000

(x.2)  East Whiteland Township

 

(A)  Construction, site preparation, demolition, infrastructure, acquisition and other costs for an economic development project

 

Project Allocation

10,000,000

(xi)  Elk Township

 

(A)  Infrastructure, remediation, renovation, construction and other related costs for redevelopment and expansion projects at the South Mill Champs mushroom facility

 

Project Allocation

5,000,000

(xii)  Kennett Township

 

(A)  Construction, infrastructure and other related costs for a Kennett Area Community Service (KACS) facility

 

Project Allocation

5,000,000

(xiii)  London Grove Township

 

(A)  Demolition, infrastructure, environmental remediation, site work, construction and other related costs necessary to construct a materials recovery facility for rural, single-stream recycling at the Southeastern Chester County Refuse Authority landfill

 

Project Allocation

3,000,000

(xiv)  New Garden Township

 

(A)  Infrastructure, remediation, renovation, construction and other related costs for the rehabilitation and renovation of a former 137-acre day camp into a regional park and amphitheater for public use

 

Project Allocation

5,000,000

(xv)  Sadsbury Township

 

(A)  Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other costs related to economic development projects at 110 Stewart Huston Drive

 

Project Allocation

5,000,000

(B)  Acquisition, construction, renovation, rehabilitation, infrastructure, redevelopment and other related costs for the enhancements at an International Paper manufacturing or distribution site

 

Project Allocation

5,000,000

(xvi)  Schuylkill Township

 

(A)  Construction and other related costs for renovations to municipal complex, including police indoor shooting range, installation of geothermal and solar and new outbuilding

 

Project Allocation

1,250,000

(B)  Construction, renovation, demolition, abatement of hazardous chemicals and other related costs for fire company apparatus

 

Project Allocation

4,500,000

(xvii)  West Goshen Township

 

(A)  Acquisition, construction, infrastructure and other related costs for the expansion and redevelopment of Carlino's Market food manufacturing facility

 

Project Allocation

2,500,000

(xviii)  Westtown Township

 

(A)  Acquisition, infrastructure, site preparation and other related costs associated with the redevelopment of Crebilly Farm

 

Project Allocation

14,500,000

(16)  Clarion County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, equipment, abatement of hazardous materials, construction and other related costs for upgrades and improvements to the Modern Living Solutions site

 

Project Allocation

2,500,000

(B)  Construction, infrastructure and other related costs for renovations of the Foxburg Country Club and golf course

 

Project Allocation

2,000,000

(C)  Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for county facility projects

 

Project Allocation

10,000,000

(D)  Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for open space, trail, tourism and outdoor recreation projects

 

Project Allocation

10,000,000

(E)  Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for economic development and community revitalization projects

 

Project Allocation

10,000,000

(ii)  Knox Borough

 

(A)  Acquisition, construction, infrastructure, equipment, redevelopment and other related costs for an economic development project

 

Project Allocation

5,000,000

(17)  Clearfield County

 

(i)  (Reserved)

 

(ii)  Clearly Ahead - Clearfield County Economic Development Corporation

 

(A)  Infrastructure, redevelopment and other related costs for design and construction of a shell building in Curwensville Borough

 

Project Allocation

2,000,000

(B)  Infrastructure, redevelopment and other related costs for design and construction of a shell building in Lawrence Township

 

Project Allocation

2,250,000

(iii)  Sandy Township

 

(A)  Construction, infrastructure and other related costs for an indoor sports complex, parking area, storm water management, associated utility extensions and a traffic control device

 

Project Allocation

2,050,000

(18)  Clinton County

 

(i)  (Reserved)

 

(19)  Columbia County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(ii)  Columbia County Housing and Redevelopment Authorities

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for expansion of the Berwick YMCA, including space for a basketball court and additional parking

 

Project Allocation

2,000,000

(B)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure, redevelopment and other related costs for the expansion of the Bloomsburg YMCA for a new child-care facility

 

Project Allocation

3,000,000

(20)  Crawford County

 

(i)  County projects

 

(A)  Construction, infrastructure and other related costs for Bethesda Lutheran Services

 

Project Allocation

1,500,000

(ii)  Economic Progress Alliance of Crawford County

 

(A)  Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Cochranton Community Services Complex

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure, site planning, storm water management, abatement of hazardous materials and other related costs for phases of development at the Linesville Business Park

 

Project Allocation

2,000,000

(C)  Land and right-of-way acquisition, planning, permitting, rehabilitation, construction and other related costs for economic development projects in and around the Keystone Regional Industrial Park and surrounding regional areas

 

Project Allocation

20,000,000

(D)  Acquisition, construction, infrastructure and other related costs for redevelopment and expansion of Meadville Medical Center

 

Project Allocation

25,000,000

(iii)  Borough of Conneaut Lake

 

(A)  Construction, infrastructure, redevelopment and other related costs for revitalization of the downtown business district

 

Project Allocation

4,000,000

(21)  Cumberland County

 

(i)  County projects

 

(A)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for redevelopment and/or expansion of Williams Grove Historical Steam Engine site

 

Project Allocation

2,500,000

(B)  Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other costs associated with the development of a PA Agriculture Discovery Center attraction

 

Project Allocation

10,000,000

(ii)  Cumberland Area Economic Development Corporation

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Central Penn College campus

 

Project Allocation

5,000,000

(B)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a redevelopment and renovation project in Silver Spring Township

 

Project Allocation

5,000,000

(C)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for a freestanding rehabilitation hospital located in Hampden Township

 

Project Allocation

10,000,000

(D)  Acquisition, construction, redevelopment, renovation, infrastructure, abatement of hazardous materials and other related costs for improvements to a Safe Harbour facility

 

Project Allocation

1,250,000

(E)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for renovation of farm land buildings in Monroe Township

 

Project Allocation

4,000,000

(iii)  Cumberland County Industrial Development Authority

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the historic Penn Harris Hotel located in East Pennsboro Township

 

Project Allocation

5,000,000

(B)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for the redevelopment and renovation of the historic Penn Harris Hotel

 

Project Allocation

5,000,000

(iv)  Susquehanna Area Regional Airport Authority

 

(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for safety improvements and economic development at Capital City Airport

 

Project Allocation

1,500,000

(iv.1)  East Pennsboro Township

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of an existing structure and property for the creation of a health care workforce training center at Central Penn College

 

Project Allocation

2,000,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of community sports and recreational facilities at Central Penn College

 

Project Allocation

5,000,000

(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the redevelopment of existing structures and property for affordable student housing at Central Penn College

 

Project Allocation

2,000,000

(v)  Hampden Township

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hampden Township Municipal Pool

 

Project Allocation

2,000,000

(vi)  Mechanicsburg Borough

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment of the Mechanicsburg Borough Downtown Partnership project

 

Project Allocation

2,500,000

(vii)  Silver Spring Township

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for redevelopment and renovation of the Hempt Farms

 

Project Allocation

10,000,000

(viii)  South Middletown Township

 

(A)  Acquisition, renovation, construction, infrastructure and other related costs for a community revitalization and economic development project in the township

 

Project Allocation

5,000,000

(B)  Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for a community revitalization and economic development project

 

Project Allocation

5,000,000

(C)  Acquisition, site preparation, renovation, construction, infrastructure and other associated costs for the improvement, expansion, redevelopment and revitalization of the Carlisle Airport facilities

 

Project Allocation

20,000,000

(22)  Dauphin County

 

(i)  County projects

 

(A)  Site preparation, acquisition, remediation, renovation, construction, redevelopment, infrastructure and other related costs for development of a PA Agriculture Discovery Center attraction

 

Project Allocation

10,000,000

(B)  Acquisition, construction, infrastructure, redevelopment and other related costs for a mixed-use commercial development project in Derry Township

 

Project Allocation

5,000,000

(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(ii)  Redevelopment Authority of Harrisburg

 

(A)  Acquisition, rehabilitation, construction, infrastructure and other related costs for economic development and growth of Harrisburg businesses

 

Project Allocation

10,000,000

(B)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects in the City of Harrisburg

 

Project Allocation

10,000,000

(ii.1)  Capital Region Economic Development Corporation

 

(A)  Modernization, construction, storm water management, electrical, exterior work and other related costs for the redevelopment and renovation of an old building in downtown Hershey

 

Project Allocation

2,000,000

(iii)  Harrisburg Land Bank

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for rehabilitation and development along Paxton Creek

 

Project Allocation

5,000,000

(iii.1)  City of Harrisburg

 

(A)  Acquisition and redevelopment costs for a commercial site at the corner of Green and Maclay Streets for the adaptive reuse of a new commercial and retail facility

 

Project Allocation

2,000,000

(iii.2)  Hummelstown Borough

 

(A)  Acquisition, site preparation, renovation, construction, infrastructure, parking and other related costs associated with a redevelopment project

 

Project Allocation

2,500,000

(iv)  Lower Paxton Township

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for a beverage production/processing facility and venue

 

Project Allocation

2,500,000

(v)  Lower Swatara Township

 

(A)  Renovation and other related costs to revitalize six of Lower Swatara Township's playgrounds by updating current play equipment, adding ADA-compliant playground equipment and updating walkways to facilitate the use of wheelchairs

 

Project Allocation

500,000

(vi)  Swatara Township

 

(A)  Acquisition, construction, redevelopment, renovation and other related costs associated with infrastructure investments, connectivity improvements, blight mitigation, business relocation and site remediation and redevelopment

 

Project Allocation

2,000,000

(vii)  West Hanover Township

 

(A)  Acquisition, site preparation, infrastructure, construction, redevelopment, renovation, abatement of hazardous materials and other related costs for construction of a municipal complex facility

 

Project Allocation

5,000,000

(23)  Delaware County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Delaware County Hub Facility project

 

Project Allocation

1,000,000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(ii)  Delaware County Redevelopment Authority

 

(A)  Construction, infrastructure, rehabilitation and other costs for Riddle Hospital in Middletown Township

 

Project Allocation

10,000,000

(iii)  City of Chester

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the creation of integrated, community-based housing for people with disabilities

 

Project Allocation

3,000,000

(iii.1)  Aldan Borough

 

(A)  Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the expansion and redevelopment of police and municipal buildings

 

Project Allocation

1,250,000

(iv)  Glenolden Borough

 

(A)  Acquisition, construction and other related costs for recreational fields, maintenance facility and walking trails

 

Project Allocation

500,000

(v)  Morton Borough

 

(A)  Construction, renovation and other related costs for improvements to municipal building, including police station, borough offices and community facilities

 

Project Allocation

500,000

(vi)  Norwood Borough

 

(A)  Construction and other related costs for new firehouse

 

Project Allocation

500,000

(vii)  Prospect Park Borough

 

(A)  Construction, redevelopment, rehabilitation and other related costs to revitalize a blighted business and civic district

 

Project Allocation

800,000

(B)  Construction, rehabilitation, site preparation, infrastructure, upgrades, renovation and other related costs for the improvement and redevelopment of Interboro School District

 

Project Allocation

20,000,000

(viii)  Ridley Park Borough

 

(A)  Infrastructure improvements, construction, relocation, renovation and other related costs for Taylor Hospital

 

Project Allocation

4,000,000

(ix)  Yeadon Borough

 

(A)  Construction, renovation and rehabilitation of the property to expand, update and add new updates to the Nile Swim Club

 

Project Allocation

1,000,000

(ix.1)  Aston Township

 

(A)  Renovations, rehabilitation, site preparation, construction and other related costs for the development of a hockey rink at Neumann University

 

Project Allocation

10,000,000

(x)  Concord Township

 

(A)  Construction and other related costs for Phase 1B and Phase 2 of the Octoraro Trail

 

Project Allocation

1,000,000

(B)  Acquisition of various parcels within the historic Ivy Mills District and potential Octoraro Trail connections

 

Project Allocation

500,000

(C)  Acquisition, construction, infrastructure and other related costs for the completion of the Garnet Valley Greenway Trail that transects the north and south of the township and connects important public resources

 

Project Allocation

1,500,000

(xi)  Marple Township

 

(A)  Construction, infrastructure and other related costs for new municipal police station and magisterial district court

 

Project Allocation

4,100,000

(B)  Construction, infrastructure, rehabilitation, renovation and other related costs for Marple Township municipal and library building

 

Project Allocation

654,000

(xi.1)  Newtown Township

 

(A)  Design, construction and all associated costs of a new Early Childhood Education Center and Recreational Facility for Garrett Williamson

 

Project Allocation

5,000,000

(xii)  Radnor Township

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to construction, redevelopment and rehabilitation projects to the Villanova University Campus

 

Project Allocation

10,000,000

(B)  Construction, renovation and rehabilitation of capital facilities, including infrastructure on campus of Cabrini College

 

Project Allocation

10,000,000

(C)  Construction, redevelopment and other related costs for projects relating to Creutzburg Center

 

Project Allocation

1,050,000

(D)  Construction, infrastructure and other related costs for project in Fenimore Woods Park

 

Project Allocation

700,000

(E)  Construction, infrastructure, redevelopment and other related costs for projects relating to Radnor Township Building

 

Project Allocation

500,000

(F)  Upgrades and deferred maintenance, Phase VII, for north Wayne flood mitigation

 

Project Allocation

550,000

(G)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the expansion and renovation of Radnor Fire Company's facilities

 

Project Allocation

1,750,000

(H)  Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water management system

 

Project Allocation

5,000,000

(xiii)  Springfield Township

 

(A)  Rehabilitation, renovation, infrastructure and other related costs for improvements to two business districts

 

Project Allocation

1,000,000

(B)  Renovations and other related costs for ADA accessibility requirements and upgrade facilities used for township public safety and emergency operation activities

 

Project Allocation

500,000

(C)  Renovation, infrastructure and other related costs for township parks and recreation projects

 

Project Allocation

1,000,000

(D)  Construction, infrastructure and other related costs for development of full-service hotel facility

 

Project Allocation

3,000,000

(E)  Renovation, infrastructure and other related costs for township building and police station

 

Project Allocation

2,500,000

(xiv)  Tinicum Township

 

(A)  Construction, redevelopment, rehabilitation and other related costs for renovation of Lazaretto Quarantine Station for reuse as Tinicum Township Municipal Building

 

Project Allocation

3,000,000

(xv)  Tinicum Township and City of Philadelphia

 

(A)  Planning, development, construction and other costs associated with cargo expansion at the Philadelphia International Airport and/or the infrastructure improvement projects at the Philadelphia International Airport or the Philadelphia Northeast Airport

 

Project Allocation

30,000,000

(xvi)  Upper Chichester Township

 

(A)  Construction, infrastructure and other related costs for a library and resource center

 

Project Allocation

1,000,000

(xvii)  Upper Darby Township

 

(A)  Construction, renovation, rehabilitation and abatement of hazardous materials relating to a major facility redevelopment project at Delaware County Community College to create a new Southeast campus

 

Project Allocation

33,250,000

(B)  Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project

 

Project Allocation

6,000,000

(C)  Redevelopment, construction, demolition, infrastructure and other related costs for the development of the Upper Darby Community Center

 

Project Allocation

5,000,000

(xviii)  Upper Darby Township and Clifton Heights and Millbourne Boroughs

 

(A)  Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to Upper Darby School District

 

Project Allocation

80,000,000

(xix)  Aldan, Colwyn, Darby, East Lansdowne, Lansdowne and Yeadon Boroughs

 

(A)  Acquisition, development, redevelopment, site work, remediation and project site infrastructure improvements to William Penn School District

 

Project Allocation

60,000,000

(24)  Elk County

 

(i)  (Reserved)

 

(ii)  Bradford Office of Economic and Community Development

 

(A)  Construction, infrastructure and other related costs for a new three-story building in downtown St. Marys, relocation of offices, meeting spaces and treatment program areas

 

Project Allocation

2,100,000

(25)  Erie County

 

(i)  County projects

 

(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(C)  Acquisition, construction, infrastructure improvements and other costs related to the L2S-NMI-ERIE Medical Device Assembly Plant project

 

Project Allocation

500,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for Erie Metropolitan Transit Authority projects

 

Project Allocation

2,500,000

(E)  Acquisition, construction, infrastructure, redevelopment and other related costs for CNG fueling station projects of Erie Metropolitan Transit Authority

 

Project Allocation

2,500,000

(F)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(ii)  Corry Area Industrial Development Corporation

 

(A)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for projects on vacant industrial facilities for one or more manufacturing units

 

Project Allocation

5,000,000

(ii.1)  Economic Development Corporation of Erie County

 

(A)  Infrastructure, construction, redevelopment and other related costs for improvement of former potato chip factory

 

Project Allocation

1,000,000

(ii.2)  The Erie County General Authority

 

(A)  Acquisition, infrastructure, rehabilitation, construction and other related costs for a commercial facility renovation project

 

Project Allocation

20,000,000

(B)  Acquisition, infrastructure, rehabilitation, environmental remediation, construction and other related costs for a brownfield redevelopment project

 

Project Allocation

10,000,000

(C)  Acquisition, infrastructure, rehabilitation, construction and other related costs for a business and industrial park project

 

Project Allocation

20,000,000

(iii)  Erie-Western Pennsylvania Port Authority

 

(A)  Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for existing and proposed waterfront development

 

Project Allocation

30,000,000

(iv)  Erie County Redevelopment Authority

 

(A)  Acquisition, infrastructure, construction, redevelopment, abatement of hazardous materials, renovation, rehabilitation and other related costs for properties to promote development

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, construction, abatement of hazardous materials, renovation, rehabilitation and other related costs for redevelopment of properties within the City of Corry to promote development

 

Project Allocation

5,000,000

(C)  Site acquisition for development, infrastructure and other related costs to create new business parks and space

 

Project Allocation

25,000,000

(D)  Construction, renovations and other related costs for expansion of the physician assistant program at Mercyhurst University in the City of Erie

 

Project Allocation

5,000,000

(v)  Erie Redevelopment Authority

 

(A)  Construction, renovation, rehabilitation and other related costs for upgrades at senior care community

 

Project Allocation

1,500,000

(vi)  Redevelopment Authority in the City of Corry

 

(A)  Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for upgrades to multitenant manufacturing facilities

 

Project Allocation

7,500,000

(vi.1)  The Pennsylvania State University

 

(A)  Construction, infrastructure, equipment and other related costs for education and research facilities at Knowledge Park at Penn State Behrend

 

Project Allocation

15,000,000

(vii)  Borough of Union City

 

(A)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for improvements and restoration to previous industrial sites

 

Project Allocation

500,000

(B)  Acquisition, infrastructure, construction and other related costs for the development of a trail system

 

Project Allocation

500,000

(viii)  City of Erie

 

(A)  Infrastructure, construction and other related costs for public space improvements

 

Project Allocation

5,000,000

(B)  Infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for improvements to firehouses and police stations and creation of a joint public safety facility

 

Project Allocation

15,000,000

(C)  Acquisition, infrastructure, construction, redevelopment, renovation, rehabilitation and other related costs for development of sports complexes

 

Project Allocation

10,000,000

(D)  Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for the development of sports complexes

 

Project Allocation

15,000,000

(E)  Acquisition, infrastructure, rehabilitation, construction and other related property improvement costs for building projects

 

Project Allocation

25,000,000

(F)  Acquisition, renovation, remediation and redevelopment of brownfield sites for new and expanding companies

 

Project Allocation

10,000,000

(G)  Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of commercial and industrial corridors

 

Project Allocation

20,000,000

(H)  Construction, renovation and other costs related to the redevelopment of exhibits, buildings, pathways, parking areas and other facilities and projects at Erie Zoo

 

Project Allocation

5,000,000

(I)  Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for redevelopment of a business or industrial park

 

Project Allocation

5,000,000

(J)  Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for historic preservation and cultural asset improvements

 

Project Allocation

5,000,000

(K)  Acquisition, infrastructure, improvements, redevelopment, construction, site development and other related costs for an economic development project

 

Project Allocation

5,000,000

(L)  Site preparation, abatement, acquisition, construction, expansion, demolition, rehabilitation, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

25,000,000

(M)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for an expansion project at Mercyhurst University

 

Project Allocation

5,000,000

(26)  Fayette County

 

(i)  County projects

 

(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(ii)  Fay-Penn Economic Development Council

 

(A)  Acquisition, infrastructure, construction and other related costs for countywide economic development

 

Project Allocation

25,000,000

(iii)  Dunbar Borough

 

(A)  Acquisition, infrastructure, construction and other related costs for the expansion of a facility to accommodate growing trucking fleet operations

 

Project Allocation

2,000,000

(iv)  South Union Township

 

(A)  Engineering, construction, renovation and other related costs for the Uniontown Area YMCA

 

Project Allocation

7,500,000

(27)  Forest County

 

(i)  (Reserved)

 

(28)  Franklin County

 

(i)  County projects

 

(A)  Construction, infrastructure, redevelopment and other improvements to the Wilson College campus

 

Project Allocation

20,000,000

(ii)  Franklin County Redevelopment Authority

 

(A)  Acquisition, site preparation, renovation, rehabilitation, infrastructure, construction and other related costs for development of Phase II of Herbruck's Poultry Ranch and Blue Springs Egg Farm expansion

 

Project Allocation

5,000,000

(B)  Acquisition, site preparation, renovation, rehabilitation, construction, infrastructure and other related costs for development of a pullet site to support Herbruck's Poultry Ranch and Blue Springs Egg Farm

 

Project Allocation

5,000,000

(C)  Acquisition, site preparation, remediation, infrastructure, renovation, construction and other related costs associated with a new facility to house the Cumberland Valley School of Music

 

Project Allocation

750,000

(29)  Fulton County

 

(i)  (Reserved)

 

(30)  Greene County

 

(i)  County projects

 

(A)  Acquisition, redevelopment, infrastructure, construction and other related costs for a Center for Economic Development facility and resources to build research, workforce readiness, social wellness, vocational and career development, and support educational initiatives, including early childhood education

 

Project Allocation

5,000,000

(B)  Acquisition, construction, site preparation, infrastructure and other related costs for community and economic development projects in the county

 

Project Allocation

30,000,000

(C)  Acquisition, construction, redevelopment, infrastructure and other related costs for a center for economic development at Waynesburg University

 

Project Allocation

5,000,000

(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(E)  Construction, infrastructure, land acquisition and other related costs to upgrade East Dunkard Water Authority's water treatment plant and distribution system

 

Project Allocation

8,000,000

(F)  Acquisition, infrastructure, construction and other related costs for an economic development project

 

Project Allocation

7,500,000

(i.1)  Franklin Township

 

(A)  Acquisition, construction, infrastructure and other related costs for Waynesburg Crossings economic development project

 

Project Allocation

2,000,000

(B)  Acquisition, construction, infrastructure and other related costs for Franklin Township Business Park project

 

Project Allocation

5,000,000

(ii)  Perry Township

 

(A)  Renovation and construction of the township building

 

Project Allocation

1,000,000

(31)  Huntingdon County

 

(i)  County projects

 

(A)  Acquisition, renovation, redevelopment, infrastructure, abatement of hazardous materials, construction and other related costs for expansion of Health and Wellness facilities of the Broad Top Area Medical Center, Inc.

 

Project Allocation

7,000,000

(32)  Indiana County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for Phase II rehabilitation of the Indiana County Education and Technology Center

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational facilities and county fairground buildings at Mack Park

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, construction, renovation, abatement of hazardous materials and other related costs for capital projects, including recreational and aquatic facilities at the YMCA of Indiana County

 

Project Allocation

5,000,000

(D)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or redevelopment and blight remediation

 

Project Allocation

8,000,000

(E)  Acquisition, rehabilitation, infrastructure, construction and other related costs for business park site improvements and multitenant building development at Windy Ridge Business & Technology Park - Phases 3 through 5

 

Project Allocation

10,000,000

(F)  Acquisition, rehabilitation, infrastructure improvements, construction and other related costs for expansion of community health care services and educational and training partnerships through the Indiana Regional Medical Center

 

Project Allocation

15,000,000

(G)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development in the county

 

Project Allocation

75,000,000

(H)  Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs associated with development of clean coal technology

 

Project Allocation

10,000,000

(I)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects

 

Project Allocation

10,000,000

(J)  Construction, infrastructure and other related costs for an Innovation and Entrepreneurship Center

 

Project Allocation

5,000,000

(K)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and preservation of historic, cultural and civic facilities and sites

 

Project Allocation

8,000,000

(L)  Construction, infrastructure and other related costs for countywide broadband fiber and wireless communications projects

 

Project Allocation

9,000,000

(M)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in Burrell Township

 

Project Allocation

15,000,000

(N)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects in West Wheatfield Township and East Wheatfield Township

 

Project Allocation

50,000,000

(O)  Acquisition, rehabilitation, infrastructure, construction and related development costs for improvements at the Indiana County - Jimmy Stewart Airport

 

Project Allocation

7,000,000

(P)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for the advancement and development of the Allegheny Arboretum at Indiana University of Pennsylvania's Confluence Discovery Park

 

Project Allocation

10,000,000

(Q)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(R)  Construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development and all other related costs for the development of a facility or facilities for the Indiana Regional Medical Center

 

Project Allocation

10,000,000

(ii)  Homer City Borough

 

(A)  Acquisition, rehabilitation, infrastructure improvements, construction and related costs for economic development projects, including development of a connecting trail between proposed economic development site and existing county-owned regional trail network to new rail trail spur

 

Project Allocation

1,500,000

(33)  Jefferson County

 

(i)  (Reserved)

 

(34)  Juniata County

 

(i)  County projects

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for an economic development project in Fayette Township

 

Project Allocation

2,000,000

(ii)  Juniata County Industrial Development Authority

 

(A)  Development of natural gas infrastructure in the Juniata County Industrial Park, including construction, remediation, landscaping and other related costs for future expansion in the park

 

Project Allocation

1,000,000

(B)  Development of Phase V of the Juniata County Industrial Park, including grading, landscaping, construction of an access road, utilities, storm water management and all ancillary construction for pad-ready lots

 

Project Allocation

5,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for the development of natural gas infrastructure, including pipeline construction, LNG storage and ancillary construction work

 

Project Allocation

1,000,000

(35)  Lackawanna County

 

(i)  County projects

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to a residential care facility specializing in brain injury care

 

Project Allocation

6,000,000

(B)  Acquisition, construction, renovation, rehabilitation and other costs related to Lackawanna County Park redevelopment and improvement projects

 

Project Allocation

5,000,000

(C)  Acquisition, construction, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other costs related to an economic project

 

Project Allocation

20,000,000

(D)  Infrastructure, improvements and acquisition for a sustainable energy project

 

Project Allocation

10,000,000

(E)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the reconstruction and/or restoration of Valley View School District pool

 

Project Allocation

1,500,000

(F)  Construction, infrastructure and other costs relating to an indoor athletic field and training facility

 

Project Allocation

10,000,000

(G)  Construction, infrastructure and other costs related to the Valley View Business Park new building project

 

Project Allocation

2,000,000

(H)  Construction, infrastructure and other costs related to the Valley View Business Park Industrial Facility

 

Project Allocation

5,000,000

(I)  Acquisition, construction, infrastructure and other costs related to recreational facilities and housing projects for Keystone College

 

Project Allocation

3,500,000

(J)  Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility in or around Dickson City

 

Project Allocation

10,000,000

(K)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(L)  Acquisition, construction, redevelopment, infrastructure and other related costs for new fields and facilities and improvements to existing fields and facilities at Hillside Park

 

Project Allocation

10,000,000

(M)  Acquisition, construction, redevelopment, infrastructure and other related costs for new facilities and expansion of existing facilities of Abington Heights School District

 

Project Allocation

10,000,000

(N)  Acquisition, construction, redevelopment, infrastructure and other related costs for expansion of a sports facility within the Abington Heights School District

 

Project Allocation

5,000,000

(O)  Acquisition, construction, redevelopment, infrastructure and other related costs for consolidation, modernization and facility upgrades within the Abington Heights School District

 

Project Allocation

10,000,000

(P)  Acquisition, construction, infrastructure and other related costs for Valley View Business Park Industrial Facility

 

Project Allocation

5,000,000

(Q)  Acquisition, construction, renovations, infrastructure and other related costs for dental, medical, health sciences and patient care facilities project

 

Project Allocation

20,000,000

(ii)  City of Scranton

 

(A)  Acquisition, construction, infrastructure, renovation, rehabilitation and other costs related to the relocation, renovation and/or expansion of buildings in the downtown business district

 

Project Allocation

4,000,000

(B)  Design, construction, infrastructure improvements, renovation and other costs related to a health-related clinical and academic community outreach facility at the University of Scranton

 

Project Allocation

10,000,000

(C)  Design, construction, infrastructure improvements, renovation and other costs related to a University of Scranton housing project

 

Project Allocation

15,000,000

(D)  Construction, infrastructure, acquisition, renovation, rehabilitation and other costs related to the site, replacement of specialized canopy and parking expansion of the Pavilion at Montage Mountain

 

Project Allocation

5,000,000

(E)  Construction, infrastructure, renovation, demolition and other costs related to the Scranton Enterprise Center renovation project

 

Project Allocation

1,000,000

(F)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of the Green Ridge neighborhood

 

Project Allocation

2,000,000

(G)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the economic development project revitalizing riverfront property along the Lackawanna River

 

Project Allocation

10,000,000

(H)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to renovations associated with the passenger rail station and modifications to the multimodal center

 

Project Allocation

10,000,000

(I)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of West Linden Street

 

Project Allocation

5,000,000

(J)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a redevelopment project in the West Side

 

Project Allocation

2,500,000

(K)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project along North South Road

 

Project Allocation

5,000,000

(L)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in the central business district

 

Project Allocation

2,500,000

(M)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to economic development associated with the Neighborhood Commercial District revitalization project

 

Project Allocation

5,000,000

(N)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project in South Scranton

 

Project Allocation

2,500,000

(O)  Acquisition, construction, infrastructure, renovation and other related costs for a health care facility

 

Project Allocation

10,000,000

(P)  Acquisition, construction, infrastructure, renovation and other related costs for a school of dentistry

 

Project Allocation

10,000,000

(Q)  Acquisition, construction, infrastructure, renovation and other related costs for a school of osteopathic medicine

 

Project Allocation

10,000,000

(R)  Acquisition, construction, infrastructure, renovation and other related costs for business and residential development in West Scranton

 

Project Allocation

3,000,000

(S)  Acquisition, construction, infrastructure, renovation and other related costs for business development in the downtown area

 

Project Allocation

4,000,000

(T)  Acquisition, construction, infrastructure, renovation and other related costs for business development project

 

Project Allocation

4,000,000

(U)  Acquisition, remediation and other related costs for a former, underutilized manufacturing facility

 

Project Allocation

5,000,000

(V)  Improvements, construction and other related costs for Downtown Scranton infrastructure improvements

 

Project Allocation

3,000,000

(W)  Construction, infrastructure and other related costs for streetscape project

 

Project Allocation

3,000,000

(X)  Acquisition, remediation and other related costs for vacant properties within the city to expand an existing business park

 

Project Allocation

5,000,000

(Y)  Construction, rehabilitation,  infrastructure, site preparation and other related costs for improvements to parks, trails and recreation facilities

 

Project Allocation

5,000,000

(Z)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the development of a community center

 

Project Allocation

5,000,000

(iii)  Archbald Borough

 

(A)  Construction, infrastructure and other costs relating to the Archbald Business Park Phase II Redevelopment Project

 

Project Allocation

3,000,000

(B)  Construction, infrastructure and other costs relating to the Archbald Route 6 Facility Redevelopment Project

 

Project Allocation

4,000,000

(C)  Construction, infrastructure and other costs related to the Valley View Business Park redevelopment project

 

Project Allocation

2,500,000

(D)  Acquisition, construction, infrastructure and other related costs for an economic development project in the borough

 

Project Allocation

5,000,000

(iii.1)  Dunmore Borough

 

(A)  Acquisition, construction, infrastructure and other related costs for an economic development project in the borough

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovations and other related costs for the redevelopment of land along the highway system

 

Project Allocation

5,000,000

(iii.2)  Jermyn Borough

 

(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects

 

Project Allocation

5,000,000

(iv)  Jessup Borough

 

(A)  Construction, infrastructure, renovations and other costs related to a new building at the Jessup Small Business Center

 

Project Allocation

2,000,000

(B)  Acquisition, construction, infrastructure, renovation and other costs related to the Valley View Business Park Interchange Project

 

Project Allocation

10,000,000

(v)  Moosic Borough

 

(A)  Acquisition, construction, infrastructure, renovations and other costs related to a new building at the Glenmaura Corporate Center

 

Project Allocation

2,000,000

(B)  Construction, infrastructure improvements and other costs related to a redevelopment project at the Office Park at Montage Mountain

 

Project Allocation

4,000,000

(v.1)  Moscow Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for senior housing development

 

Project Allocation

4,000,000

(v.2)  Vandling Borough

 

(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects

 

Project Allocation

5,000,000

(vi)  Carbondale Township

 

(A)  Construction, infrastructure and other costs relating to the Carbondale Technology Transfer Center Multitenant Flex Project

 

Project Allocation

1,000,000

(vii)  Covington Township

 

(A)  Construction, infrastructure improvements and other costs for the Moffat Estate redevelopment project

 

Project Allocation

500,000

(viii)  Fell Township

 

(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects

 

Project Allocation

5,000,000

(viii.1)  Greenfield Township

 

(A)  Construction, infrastructure, acquisition, renovation and other related costs for a facility advancing pet therapy in the township

 

Project Allocation

2,000,000

(ix)  Glenburn Township

 

(A)  Acquisition, construction, redevelopment, infrastructure and other related costs for municipal buildings

 

Project Allocation

2,000,000

(x)  Jefferson Township

 

(A)  Construction, infrastructure and other costs related to the development of a commercial site and to provide sanitary sewer infrastructure for projects

 

Project Allocation

1,000,000

(B)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historic or civic projects

 

Project Allocation

5,000,000

(xi)  Newton Township

 

(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects

 

Project Allocation

5,000,000

(xii)  Ransom Township

 

(A)  Acquisition, construction, renovation, redevelopment, demolition, site preparation, environmental remediation, infrastructure and other related costs for economic, cultural, historical or civic projects

 

Project Allocation

5,000,000

(xiii)  Scott Township

 

(A)  Construction, infrastructure improvements, renovations and other costs related to the Scott Township Technology and Industrial Facility redevelopment project

 

Project Allocation

3,000,000

(36)  Lancaster County

 

(i)  County projects

 

(A)  Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for the development of the PA Agriculture Discovery Center

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, site preparation and other related costs for a state-of-the-art Lancaster Environmental Center of Excellence facility

 

Project Allocation

10,000,000

(C)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

20,000,000

(D)  Construction and other related costs for DiaVac R&D Center and Manufacturing Facility for Diagnostic Biotechnology

 

Project Allocation

10,000,000

(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for a medical education building

 

Project Allocation

20,000,000

(ii)  Lancaster County Redevelopment Authority

 

(A)  Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development projects in the county

 

Project Allocation

15,000,000

(B)  Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for economic development of an agriculture education facility that supports manufacturing and demonstration projects

 

Project Allocation

12,500,000

(C)  Acquisition, redevelopment, renovation, construction, infrastructure and other related costs for Lancaster Life Sciences Incubator

 

Project Allocation

10,000,000

(D)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for emergency medical services program

 

Project Allocation

5,000,000

(E)  Acquisition, redevelopment, renovation, construction, infrastructure, equipment and other related costs for modernization and expansion of the Schreiber Center for Pediatric Development

 

Project Allocation

4,000,000

(F)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for the development of the Brookside Medical Campus

 

Project Allocation

4,000,000

(G)  Construction, infrastructure and other related costs for the Centro Hispano Community Center

 

Project Allocation

500,000

(H)  Acquisition, construction, redevelopment and other related costs for the establishment of an aluminum extrusion facility in the county

 

Project Allocation

3,500,000

(I)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

10,000,000

(J)  Acquisition, construction, infrastructure, abatement of hazardous materials, renovation and other related costs for community and economic development projects for an entity to provide a fitness-based mentoring program that focuses on long-term support for at-risk teens that have experienced childhood trauma, have behavioral challenges and are struggling academically

 

Project Allocation

500,000

(ii.1)  Redevelopment Authority of the County of Lancaster

 

(A)  Acquisition, construction, infrastructure, site preparation, architectural and design and other related costs for development of Landis Place on Doe Run in Penn Township

 

Project Allocation

5,000,000

(iii)  City of Lancaster

 

(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for Lancaster Stockyards Surgical Center

 

Project Allocation

10,000,000

(B)  Construction and other related costs for improvements to the Centro Hispano Community Center

 

Project Allocation

500,000

(C)  Acquisition, construction, infrastructure, redevelopment and other related costs for North Prince Street redevelopment project

 

Project Allocation

8,000,000

(D)  Construction, infrastructure, redevelopment and other related costs for green infrastructure initiative

 

Project Allocation

12,000,000

(E)  Acquisition, design, infrastructure, construction and other related costs for a medical education building for Lancaster General College of Nursing and Applied Sciences

 

Project Allocation

22,000,000

(F)  Construction, infrastructure, acquisition, redevelopment and other related costs for multimodal safety improvements

 

Project Allocation

2,000,000

(G)  Acquisition, demolition, construction, infrastructure, site development and other related costs for public parks, recreation and open space

 

Project Allocation

5,000,000

(H)  Construction, infrastructure, acquisition, redevelopment, site development and other related costs to upgrade and improve facilities

 

Project Allocation

5,000,000

(I)  Acquisition, demolition, construction, infrastructure, development and other related costs for public works operations

 

Project Allocation

4,000,000

(J)  Construction, infrastructure, site preparation and other related costs for the development of a facility for environmental organizations in Lancaster County

 

Project Allocation

10,000,000

(K)  Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northeastern area of Lancaster

 

Project Allocation

5,000,000

(L)  Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the northwestern area of Lancaster

 

Project Allocation

5,000,000

(M)  Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southwestern area of Lancaster

 

Project Allocation

5,000,000

(N)  Acquisition, construction, infrastructure, redevelopment and other related costs for revitalization initiatives in the southeastern area of Lancaster

 

Project Allocation

5,000,000

(iv)  Columbia Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for a parking facility in the downtown to support existing businesses and attract new businesses

 

Project Allocation

1,500,000

(B)  Construction, infrastructure, abatement of hazardous materials and other related costs for the development of an innovation and technology campus on the property of the former McGinness Airport

 

Project Allocation

3,000,000

(C)  Acquisition, renovation, construction and associated costs for improvements at the National Watch and Clock Museum

 

Project Allocation

2,500,000

(D)  Construction, infrastructure and other related costs for the development of a regional recreation facility

 

Project Allocation

2,750,000

(v)  Bart Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(vi)  East Cocalico Township

 

(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements

 

Project Allocation

15,000,000

(vii)  Lititz Regional Community Development Corporation

 

(A)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for Live Event Museum

 

Project Allocation

20,000,000

(B)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Warwick Township

 

Project Allocation

15,000,000

(C)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Warwick Township

 

Project Allocation

15,000,000

(D)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project for Elizabeth Township

 

Project Allocation

15,000,000

(E)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Elizabeth Township

 

Project Allocation

15,000,000

(F)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project in Lititz Borough

 

Project Allocation

15,000,000

(G)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for community asset project in Lititz Borough

 

Project Allocation

15,000,000

(viii)  Elizabethtown Borough

 

(A)  Construction, infrastructure, renovation, rehabilitation and other related costs for the demolition of an existing building and the construction of a new fire station that will also house the Regional Emergency Management Agency

 

Project Allocation

4,000,000

(B)  Construction, renovation and other related costs to build new or renovate space designed to support health-related majors

 

Project Allocation

2,500,000

(C)  Construction, renovation and other related costs to renovate or create space to house a Health Services Center designed to support the physical and mental health needs of Elizabethtown College students and the community

 

Project Allocation

750,000

(D)  Acquisition, construction, redevelopment, renovation and other related costs to create new and extend existing walking, living and learning pathways and fitness trail designed to tie Elizabethtown Borough and Mt. Joy Township paths to campus pathways

 

Project Allocation

1,500,000

(E)  Construction, redevelopment, renovation and other related costs to expand connection to downtown Elizabethtown by renovating space for college-sponsored or small business locations as part of a mixed-use space on College Avenue and/or Market Street

 

Project Allocation

500,000

(F)  Acquisition, construction, redevelopment, renovation and other related costs to create living and learning space for graduate students

 

Project Allocation

1,500,000

(G)  Site development, infrastructure improvements, construction and renovation of space related to academic programs and/or residence halls at Elizabethtown College

 

Project Allocation

2,500,000

(H)  Renovation of Elizabethtown College's Thompson Gymnasium or creation, renovation, construction of other health and fitness facilities on campus designed to enhance student intramural opportunities and expand community programs

 

Project Allocation

3,000,000

(I)  Acquisition, construction, redevelopment, renovation and other related costs to renovate existing space into a boutique hotel or space that will provide short-term housing for business leaders in downtown Elizabethtown

 

Project Allocation

2,500,000

(J)  Construction, infrastructure, redevelopment, renovation and other related costs to transform a historically significant building into a Downtown Cultural and Welcome Center and improvements to public parking facilities

 

Project Allocation

1,500,000

(K)  Partial demolition, construction, infrastructure, redevelopment and other related costs for the renovation of the former Borough Public Works facility to develop operations and training space for the Elizabethtown Police Department and emergency management operations as well as meeting space for community organizations

 

Project Allocation

743,000

(L)  Construction, infrastructure, redevelopment and other related costs for the renovation of the existing police and government facility on Hanover Street to allow for reconfiguration of operational space for the Elizabethtown Police Department as well as safety and accessibility improvements for borough administration offices

 

Project Allocation

633,000

(viii.1)  Ephrata Borough

 

(A)  Construction, renovation, infrastructure and other related costs for renovating and rehabilitating a retired Pennsylvania State Police barracks, located in Ephrata Township and owned by Ephrata Borough, into a multiuse training facility and construction of an exterior training yard

 

Project Allocation

1,000,000

(viii.2)  Manheim Borough

 

(A)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project

 

Project Allocation

15,000,000

(B)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for a community asset project

 

Project Allocation

15,000,000

(ix)  Millersville Borough

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(x)  Mount Joy Borough

 

(A)  Acquisition, redevelopment, construction, infrastructure, renovation and other related costs for expansion project at the Janus School

 

Project Allocation

3,000,000

(B)  Construction, redevelopment and other related costs for sidewalk connections and handicapped accessible ramps adjacent to three borough-owned public parks, completing public trail connections within these parks, creating a public parking lot and associated storm water, grading and restoration, raised pedestrian crosswalks and installation of pedestrian-activated Rectangular Rapid Flashing Beacons

 

Project Allocation

500,000

(C)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xi)  New Holland Borough

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xii)  Quarryville Borough

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xiii)  Colerain Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xiv)  Drumore Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xv)  Earl Township

 

(A)  Construction, infrastructure, renovation and other related costs for a new multipurpose municipal building

 

Project Allocation

1,250,000

(B)  Construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for a combined heat and power facility for Garden Spot Village

 

Project Allocation

2,000,000

(xvi)  East Drumore Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xvii)  East Lampeter Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(B)  Permitting, construction, infrastructure, site preparation, various site fixed amenities and other related costs to support economic growth and redevelopment at Greenfield

 

Project Allocation

15,000,000

(xviii)  Eden Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xix)  Fulton Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xx)  Lancaster Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxi)  Leacock Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxii)  Little Britain Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxii.1)  Manheim Township

 

(A)  Construction, abatement of hazardous materials, redevelopment, renovation and other related costs for the expansion of a commercial building, parking lot renovation, green space, sidewalk and storm water management

 

Project Allocation

3,000,000

(B)  Acquisition of land to an existing commercial property, construction, infrastructure, redevelopment and other related costs for a building expansion, parking lot extension and storm water management facilities

 

Project Allocation

2,500,000

(C)  Acquisition and other related costs to purchase a building that will accommodate the growth of Aaron's Acres

 

Project Allocation

1,500,000

(xxiii)  Martic Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure and other related costs for a recreational pedestrian bridge across Route 324 to enable safe passage between the eastern and western portions of the Enola Low Grade Trail

 

Project Allocation

2,000,000

(xxiv)  Mount Joy Township

 

(A)  Acquisition, design, demolition, redevelopment, construction, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for improvements to roadway and utility, including streetscape enhancements for economic development project

 

Project Allocation

15,000,000

(xxv)  Paradise Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxvi)  Penn Township

 

(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure and other related costs for expansion of Pleasant View Communities

 

Project Allocation

5,000,000

(B)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for Fenner Precision's plant expansion project

 

Project Allocation

30,000,000

(xxvii)  Pequea Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxviii)  Providence Township

 

(A)  Acquisition, construction, demolition, redevelopment and other related costs for an economic development project

 

Project Allocation

1,000,000

(xxviii.1)  Rapho Township

 

(A)  Acquisition, design, demolition, construction, infrastructure, abatement of hazardous materials, machinery and equipment, roadway and utility improvements, streetscape enhancements and other related costs for an economic development project

 

Project Allocation

15,000,000

(xxix)  Salisbury Township

 

(A)  Construction, reconstruction, infrastructure, improvements, rehabilitation and other related costs to renovate and expand a facility

 

Project Allocation

5,000,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment, remediation, infrastructure, improvements and other related costs for an economic development project

 

Project Allocation

5,000,000

(xxx)  Strasburg Borough

 

(A)  Renovation, rehabilitation and construction protecting a National Registered Historic District providing for economic development

 

Project Allocation

1,000,000

(37)  Lawrence County

 

(i)  County projects

 

(A)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(B)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(ii)  Lawrence County Economic Development Corporation

 

(A)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an Incubator/Makerspace

 

Project Allocation

7,500,000

(B)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for county agribusinesses

 

Project Allocation

7,500,000

(C)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Mahoning Township

 

Project Allocation

10,000,000

(D)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Neshannock Township

 

Project Allocation

10,000,000

(E)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Beaver Borough

 

Project Allocation

10,000,000

(F)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in New Wilmington Borough

 

Project Allocation

10,000,000

(G)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in North Beaver Township

 

Project Allocation

10,000,000

(H)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Pulaski Township

 

Project Allocation

10,000,000

(I)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Shenango Township

 

Project Allocation

10,000,000

(J)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Taylor Township

 

Project Allocation

10,000,000

(K)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Union Township

 

Project Allocation

10,000,000

(L)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Volant Borough

 

Project Allocation

10,000,000

(M)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wampum Borough

 

Project Allocation

10,000,000

(N)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wayne Township

 

Project Allocation

10,000,000

(O)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Wilmington Township

 

Project Allocation

10,000,000

(P)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Bessemer Borough

 

Project Allocation

10,000,000

(Q)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Little Beaver Township

 

Project Allocation

10,000,000

(R)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in Ellwood City Borough

 

Project Allocation

10,000,000

(S)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the City of New Castle

 

Project Allocation

10,000,000

(T)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for an economic development project in the county

 

Project Allocation

12,500,000

(U)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for expansion of an historical facility in the City of New Castle

 

Project Allocation

13,000,000

(V)  Acquisition, construction, renovation, abatement of hazardous materials, infrastructure and other related costs for a cultural facility project in the county

 

Project Allocation

13,000,000

(W)  Acquisition, construction, infrastructure and other related costs for the Baird Road business park economic development project in Mahoning Township

 

Project Allocation

20,000,000

(iii)  City of New Castle

 

(A)  Acquisition, demolition, infrastructure, rehabilitation and construction of properties in the business district of the city

 

Project Allocation

6,125,000

(38)  Lebanon County

 

(i)  County projects

 

(A)  Site preparation, acquisition, renovation, construction, infrastructure and other related costs for development of the Annville Logistics Park

 

Project Allocation

5,000,000

(B)  Acquisition, site preparation, renovation, redevelopment, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities

 

Project Allocation

5,000,000

(ii)  City of Lebanon

 

(A)  Acquisition, infrastructure, abatement of hazardous materials, construction and other related costs for urban revitalization, including façade improvements in the commercial corridors of 9th and Lehman Streets

 

Project Allocation

10,000,000

(39)  Lehigh County

 

(i)  County projects

 

(A)  Construction, infrastructure redevelopment and other related costs for restoration and repair of the Scottish Rite Cathedral in the City of Allentown

 

Project Allocation

1,000,000

(B)  Construction, renovation, acquisition and other related costs for an early childhood education center in the City of Allentown

 

Project Allocation

12,000,000

(C)  Acquisition, construction, infrastructure improvements and other related costs for the D&L Trail

 

Project Allocation

10,000,000

(D)  Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the county

 

Project Allocation

15,000,000

(E)  Acquisition, construction, infrastructure, renovation and other related costs for an economic development project in the City of Allentown

 

Project Allocation

15,000,000

(F)  Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties

 

Project Allocation

10,000,000

(G)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project

 

Project Allocation

30,000,000

(H)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for community homes by Keystone Human Services to support persons with intellectual disabilities

 

Project Allocation

10,000,000

(I)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for a Lehigh Valley Health Network facility in the City of Allentown

 

Project Allocation

10,000,000

(J)  Construction, infrastructure, redevelopment and other related costs for infrastructure improvements, additional space and renovations at St. Luke's West End Medical Center in South Whitehall Township

 

Project Allocation

5,000,000

(K)  Acquisition, construction, renovation, abatement of hazardous materials and other related costs for a Lehigh Valley Health Network health center

 

Project Allocation

12,500,000

(L)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network

 

Project Allocation

12,500,000

(M)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(i.1)  Allentown Housing Authority

 

(A)  Acquisition, construction, infrastructure and other related costs for the development or redevelopment of affordable housing in the City of Allentown

 

Project Allocation

4,000,000

(i.2)  Lehigh Northampton Airport Authority

 

(A)  Construction, infrastructure development, redevelopment and other related costs for a new hotel and retail development at Lehigh Valley International Airport

 

Project Allocation

15,000,000

(i.3)  Whitehall Township Industrial and Commercial Development Authority

 

(A)  Site work, construction, preparation, infrastructure, renovation and other related costs for the redevelopment of the Whitehall Mall

 

Project Allocation

2,300,000

(ii)  City of Allentown

 

(A)  Construction infrastructure improvements and other related costs for renovation and rehabilitation of a former convent located on Hanover Avenue

 

Project Allocation

500,000

(B)  Construction infrastructure improvements and other related costs for interior and exterior upgrades to the Agri-Plex building

 

Project Allocation

500,000

(C)  Construction, acquisition and other costs related to the purchase and renovation of the Madison Hamilton building

 

Project Allocation

500,000

(D)  Acquisition, construction, rehabilitation, infrastructure and other related costs for the Community Bike Works youth center facilities

 

Project Allocation

1,000,000

(E)  Renovation, construction, building acquisition and equipment purchases for Lehigh Valley Hospital - 17th and Chew extended campus, including medical office buildings, the School of Nursing and legal office buildings

 

Project Allocation

10,000,000

(F)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for rehabilitation of a theater

 

Project Allocation

2,500,000

(G)  Acquisition, construction, renovation, infrastructure and other related costs for Da Vinci Science Center

 

Project Allocation

2,500,000

(H)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties

 

Project Allocation

21,000,000

(I)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project

 

Project Allocation

35,000,000

(J)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for sports medicine, rehabilitation and health care facilities

 

Project Allocation

5,000,000

(K)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for St. Luke's University Health Network

 

Project Allocation

7,500,000

(L)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a historic structure in the west end theater district

 

Project Allocation

2,000,000

(M)  Construction, renovation, infrastructure and other related costs for civic, cultural or economic development projects for Phoebe Ministries

 

Project Allocation

5,000,000

(N)  Acquisition, construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for a food manufacturing and distribution center

 

Project Allocation

1,500,000

(O)  Construction, rehabilitation, infrastructure, utilities and infrastructure relocation and other related costs for a pharmaceutical and vaccine manufacturing and storage facility

 

Project Allocation

5,300,000

(P)  Acquisition, construction, rehabilitation, infrastructure and other related costs for the development or redevelopment of affordable housing in the Franklin Park neighborhood

 

Project Allocation

2,000,000

(Q)  Construction, rehabilitation, infrastructure, site preparation, environmental remediation and other related costs for an economic development project along Mack Boulevard

 

Project Allocation

1,500,000

(R)  Construction, rehabilitation, infrastructure and other related costs for the rehabilitation of Miller Symphony Hall

 

Project Allocation

2,500,000

(S)  Acquisition, construction, rehabilitation, infrastructure and other related costs for an early childhood facility and neighborhood resource center

 

Project Allocation

10,000,000

(T)  Acquisition, construction, rehabilitation, infrastructure and other related costs for an early education center and a community center in Old Allentown

 

Project Allocation

2,500,000

(U)  Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of athletic facilities at Cedar Crest College

 

Project Allocation

1,500,000

(V)  Construction, infrastructure, improvements, renovation and other related costs for the development and expansion of academic buildings at Cedar Crest College

 

Project Allocation

5,500,000

(W)  Construction, renovation and other related costs for rehabilitation of Sacred Heart Hospital

 

Project Allocation

5,000,000

(X)  Land acquisition, infrastructure improvements, construction and other costs related to Little Lehigh Creek Industrial Corridor redevelopment project

 

Project Allocation

2,000,000

(iii)  City of Bethlehem

 

(A)  Acquisition, construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the development, expansion or renovation of Lehigh Valley Health Network properties

 

Project Allocation

10,000,000

(iii.1)  Catasauqua Borough

 

(A)  Construction, infrastructure improvements and other costs related to the mixed-use Catasauqua redevelopment project

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials and other related costs for a redevelopment project

 

Project Allocation

5,000,000

(iv)  Fountain Hill Borough

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to the renovation and expansion of current facilities and operations of St. Luke's Bethlehem

 

Project Allocation

10,000,000

(B)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Fountain Hill Elementary School

 

Project Allocation

11,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for Mill 2 projects

 

Project Allocation

2,000,000

(v)  North Whitehall Township

 

(A)  Construction, facility improvements, renovations and other related costs for KidsPeace Orchard Hills campus

 

Project Allocation

2,000,000

(B)  Acquisition, construction, redevelopment, infrastructure and other related costs for a youth camp

 

Project Allocation

2,500,000

(vi)  Salisbury Township

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the renovation and expansion of Lehigh Valley Hospital - Cedar Crest Campus, including, but not limited to, the hospital, MOBs and Lehigh Valley Reilley Children's Hospital

 

Project Allocation

10,000,000

(vi.1)  South Whitehall Township

 

(A)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for redevelopment of underutilized properties

 

Project Allocation

3,000,000

(B)  Acquisition, construction, renovations, abatement of hazardous materials, infrastructure and other related costs for a multistory adaptive reuse project

 

Project Allocation

5,000,000

(C)  Construction, renovations, abatement of hazardous materials, infrastructure and other related costs for improvements to and an expansion of a fire and rescue department facility

 

Project Allocation

1,000,000

(vii)  Upper Macungie Township

 

(A)  Construction, redevelopment, infrastructure and other related costs for a new community center, including indoor sports and recreation areas, meeting space, a walking track and rental space

 

Project Allocation

10,000,000

(40)  Luzerne County

 

(i)  County projects

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for an economic development project

 

Project Allocation

10,000,000

(B)  Construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with improvements to Kirby Park

 

Project Allocation

5,000,000

(C)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the Hazleton Creek economic development project

 

Project Allocation

5,000,000

(D)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs associated with the expansion of a commercial property located on Route 315 in Plains Township

 

Project Allocation

5,000,000

(E)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements, abatement of hazardous materials and other related costs associated with the construction of a new animal shelter

 

Project Allocation

3,000,000

(F)  Renovation, rehabilitation and other related costs to repair and restore the Luzerne County Courthouse

 

Project Allocation

1,000,000

(G)  Acquisition, construction, infrastructure, redevelopment and other related costs for a sustainable energy project for production of renewable fuels

 

Project Allocation

10,000,000

(H)  Acquisition, construction, renovation, infrastructure and other costs related to economic development projects

 

Project Allocation

15,000,000

(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(J)  Site preparation, acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the improvement of the Greater Wyoming Valley Area YMCA facilities

 

Project Allocation

5,000,000

(K)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, lot stabilization and other related costs for the redevelopment of Upward Farms

 

Project Allocation

20,000,000

(L)  Construction, infrastructure, redevelopment, renovation and other related costs for improvements to the Luzerne County Fairgrounds

 

Project Allocation

5,000,000

(i.1)  Luzerne County Redevelopment Authority

 

(A)  Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project in Forty Fort Borough

 

Project Allocation

10,000,000

(i.2)  Luzerne County Industrial Development Authority

 

(A)  Acquisition, infrastructure, site preparation, construction and other related costs associated with the development of Grimes Industrial Park Lot No. 5

 

Project Allocation

5,500,000

(ii)  City of Hazleton

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, machinery, equipment and other related costs for a Lehigh Valley Health Network facility

 

Project Allocation

10,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(iii)  City of Nanticoke

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with an economic development project

 

Project Allocation

10,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site improvements and other related costs associated with the redevelopment of the LS site project

 

Project Allocation

10,000,000

(C)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project

 

Project Allocation

5,000,000

(iii.1)  City of Pittston

 

(A)  Acquisition, construction, infrastructure and other costs related to Main & Market Professional Center project

 

Project Allocation

2,500,000

(B)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project

 

Project Allocation

5,000,000

(iv)  City of Wilkes-Barre

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with Wilkes University facilities

 

Project Allocation

5,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(C)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs related to the improvement of facilities for the Wilkes-Barre YMCA

 

Project Allocation

2,500,000

(D)  Acquisition, construction, infrastructure and other costs related to the redevelopment of Citizens Bank Center

 

Project Allocation

5,000,000

(E)  Acquisition, construction, infrastructure, redevelopment, renovations and other costs associated with an economic development project

 

Project Allocation

5,000,000

(F)  Acquisition, construction, infrastructure and other related costs for a project at King's College

 

Project Allocation

2,000,000

(iv.1)  Dupont Borough

 

(A)  Acquisition, construction, infrastructure and other costs related to Wilkes-Barre/Scranton International Airport economic development project

 

Project Allocation

2,000,000

(v)  Edwardsville Borough

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with an energy sector economic development project

 

Project Allocation

20,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, site improvements and other related costs associated with a manufacturing or technology incubator project

 

Project Allocation

2,000,000

(vi)  Exeter Borough

 

(A)  Construction, infrastructure and other related costs for an economic development and job creation project

 

Project Allocation

15,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials and other related costs associated with the redevelopment of a commercial property on Wyoming Avenue

 

Project Allocation

5,000,000

(C)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Wyoming Avenue

 

Project Allocation

5,000,000

(vi.1)  Dallas Township

 

(A)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project along Lt. Michael Cleary Drive

 

Project Allocation

5,000,000

(vii)  Greater Wilkes-Barre Industrial Fund

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Jewish Community Center of Northeastern Pennsylvania

 

Project Allocation

10,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure and other related costs for the Wyoming Valley Art League

 

Project Allocation

3,000,000

(viii)  Hanover Township

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for an economic development project

 

Project Allocation

5,000,000

(viii.1)  Jenkins Township

 

(A)  Construction, infrastructure, acquisition, site preparation, environmental remediation and other related costs for the redevelopment, upgrade, relocation and expansion of a facility

 

Project Allocation

6,000,000

(viii.2)  Kingston Borough

 

(A)  Acquisition, infrastructure, construction, redevelopment and other related costs for an economic development project

 

Project Allocation

5,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the redevelopment of property along Wyoming Avenue

 

Project Allocation

5,000,000

(C)  Acquisition, construction, infrastructure, abatement of hazardous materials, redevelopment, renovation and other related costs for the economic redevelopment of land along Market Street

 

Project Allocation

3,000,000

(ix)  Luzerne Borough

 

(A)  Construction, renovation, rehabilitation, infrastructure and other related costs associated with an infrastructure project that includes deploying sound barriers to address recent development

 

Project Allocation

1,500,000

(x)  Newport Township

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with the development of an energy park

 

Project Allocation

20,000,000

(B)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for repurposing SCI Retreat for economic development in the township

 

Project Allocation

10,000,000

(xi)  Plains Township

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(B)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with a multiuse sports complex project

 

Project Allocation

5,000,000

(xii)  Pittston City

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(xiii)  Rice Township

 

(A)  Acquisition, infrastructure, construction and other related costs for a community center in the township

 

Project Allocation

2,000,000

(xiv)  Wilkes-Barre Township

 

(A)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure, abatement of hazardous materials, site preparation and other related costs associated with an economic development project

 

Project Allocation

5,000,000

(41)  Lycoming County

 

(i)  County projects

 

(A)  Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(B)  Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for an open space, trail, tourism and outdoor recreation project in the county

 

Project Allocation

10,000,000

(42)  McKean County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, construction and other related costs for an economic development project

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, construction and other related costs for an energy project

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, construction, renovation and other related costs for projects at UPMC Kane

 

Project Allocation

10,000,000

(ii)  City of Bradford

 

(A)  Renovation, construction and other related costs to modernize, expand and improve facilities of a rehabilitation center for individuals with disabilities

 

Project Allocation

3,000,000

(B)  Acquisition, infrastructure, construction, renovation, rehabilitation and other related costs for projects at Bradford Regional Medical Center

 

Project Allocation

10,000,000

(iii)  Foster Township

 

(A)  Construction, site work, infrastructure improvements, land acquisition and other related costs for an at-risk youth education and treatment facility on the main campus of Beacon Light

 

Project Allocation

7,000,000

(43)  Mercer County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure and abatement of hazardous materials at the former Damascus-Bishop Tube facility in the Reynolds Industrial Park

 

Project Allocation

1,500,000

(B)  Acquisition, construction, infrastructure and other related costs for facilities development

 

Project Allocation

4,400,000

(C)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an industrial facility

 

Project Allocation

2,000,000

(D)  Construction, infrastructure and other related costs for a work force development center to be built

 

Project Allocation

2,225,000

(E)  Acquisition, construction, redevelopment and infrastructure for a new multitenant health care facility

 

Project Allocation

2,000,000

(F)  Construction and/or renovation of a multitenant facility in the Reynolds Industrial Park

 

Project Allocation

1,000,000

(G)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(I)  Acquisition, construction, infrastructure and related improvements for a recreational facilities project

 

Project Allocation

5,000,000

(ii)  Greenville Area Economic Development Corporation

 

(A)  Acquisition, construction, redevelopment, infrastructure and abatement of hazardous materials for the former Trinity Industries site in Hempfield Township

 

Project Allocation

3,000,000

(iii)  Greenville-Reynolds Development Corporation

 

(A)  Construction, infrastructure and other related costs to erect three versatile commercial buildings in industrial parks within the county

 

Project Allocation

2,000,000

(iv)  Penn-Northwest Development Corporation

 

(A)  Construction, renovation and infrastructure costs related to the conversion of the Sacred Heart Church and rectory into a community theater

 

Project Allocation

1,500,000

(B)  Acquisition and renovation of an industrial manufacturing facility known as the Trinity South Plant

 

Project Allocation

1,000,000

(C)  Construction, renovation, infrastructure and related costs for the expansion of the HopeCAT facility

 

Project Allocation

2,500,000

(D)  Construction, renovation and infrastructure for modernization of fire prevention, chemical storage and overall facility upgrades to the Jamestown Coatings plant

 

Project Allocation

1,000,000

(E)  Construction, redevelopment, infrastructure and abatement of hazardous materials for the expansion of NLMK's operation

 

Project Allocation

5,000,000

(F)  Renovation of all or part of four buildings on East State Street and Chestnut Street in the City of Sharon as part of the redevelopment of Shenango Riverfront

 

Project Allocation

2,000,000

(G)  Construction, infrastructure and other related costs for a community wellness center on the Thiel College Campus

 

Project Allocation

5,000,000

(H)  Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Grove City

 

Project Allocation

10,000,000

(I)  Construction, renovation and other related costs for the Grove City YMCA to renovate an unoccupied building

 

Project Allocation

1,000,000

(J)  Construction, acquisition, redevelopment, renovation and infrastructure costs for the Town of Greenville central business district improvements

 

Project Allocation

2,000,000

(v)  Borough of Grove City

 

(A)  Acquisition, construction, infrastructure and other related costs for an industrial facility

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure and other related costs for commercial facilities

 

Project Allocation

1,000,000

(v.1)  City of Farrell

 

(A)  Acquisition, infrastructure, construction and other related costs for an economic development project

 

Project Allocation

2,000,000

(vi)  City of Hermitage

 

(A)  Acquisition, construction and infrastructure improvements for a business park project

 

Project Allocation

3,000,000

(B)  Acquisition, construction, infrastructure and related improvements for a Hermitage community and economic development project

 

Project Allocation

2,500,000

(C)  Acquisition, construction, infrastructure and related improvements for a Hermitage community recreational facilities project

 

Project Allocation

3,000,000

(D)  Acquisition, construction, renovation and infrastructure improvements for an industrial facility

 

Project Allocation

3,500,000

(vii)  City of Sharon

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for the development of the commercial corridor of the city

 

Project Allocation

3,000,000

(B)  Acquisition, construction and redevelopment of the banks of the Shenango River within the city

 

Project Allocation

5,000,000

(C)  Infrastructure, construction and other related costs for the WaterFire Sharon riverbank development

 

Project Allocation

4,000,000

(44)  Mifflin County

 

(i)  County projects

 

(A)  Acquisition, construction, site preparation, infrastructure and other related costs for a community and economic development project in the county

 

Project Allocation

25,000,000

(ii)  Mifflin County Industrial Development Authority

 

(A)  Abatement of hazardous materials, demolition and redevelopment of abandoned building number four located in the MCIDC Plaza

 

Project Allocation

1,000,000

(45)  Monroe County

 

(i)  County projects

 

(A)  Acquisition, construction, renovation, infrastructure and other costs related to economic development projects

 

Project Allocation

10,000,000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(ii)  Monroe County Industrial Development Authority

 

(A)  Construction, infrastructure and other related costs for redevelopment of the Chelsea property

 

Project Allocation

5,000,000

(B)  Construction, infrastructure and other related costs for development of an industrial property on Airstrip Road

 

Project Allocation

5,000,000

(C)  Construction, infrastructure and other related costs for development of a commercial site on Sullivan Trail

 

Project Allocation

3,000,000

(D)  Construction, infrastructure and other related costs for redevelopment of the former Birchwood Resort property

 

Project Allocation

5,000,000

(E)  Construction, infrastructure and other related costs for redevelopment of the site of the former Mount Pocono Golf Course

 

Project Allocation

5,000,000

(F)  Construction, infrastructure and other related costs for redevelopment of an industrial property on North Road

 

Project Allocation

5,000,000

(G)  Construction, infrastructure and other related costs for redevelopment of an industrial property located at 303 Possinger Drive

 

Project Allocation

5,000,000

(H)  Construction, infrastructure and other related costs for redevelopment of property located at 142 Quarry Lane

 

Project Allocation

3,000,000

(I)  Construction, infrastructure and other related costs for development of the Lynch Corporation property

 

Project Allocation

3,000,000

(J)  Construction, infrastructure and other related costs for redevelopment of the former HJ Davis property

 

Project Allocation

3,000,000

(K)  Construction, infrastructure and other related costs for the Monroe Career and Technical Institute (MCTI)

 

Project Allocation

2,000,000

(ii.1)  Pocono Mountains Economic Development Corporation

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for repairs, upgrades and improvements to the existing facilities of the Salvation Army of East Stroudsburg

 

Project Allocation

4,000,000

(iii)  Borough of East Stroudsburg

 

(A)  Construction, infrastructure, renovation and other related costs for improvements to the East Stroudsburg University athletic and academic facilities

 

Project Allocation

10,000,000

(B)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(iii.1)  Stroudsburg Borough

 

(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(iii.2)  Barrett Township

 

(A)  Construction, infrastructure and other related costs to develop a parcel of township-owned land for an administrative and recreation complex

 

Project Allocation

600,000

(iii.3)  Chestnuthill Township

 

(A)  Acquisition, construction, infrastructure and other related costs for a shared emergency services facility

 

Project Allocation

2,500,000

(iii.4)  Coolbaugh Township

 

(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(iii.5)  Paradise Township

 

(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(iv)  Pocono Township

 

(A)  Construction, infrastructure, renovation and other related costs for the Center for Advanced Technology and Sustainability at the Northampton Community College Monroe campus

 

Project Allocation

2,500,000

(v)  Price Township

 

(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(vi)  Stroud Township

 

(A)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

10,000,000

(46)  Montgomery County

 

(i)  County projects

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to construct a multiuse, income-based, affordable housing complex with an emphasis on veterans housing

 

Project Allocation

10,000,000

(B)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to deploy utility scale solar energy or other alternative green energy sources

 

Project Allocation

10,000,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to an economic development project to enable the deployment of a facility that will permit a regionalized, coordinated or countywide delivery of emergency response services

 

Project Allocation

10,000,000

(D)  Acquisition, construction, infrastructure, redevelopment and other related costs for Share Food Program's Montgomery County hub facility project

 

Project Allocation

1,000,000

(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

30,000,000

(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

30,000,000

(G)  Acquisition, infrastructure, construction and other related costs for renovation and expansion of Rosemont College's Cardinal Hall

 

Project Allocation

2,500,000

(H)  Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy training facility

 

Project Allocation

7,000,000

(I)  Construction, infrastructure, renovation, acquisition, redevelopment and other costs related to the development of a child advocacy center

 

Project Allocation

7,000,000

(J)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities to deliver medical services, conduct research, provide medical education and other related activities for Penn Medicine and its affiliates

 

Project Allocation

20,000,000

(K)  Abatement, acquisition, construction, infrastructure and redevelopment assistance, environmental remediation and other related costs for the redevelopment of Elmwood Park Zoo

 

Project Allocation

10,000,000

(L)  Demolition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials and other related costs for improvements to Enfield Elementary School

 

Project Allocation

5,000,000

(M)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(i.1)  Horsham Land Redevelopment Authority

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs to redevelop Naval Air Station Joint Reserve Base Willow Grove in Horsham Township

 

Project Allocation

35,000,000

(i.2)  Montgomery County Redevelopment Authority

 

(A)  Acquisition, site preparation, infrastructure, renovations, construction and other related costs for the development of a railroad trestle plaza and riverfront development in Royersford Borough

 

Project Allocation

5,000,000

(B)  Site preparation, acquisition, renovation, construction, redevelopment and other related costs for the expansion of Merion Hall on Saint Joseph's University campus

 

Project Allocation

7,400,000

(ii)  Pottstown Area Industrial Development, Inc.

 

(A)  Construction, rehabilitation, renovation, rehabilitation and other related costs for the Hard Hat Cherry Street improvement project

 

Project Allocation

500,000

(B)  Construction, infrastructure, equipment and other related costs for the American Keg Company deep draw press project

 

Project Allocation

1,000,000

(C)  Construction, rehabilitation, abatement of hazardous materials and other related costs for renovation, remediation and redevelopment of the former Pottstown Plating Works property

 

Project Allocation

1,250,000

(D)  Construction, redevelopment and other related costs for the Iron Globe Entertainment Complex project

 

Project Allocation

5,000,000

(E)  Infrastructure, redevelopment and other related costs for Pottstown Sustainable Energy Plant

 

Project Allocation

2,000,000

(F)  Acquisition, redevelopment, infrastructure and other related costs for the expansion of production and hiring in Pottstown Borough

 

Project Allocation

1,000,000

(G)  Redevelopment, construction and other related costs for the renovation of an industrial site in Pottstown Borough

 

Project Allocation

5,000,000

(H)  Redevelopment, construction, renovation, remediation and other related costs for the development of a vacant and blighted property in Pottstown Borough

 

Project Allocation

1,250,000

(I)  Infrastructure, construction, renovation and other related costs for the redevelopment of an underutilized building in Pottstown Borough

 

Project Allocation

500,000

(ii.1)  Ambler Borough

 

(A)  Infrastructure, redevelopment, construction and other related costs for parking garage on Lindenwold Avenue

 

Project Allocation

2,000,000

(B)  Infrastructure, redevelopment, construction and other related costs for parking lot, including street safety, mobility and parking improvements, and storm sewer enhancements on Poplar Street

 

Project Allocation

700,000

(C)  Construction, rehabilitation and other related costs for Montco SAAC Senior Center Facility

 

Project Allocation

2,500,000

(ii.2)  Collegeville Borough

 

(A)  Construction, infrastructure, restoration, renovation and other related costs for redevelopment

 

Project Allocation

6,000,000

(ii.3)  Conshohocken Borough

 

(A)  Construction, infrastructure, redevelopment and other related costs for development at First and Fayette Streets

 

Project Allocation

10,000,000

(ii.4)  Hatboro Borough

 

(A)  Infrastructure, construction and other related costs for rehabilitation, expansion and modernization of borough facilities, including borough hall, police station and public works building

 

Project Allocation

1,500,000

(B)  Acquisition, infrastructure, preservation and other related costs for reuse of existing historic facility

 

Project Allocation

2,500,000

(iii)  Jenkintown Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, abatement of hazardous materials, machinery, equipment and other related costs for the municipal offices and police station improvement and/or relocation project

 

Project Allocation

3,000,000

(B)  Construction, renovation, rehabilitation and other costs related to campus construction, renovations and miscellaneous improvement projects at Manor College

 

Project Allocation

5,000,000

(iii.1)  Lansdale Borough

 

(A)  Infrastructure and other related costs for facility improvements and renovation of Fairmount Volunteer Fire Company's fire house on Vine Street in Lansdale, including HVAC, fire doors and generator upgrades

 

Project Allocation

4,000,000

(B)  Renovations, rehabilitation, construction and other related costs to restore a historic freight house building into a visitor and welcome center, community hub and venue

 

Project Allocation

5,000,000

(iv)  Narberth Borough

 

(A)  Construction, renovation and rehabilitation of 201 Sabine Avenue to provide economic and community benefits by improving the park and building facilities

 

Project Allocation

3,000,000

(B)  Construction, infrastructure, renovation, site work and other related costs for the redevelopment of a property

 

Project Allocation

3,000,000

(v)  Norristown Borough

 

(A)  Acquisition, demolition, construction, renovation, infrastructure and other development costs for primary care, outpatient, clinical and education facilities at the Nicholas and Athena Karabots Medical Building

 

Project Allocation

5,000,000

(B)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for public safety projects

 

Project Allocation

10,000,000

(C)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects

 

Project Allocation

10,000,000

(D)  Construction, infrastructure improvements and other costs related to new mixed-income development in downtown Norristown

 

Project Allocation

2,000,000

(E)  Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for medical office building

 

Project Allocation

5,000,000

(F)  Acquisition, construction, infrastructure, redevelopment and other related costs for supermarket project on Markley Street

 

Project Allocation

2,500,000

(G)  Construction, infrastructure, redevelopment and other related costs for the George Washington Carver Community Center

 

Project Allocation

2,000,000

(H)  Acquisition, construction, rehabilitation and other related costs for a new Montco SAAC Senior Center

 

Project Allocation

5,000,000

(v.1)  North Wales Borough

 

(A)  Construction, renovation and other related costs for the North Penn fire house

 

Project Allocation

650,000

(v.2)  Pottstown Borough

 

(A)  Infrastructure, improvements, redevelopment, construction and other related costs to update a storm water system

 

Project Allocation

3,750,000

(B)  Infrastructure, improvements, redevelopment, construction and other related costs for repairs and updates to a storm water system section on High Street

 

Project Allocation

750,000

(C)  Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus

 

Project Allocation

1,000,000

(D)  Infrastructure, construction, rehabilitation, equipment and other related costs for STEM Pavilion main entrance, facade, addition and expansion for Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus

 

Project Allocation

3,000,000

(E)  Infrastructure, construction, rehabilitation, equipment and other related costs for renovation of South Hall Building, facade, exterior, second floor and parking lot on the Montgomery County Community College Pottstown Campus

 

Project Allocation

22,000,000

(F)  Construction, infrastructure, redevelopment and other related costs to create a North Hall Gateway on the Montgomery County Community College Pottstown Campus

 

Project Allocation

4,000,000

(G)  Acquisition, construction, renovation, equipment and other related costs for Hanover Building on the Montgomery County Community College Pottstown Campus

 

Project Allocation

3,000,000

(H)  Infrastructure, construction and related costs to build multisport athletic fields on the Montgomery County Community College Pottstown Campus

 

Project Allocation

15,000,000

(I)  Construction and other related costs for a walking trail through campus and walkway between Sustainability and Innovation Hub and Hanover on the Montgomery County Community College Pottstown Campus

 

Project Allocation

1,000,000

(v.3)  Souderton Borough

 

(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township

 

Project Allocation

2,500,000

(v.4)  Telford Borough

 

(A)  Infrastructure and other related costs for facility improvements and renovations of Telford Volunteer Fire Company's fire house

 

Project Allocation

4,000,000

(v.5)  Trappe Borough

 

(A)  Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the development of a new fire station

 

Project Allocation

4,500,000

(vi)  Abington Township

 

(A)  Construction and infrastructure relating to storm water management projects as identified by the township's storm water management plan

 

Project Allocation

15,000,000

(B)  Construction, renovation, rehabilitation and infrastructure relating to the building of a new municipal building to increase resident access to township services

 

Project Allocation

10,500,000

(C)  Construction and infrastructure relating to the creation of an inclusive park in the township for use by disabled individuals and others

 

Project Allocation

550,000

(D)  Acquisition, construction, renovation, remediation, site work, infrastructure and related improvements for a filtration project

 

Project Allocation

6,000,000

(vii)  Cheltenham Township

 

(A)  Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Elkins Park projects

 

Project Allocation

15,000,000

(B)  Construction, renovation, rehabilitation, abatement of hazardous materials, infrastructure and replacement of aging property related to the repair of two heavily traveled bridges, rebuilding the entrance areas to Curtis Arboretum and rebuilding and consolidation of the township pool system

 

Project Allocation

7,500,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other expenses related to the consolidation of township facilities onto specified township sites

 

Project Allocation

27,000,000

(D)  Construction, infrastructure improvements, including rehabilitation of sanitary sewer system, and other related costs for business development

 

Project Allocation

6,000,000

(E)  Construction, infrastructure improvements and other costs related to pedestrian signals and crossings

 

Project Allocation

2,000,000

(F)  Acquisition, construction, redevelopment and other related costs for public works facility relocation

 

Project Allocation

7,500,000

(G)  Acquisition, construction, infrastructure and other costs related to Glenside area flood protection project

 

Project Allocation

10,000,000

(H)  Construction, infrastructure, renovation and other related costs for the restoration of the Beth Sholom synagogue

 

Project Allocation

15,000,000

(vii.1)  Douglass Township

 

(A)  Construction, infrastructure and other related costs for a firehouse and emergency services building, including, but not limited to, site work, landscaping and curb and sidewalk changes

 

Project Allocation

1,510,000

(viii)  East Norriton Township

 

(A)  Acquisition, demolition, construction, renovation, infrastructure and other development costs for inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Montgomery projects

 

Project Allocation

15,000,000

(B)  Construction, infrastructure improvements and other costs related to renovation of patient rooms

 

Project Allocation

2,000,000

(viii.1)  Hatfield Township

 

(A)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for an updated location for the Hatfield Township Police Department

 

Project Allocation

4,000,000

(B)  Acquisition, infrastructure, renovation, rehabilitation, construction and other related costs for a community and economic development project in the township

 

Project Allocation

5,000,000

(C)  Infrastructure and other related costs for facility improvements and renovations of Colmar Volunteer Fire Company fire house

 

Project Allocation

5,000,000

(viii.2)  Horsham Township

 

(A)  Construction, infrastructure, renovation and other related costs to convert the Horsham Soccer Association's home field complex from grass to turf

 

Project Allocation

600,000

(B)  Construction, infrastructure, renovation and other related costs to construct a Miracle Field for visually impaired players and players in wheelchairs and construction of a new facility to house concessions, restrooms, storage and a meeting room at Deep Meadow Park

 

Project Allocation

1,250,000

(viii.3)  Limerick Township

 

(A)  Construction, renovation, infrastructure, redevelopment, realignment and other related costs for ramps, roadways, intersections and utilities for regional economic and cultural or civic development in Limerick Township

 

Project Allocation

14,000,000

(B)  Site preparation, demolition, construction, infrastructure, rehabilitation and other related costs for the redevelopment of a pharmaceutical manufacturing facility

 

Project Allocation

1,900,000

(ix)  Lower Gwynedd Township

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to a health care innovation project at Gwynedd Mercy University's campus

 

Project Allocation

10,000,000

(B)  Acquisition, infrastructure, renovations, rehabilitation, construction and other related costs for an economic development project

 

Project Allocation

10,000,000

(C)  Construction, infrastructure and other related costs for a new fire substation to assist the North Penn Volunteer Fire Company

 

Project Allocation

5,000,000

(D)  Land acquisition, construction, infrastructure and other related costs for a new public works facility

 

Project Allocation

6,250,000

(x)  Lower Merion Township

 

(A)  Construction, acquisition, infrastructure improvement, renovation, rehabilitation and associated costs for the expansion of Merion Hall on the Saint Joseph's University Campus to accommodate growth of the Kinney Center, which provides support for those on the autism spectrum

 

Project Allocation

7,400,000

(B)  Construction, infrastructure, renovation, rehabilitation and other costs related to renovation and/or replacement of the Ardmore Avenue Community Center and the PALM Senior Center

 

Project Allocation

6,000,000

(C)  Construction, infrastructure, improvements and other costs related to expansion of Ardmore Train Station transit and parking improvements project

 

Project Allocation

10,000,000

(xi)  Lower Providence Township

 

(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

5,000,000

(B)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a fire department facility and an emergency medical services facility

 

Project Allocation

2,500,000

(C)  Infrastructure, construction and other related costs, including abatement of hazardous materials, for redevelopment of a superfund site at Lower Providence Business Park

 

Project Allocation

2,500,000

(xii)  Lower Salford Township

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for a new public works complex with a detached salt storage building

 

Project Allocation

2,100,000

(xiii)  Plymouth Township

 

(A)  Acquisition, construction, renovation, redevelopment, site preparation, infrastructure and other related costs for a municipal administration building, police station, public works garage and other municipal buildings

 

Project Allocation

10,000,000

(B)  Design, site preparation, demolition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for the redevelopment of the Plymouth Meeting Mall

 

Project Allocation

14,000,000

(C)  Construction, infrastructure improvements and renovations for the East Plymouth Valley Park Little League facility

 

Project Allocation

500,000

(D)  Construction, demolition, renovations, hazardous materials abatement, infrastructure and other related costs for improvements to and an expansion of Harmonville Fire Company

 

Project Allocation

4,500,000

(xiv)  Skippack Township

 

(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

5,000,000

(xv)  Springfield Township

 

(A)  Acquisition and construction of a new fire station on an existing vacant industrial property

 

Project Allocation

2,500,000

(xvi)  Upper Dublin Township

 

(A)  Acquisition, renovation, infrastructure development, site preparation and construction to support redevelopment and revitalization of Fort Washington Office Park

 

Project Allocation

10,000,000

(B)  Reconstruction, repair, renovation, infrastructure, redevelopment and other related costs to upgrade the township building

 

Project Allocation

10,000,000

(C)  Construction, infrastructure, renovation and other related costs for the reconstruction of the tornado-damaged Upper Dublin Township building

 

Project Allocation

10,000,000

(xvii)  Upper Merion Township

 

(A)  Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the expansion and redevelopment of land and buildings

 

Project Allocation

2,500,000

(B)  Construction and other related costs for ambulance station project

 

Project Allocation

1,000,000

(C)  Construction, infrastructure, redevelopment and other related costs for projects related to Triad commercial office facility in King of Prussia

 

Project Allocation

3,000,000

(D)  Site preparation, acquisition, renovation, environmental remediation, construction, infrastructure and other related costs for the redevelopment of a Top Golf facility

 

Project Allocation

5,000,000

(E)  Construction, rehabilitation, site preparation, infrastructure, renovation and other related costs for the redevelopment of the First Avenue Linear Park multimodal trail

 

Project Allocation

657,962

(F)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of the Maurice Stephens House in Valley Forge Park

 

Project Allocation

1,000,000

(xviii)  Upper Moreland Township

 

(A)  Construction, infrastructure improvements and other related costs for Willow Grove Industrial Commons, including construction of regional storm water management basin to improve economic development of the area

 

Project Allocation

500,000

(B)  Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials, redevelopment and other related costs for improvements to PA 611 and I-276 Exit 343

 

Project Allocation

2,000,000

(C)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, green development of buildings and surrounding grounds and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of economic and community development projects in the township, including township buildings and facilities

 

Project Allocation

5,000,000

(xix)  Upper Providence Township

 

(A)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project

 

Project Allocation

5,000,000

(xx)  West Norriton Township

 

(A)  Construction, infrastructure, restoration, renovation and other related costs for the redevelopment of Jeffersonville Golf Club

 

Project Allocation

3,444,100

(B)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for the development of a community center

 

Project Allocation

5,000,000

(xxi)  Whitemarsh Township

 

(A)  Construction, infrastructure improvements and other costs related to AIM Institute for Learning and Research redevelopment and expansion project

 

Project Allocation

3,500,000

(xxii)  Whitpain Township

 

(A)  Infrastructure, rehabilitation, equipment and related costs for the construction of the Hospitality Institute at Montgomery County Community College

 

Project Allocation

15,000,000

(B)  Development, construction and related costs for the athletic fields, amphitheater and stadium complex at Montgomery County Community College

 

Project Allocation

20,000,000

(C)  Construction, infrastructure and other related costs for renovation of Montgomery County Community College Science Center's west wing

 

Project Allocation

1,500,000

(D)  Acquisition, infrastructure, renovation, rehabilitation, environmental remediation, construction and other related costs for a community and economic development project

 

Project Allocation

6,000,000

(E)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Mermaid Park

 

Project Allocation

2,000,000

(47)  Montour County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(48)  Northampton County

 

(i)  County projects

 

(A)  Construction, renovation infrastructure and redevelopment of the Nazareth YMCA

 

Project Allocation

3,500,000

(B)  Construction, infrastructure and other related costs for a multipurpose indoor and outdoor sports complex in the Lehigh Valley

 

Project Allocation

9,500,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials, equipment, machinery and other costs related to the Lehigh Valley Health Network facilities

 

Project Allocation

10,000,000

(D)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs for St. Luke's Hospital Easton campus

 

Project Allocation

10,000,000

(E)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(F)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

15,000,000

(G)  Acquisition, construction, rehabilitation, infrastructure improvements and other related costs for historic rehabilitation and other improvements in the Historic Moravian Bethlehem national historic landmark district and contributing properties to the district

 

Project Allocation

3,000,000

(ii)  Bangor Area Commercial and Industrial Development Authority

 

(A)  Acquisition, construction, infrastructure and other related costs for redevelopment and site improvements to the former Portland Power Plant

 

Project Allocation

11,000,000

(iii)  City of Bethlehem

 

(A)  Construction, acquisition, infrastructure, renovation, rehabilitation, demolition and other costs related to a mixed-use building on the Northside

 

Project Allocation

5,000,000

(B)  (Reserved)

 

(C)  Construction, infrastructure, renovation, rehabilitation and other costs related to the maintenance and preservation efforts related to the aging blast furnaces on the SteelStacks campus

 

Project Allocation

15,000,000

(D)  Construction, infrastructure, renovation, rehabilitation and other costs related to the construction and renovation of the National Museum of Industrial History

 

Project Allocation

3,000,000

(E)  Construction, infrastructure, renovation, rehabilitation and other costs relating to the construction, facilities improvements, infrastructure upgrade and redevelopment of buildings on the ArtsQuest SteelStacks campus

 

Project Allocation

7,500,000

(F)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects

 

Project Allocation

10,000,000

(G)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for a mixed-use development project

 

Project Allocation

1,000,000

(H)  Construction, infrastructure, renovation and rehabilitation of the National Museum of Industrial History, including expansion of museum exhibit space

 

Project Allocation

4,000,000

(iv)  City of Easton

 

(A)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for economic development or community improvement projects

 

Project Allocation

10,000,000

(B)  Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the former Easton Iron & Metal site

 

Project Allocation

5,000,000

(C)  Site preparation, renovation, construction, infrastructure and other related costs for the redevelopment of the Pine Street Garage

 

Project Allocation

8,000,000

(D)  Site preparation, renovation, construction, redevelopment, infrastructure and other related costs for the redevelopment of the former Stewart Silk Mill tract

 

Project Allocation

2,500,000

(E)  Construction, infrastructure and other costs related to redevelopment of mixed-use commercial and office building with integrated parking and residential upper floor

 

Project Allocation

2,000,000

(F)  Acquisition, construction and other related costs for redevelopment of Ferry Street

 

Project Allocation

3,000,000

(G)  Acquisition, construction and other related costs for redevelopment of Centre Square

 

Project Allocation

10,000,000

(H)  Construction, infrastructure, site preparation, site work, renovation and other related costs associated with the Watermark Easton residential development project

 

Project Allocation

3,000,000

(iv.1)  Freemansburg Borough

 

(A)  Construction, infrastructure and other related costs for fire, administration and public works department facilities

 

Project Allocation

2,000,000

(v)  Hellertown Borough

 

(A)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Champion Spark Plug Factory

 

Project Allocation

15,000,000

(B)  Acquisition, construction, infrastructure and other costs related to rehabilitation of former Champion Spark Plug facility

 

Project Allocation

2,500,000

(v.1)  Pen Argyl Borough

 

(A)  Construction, redevelopment and other related costs for an outdoor aquatic facility incorporating a splash pad, swimming pool and ice rink

 

Project Allocation

2,500,000

(vi)  Tatamy Borough

 

(A)  Construction, acquisition, renovation, rehabilitation and other costs related to an addition to the municipal building for the police department and police vehicle parking and the purchase of land and the construction of a community center and yard waste facility

 

Project Allocation

2,000,000

(vii)  Wilson Borough

 

(A)  Construction, acquisition, infrastructure and other costs relating to the construction of a new Wilson Borough Police Department station

 

Project Allocation

2,000,000

(B)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the redevelopment of the former Dixie Cup site

 

Project Allocation

15,000,000

(viii)  Bethlehem Township

 

(A)  Construction, infrastructure, renovation, rehabilitation and other costs related to an improvement for the Northampton Community College Multicultural Center

 

Project Allocation

1,000,000

(B)  Construction, renovation, rehabilitation, infrastructure and other costs related to support the creation of the Student Veteran's Center at Northampton Community College

 

Project Allocation

1,000,000

(C)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at William Penn Elementary School

 

Project Allocation

7,000,000

(D)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Thomas Jefferson Elementary School

 

Project Allocation

7,000,000

(E)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at Freedom High School

 

Project Allocation

12,000,000

(F)  Construction, renovation, rehabilitation and other costs related to HVAC, lighting improvements and other building systems at East Hills Middle School

 

Project Allocation

10,000,000

(G)  Rehabilitation, infrastructure, site preparation, environmental remediation and other costs related to rehabilitation and improvement projects at the historic Archibald Johnston property

 

Project Allocation

1,000,000

(ix)  Hanover Township

 

(A)  Construction, infrastructure and other related costs for nonhighway roads and other infrastructure at the Majestic Business Park at the Lehigh Valley International Airport

 

Project Allocation

20,000,000

(B)  Construction and other related costs for a community pool facility

 

Project Allocation

1,500,000

(ix.1)  Lehigh Township

 

(A)  Construction and other related costs for a new township maintenance facility

 

Project Allocation

1,500,000

(x)  Moore Township

 

(A)  Construction of a new, or renovation of the existing, municipal building housing administration, police department and a public meeting room

 

Project Allocation

3,000,000

(xi)  Upper Mount Bethel Township

 

(A)  Acquisition, construction, infrastructure and other related costs for development of River Pointe Commerce Center

 

Project Allocation

25,000,000

(49)  Northumberland County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county

 

Project Allocation

5,000,000

(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(C)  Acquisition, construction, infrastructure, renovation and other related costs for a new and independent community college

 

Project Allocation

5,000,000

(D)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs for the renovation of a former elementary school to become a multipurpose community center in Riverside Borough

 

Project Allocation

2,500,000

(ii)  DRIVE - Economic Development Pennsylvania

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for construction of an industrial facility

 

Project Allocation

5,000,000

(iii)  City of Sunbury

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Textile facility

 

Project Allocation

3,000,000

(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for redevelopment of the former Sunbury Community Hospital site

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for consolidation of the fire companies within the city

 

Project Allocation

5,000,000

(D)  Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for the renovation and expansion of an existing multipurpose community facility

 

Project Allocation

3,000,000

(50)  Perry County

 

(i)  County projects

 

(A)  Construction, infrastructure, acquisition and other related development costs for an economic development project in the county

 

Project Allocation

10,000,000

(B)  Construction, infrastructure, acquisition and other related development costs for a new Government Center

 

Project Allocation

10,000,000

(51)  Philadelphia County

 

(i)  County projects

 

(A)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University

 

Project Allocation

250,000,000

(B)  Design, infrastructure, abatement of hazardous materials and construction of an academic/administrative building, including utility upgrades and extensions, site improvements and code-related upgrades, including ADA compliance-related upgrades, at the main campus of Temple University

 

Project Allocation

185,000,000

(C)  Acquisition, infrastructure, rehabilitation, abatement of hazardous materials, construction and other related costs for a countywide revitalization project

 

Project Allocation

30,000,000

(D)  Construction, renovation, acquisition, infrastructure improvement, equipment and other related costs for the development of an ambulatory care facility, including related administrative, clinical, patient, community research, education and exterior facilities of Temple University Hospital and affiliated physician practices

 

Project Allocation

60,000,000

(E)  Construction, renovation, infrastructure improvements, equipment and other related costs for the development and modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Health System

 

Project Allocation

60,000,000

(F)  Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of administrative facilities and related clinical, patient, community, research, education and exterior facilities of Temple University Health System

 

Project Allocation

30,000,000

(G)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital-Boyer Pavilion

 

Project Allocation

40,000,000

(H)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

100,000,000

(I)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic or historical project

 

Project Allocation

100,000,000

(J)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for WES Health System facilities

 

Project Allocation

10,000,000

(K)  Design, planning, acquisition, demolition, abatement of hazardous materials, extensions or upgrading of utilities, site grading, storm water management, construction of new space or addition to and renovation of existing space, infrastructure upgrades and other related costs within an area bounded by the Schuylkill River, the Schuylkill Expressway, 26th Street and Penrose Avenue, including adjacent lots

 

Project Allocation

100,000,000

(L)  Construction, infrastructure, renovation, rehabilitation, historic preservation and related costs for Memorial Hall

 

Project Allocation

25,000,000

(M)  Acquisition, demolition, renovation, remediation, construction, infrastructure and other related costs for the development of campus assets and adjacent properties for Drexel University

 

Project Allocation

30,000,000

(N)  Acquisition, construction, infrastructure, redevelopment and other related costs for facilities at St. Christopher's Hospital for Children

 

Project Allocation

20,000,000

(O)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a 160 Driving Academy facility

 

Project Allocation

3,000,000

(P)  Acquisition, construction, demolition, reconstruction, rehabilitation, remediation, renovation, infrastructure improvements, including electrical wiring, vacant lot stabilization and other related costs for affordable housing developments owned, managed or supported by the Philadelphia Housing Authority

 

Project Allocation

250,000,000

(i.1)  Philadelphia Industrial Development Corporation

 

(A)  Construction, redevelopment and other related costs for the renovation of the International Union of Elevator Constructors (IUEC) Local 5 building

 

Project Allocation

1,000,000

(B)  Construction and other related costs for a cold storage facility for a local community food bank

 

Project Allocation

2,000,000

(i.2)  Philadelphia Authority for Industrial Development

 

(A)  Site preparation, construction, acquisition, infrastructure and other related costs for the development of the Floating Water Workshop facility in Philadelphia

 

Project Allocation

3,000,000

(B)  Site preparation, acquisition, renovation, construction, redevelopment, infrastructure and other related costs for the improvement and expansion of athletic facilities on Saint Joseph's University Campus

 

Project Allocation

7,000,000

(i.3)  Philadelphia Industrial Redevelopment Authority

 

(A)  Reconstruction of the Trocadero Theatre, including construction, infrastructure, redevelopment and other related costs

 

Project Allocation

5,000,000

(i.4)  Schuylkill River Development Corporation

 

(A)  Acquisition, construction, infrastructure and other costs related to Schuylkill Banks redevelopment and improvement projects

 

Project Allocation

20,000,000

(ii)  City of Philadelphia

 

(A)  Construction, renovation, rehabilitation and other related costs for improvements at Eastwick Park and Suffolk Park

 

Project Allocation

600,000

(B)  Construction, infrastructure, redevelopment and other related costs for the uCity Square innovative district

 

Project Allocation

10,000,000

(C)  Renovation and rehabilitation of church property to construct a permanent fence around the perimeter

 

Project Allocation

500,000

(D)  Acquisition, site preparation, renovation, construction, redevelopment, infrastructure and associated costs for the improvement and expansion of athletic facilities on the Saint Joseph's University campus

 

Project Allocation

7,000,000

(E)  Infrastructure, renovation and rehabilitation of Bethesda Manor and the Mt. Airy Administration Building

 

Project Allocation

2,000,000

(F)  Construction, acquisition, infrastructure, renovation and rehabilitation of the Broad and Olney Business District

 

Project Allocation

500,000

(G)  Construction, acquisition, infrastructure, renovation, rehabilitation and other related costs relating to a project to improve public recreation facilities, public amenities and commercial storefronts

 

Project Allocation

500,000

(H)  Construction, infrastructure, renovation and rehabilitation along the Stenton Avenue Business District

 

Project Allocation

450,000

(I)  Construction, acquisition, infrastructure, renovation and rehabilitation of St. Michael's Hall mansion

 

Project Allocation

5,000,000

(J)  Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of an indoor go-cart track, classroom space and garage

 

Project Allocation

15,000,000

(K)  Construction, infrastructure, renovation and other related costs for the Women Empowered 4 Life state-of-the-art center

 

Project Allocation

750,000

(L)  Construction, infrastructure and other costs relating to a 14,000-square-foot addition to an existing charter school facility to alleviate student and staff overcrowding and space shortages

 

Project Allocation

2,600,000

(M)  Construction, infrastructure, renovation and rehabilitation of additional square feet to the existing facility for the Ryeco LLC project

 

Project Allocation

6,000,000

(N)  Construction, infrastructure, renovation and other related costs for the Salvation Army West Philadelphia Corps Development project

 

Project Allocation

6,000,000

(O)  Construction and other costs related to the restoration of the church spire and replacement of the roof at Arch Street United Methodist Church

 

Project Allocation

10,000,000

(P)  (Reserved)

 

(Q)  Construction, infrastructure, renovation and rehabilitation of the Arch Street Presbyterian Church

 

Project Allocation

5,000,000

(R)  Construction and infrastructure relating to the reconstruction of the Historic Tun Tavern

 

Project Allocation

5,000,000

(S)  Construction, acquisition, infrastructure, renovation and rehabilitation relating to Peirce College projects

 

Project Allocation

5,000,000

(T)  Construction, infrastructure, renovation, rehabilitation and other costs related to the demolition, expansion and construction of a new center for Dare to Imagine Church, Inc.

 

Project Allocation

2,000,000

(U)  Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Water Tower Recreation Center

 

Project Allocation

10,000,000

(V)  Construction, renovation, rehabilitation and other related costs for design services, building and site improvements to the Waterview Recreation Center

 

Project Allocation

10,000,000

(W)  Construction, infrastructure, acquisition, abatement of hazardous materials and other related costs for capital improvements and development of an autism, early childhood and adult services center for SPIN, Inc.

 

Project Allocation

4,000,000

(X)  Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the Philadelphia State Hospital at Byberry, Self Help Movement Inc., facility

 

Project Allocation

5,000,000

(Y)  Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for capital improvements and renovations to the IUEC5 building

 

Project Allocation

1,000,000

(Z)  Construction, infrastructure, acquisition, abatement of hazardous materials and other costs related to projects at Jefferson-Torresdale Hospital in Northeast Philadelphia

 

Project Allocation

3,000,000

(AA)  Construction, infrastructure, renovation, rehabilitation and other costs related to the facilities master plan of the Philadelphia Museum of Art

 

Project Allocation

15,000,000

(BB)  Construction, acquisition, renovation, rehabilitation, abatement of hazardous materials and other costs related to the rehabilitation of the Charles Jacquin Et Cie, Inc. distillery

 

Project Allocation

7,500,000

(CC)  Construction, infrastructure, abatement of hazardous materials and other costs related to the construction of a dedicated building for vocational training and work force development

 

Project Allocation

4,000,000

(DD)  Construction, acquisition, renovation, rehabilitation and other costs related to improvements to and the expansion of Liguori Academy

 

Project Allocation

2,000,000

(EE)  Construction, infrastructure, renovation, rehabilitation and other costs related to the redevelopment of Philadelphia's industrial real estate stock along the major inner-city trucking corridor of Castor Avenue and East Erie Avenue

 

Project Allocation

20,000,000

(FF)  Acquisition, construction, renovations, infrastructure and other related costs for the Gaudenzia Foundation project

 

Project Allocation

10,000,000

(GG)  (Reserved)

 

(HH)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to physical plant renovations and miscellaneous improvement projects at the Library Company of Philadelphia

 

Project Allocation

5,000,000

(II)  Construction, acquisition, renovation, rehabilitation and other costs related to the South Street Art Gallery

 

Project Allocation

2,500,000

(JJ)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a child care facility project

 

Project Allocation

5,000,000

(KK)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to a work force development project

 

Project Allocation

5,000,000

(LL)  Construction, acquisition, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs relating to an affordable housing project

 

Project Allocation

5,000,000

(MM)  Acquisition, construction, infrastructure and equipment related to the development of a youth career and entrepreneurial innovation center in North Philadelphia

 

Project Allocation

5,000,000

(NN)  Acquisition, construction and development of a complex of neighborhood multiseason, multipurpose indoor and outdoor sports facilities at Hartranft Community Center

 

Project Allocation

20,000,000

(OO)  Acquisition, construction, infrastructure and equipment related to a Title IX sports complex in North Philadelphia

 

Project Allocation

10,000,000

(PP)  Rehabilitation, construction, infrastructure and equipment related to the redevelopment of Youthbuild Charter School in North Philadelphia

 

Project Allocation

8,000,000

(QQ)  Acquisition, construction, infrastructure and equipment related to the development of the Life Do Grow Farm

 

Project Allocation

1,000,000

(RR)  Acquisition, construction, infrastructure and equipment related to the neighborhood development of the Cecil B. Moore corridor in North Philadelphia

 

Project Allocation

10,000,000

(SS)  Acquisition, construction, infrastructure and equipment related to the development of a technical training institute in North Philadelphia

 

Project Allocation

10,000,000

(TT)  Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center in North Philadelphia

 

Project Allocation

5,000,000

(UU)  Construction and renovations for a Happy Hollow Recreation Center

 

Project Allocation

5,000,000

(VV)  Acquisition, construction, infrastructure and equipment related to the development of a one-stop resource center for the formerly convicted in North Philadelphia

 

Project Allocation

2,000,000

(WW)  Acquisition, construction, infrastructure and equipment related to an economic development project promoting the cultures of Africa

 

Project Allocation

2,000,000

(XX)  Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center in Hunting Park

 

Project Allocation

5,000,000

(YY)  Construction and renovations for a One Day At A Time Recovery Center at 17th and Cambria Streets

 

Project Allocation

2,000,000

(ZZ)  Acquisition and renovation to establish a permanent office space for the N. 5th Street Revitalization Project (Olney Community Collaborative), as well as tenant space for additional businesses/services providing social service resources (digital access, housing programs, food insecurity, etc.), work force development, job development training and experience and technical assistance for small business owners

 

Project Allocation

500,000

(AAA)  Construction, acquisition, infrastructure improvements, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, green infrastructure, public amenities and commercial storefronts/façades on the Broad and Olney Business District and adjacent corridors

 

Project Allocation

500,000

(BBB)  Construction, infrastructure improvements, redevelopment, equipment and other related costs for youth football fields across the City of Philadelphia

 

Project Allocation

30,000,000

(CCC)  Acquisition, demolition, construction, renovation, infrastructure and other development costs for emergency, inpatient, outpatient, clinical and educational facilities for Einstein Medical Center Philadelphia projects. Einstein intends to enhance and expand current medical center operations, including, but not limited to, expansion/renovation of the Emergency Department and enhancing educational experiences with expansion/renovation of Medical Library

 

Project Allocation

15,000,000

(DDD)  Historic adaptive redevelopment of a nine-story, 600,000-square-foot building at 2700 North Broad Street. Current plans call for the first and second floors to be commercial/retail use, anchored by a grocery store. Third, fourth and fifth floors will contain medical office space to be used by a recognized, local educational institution. The remaining four floors will be comprised of 120 units of market rate and affordable apartments. Originally, the building was designed by renowned architect Albert Kahn and constructed in 1913-1914 as a manufacturing facility for the Ford Motor Company. 2700 North Broad was the largest building in the Automobile Row district and served as regional health quarters for Ford. Due to the building having sat vacant for several decades, the redevelopment costs are anticipated to be very high to save this historic structure

 

Project Allocation

15,000,000

(EEE)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to facility upgrades at the Kimmel Center, Inc.

 

Project Allocation

10,000,000

(FFF)  Construction, infrastructure, renovation, rehabilitation, abatement of hazardous materials and other costs related to the Red Shield Family Residence

 

Project Allocation

1,000,000

(GGG)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Greenfield House Community Center project

 

Project Allocation

600,000

(HHH)  Acquisition, demolition, construction, renovation, infrastructure and other related costs for Thomas Jefferson University projects

 

Project Allocation

25,000,000

(III)  Construction, facility improvements, infrastructure and other related costs for the Special Smiles project

 

Project Allocation

1,500,000

(JJJ)  Acquisition, construction, infrastructure, redevelopment and other related costs for a project to make improvements to an elementary school on Saint Joseph's University campus

 

Project Allocation

10,000,000

(KKK)  Acquisition, construction, infrastructure, redevelopment and other related costs for the West Philadelphia Revitalization project

 

Project Allocation

10,000,000

(LLL)  Acquisition, construction, infrastructure, redevelopment and other related costs for the North Philadelphia Revitalization project

 

Project Allocation

10,000,000

(MMM)  Construction, renovation, rehabilitation and other costs associated with the redevelopment of the Huntingdon project to create work spaces, residential units, a food hall and a ghost kitchen

 

Project Allocation

4,000,000

(NNN)  Construction, renovation, rehabilitation and other costs related to the construction of the 52nd Street Hub, including a building to contain commercial, business and communal office spaces, as well as community space for the business community to facilitate entrepreneurial growth in underserved neighborhoods

 

Project Allocation

5,000,000

(OOO)  Construction, acquisition, infrastructure, redevelopment and other related costs for projects aiming to improve transportation and streetscapes, improve public amenities, preserve and reuse historic property and improve commercial storefronts in the area around the Broad, Germantown and Erie intersection in North Philadelphia

 

Project Allocation

40,000,000

(PPP)  Acquisition, construction, infrastructure, renovation and other related costs for the Consortium's Hope Counseling Center

 

Project Allocation

8,000,000

(QQQ)  Acquisition, construction, infrastructure, renovation and other related costs for parks, recreation centers and libraries as part of the Philadelphia Rebuild Program

 

Project Allocation

50,000,000

(RRR)  Acquisition, site preparation, construction, infrastructure, redevelopment, rehabilitation, environmental remediation and other related costs for economic development projects within the Allegheny West neighborhood

 

Project Allocation

25,000,000

(SSS)  Construction, infrastructure, renovation, rehabilitation and other related costs for the redevelopment of the outdoor campus and the interior building for the Woodmere Art Museum restoration and expansion project

 

Project Allocation

5,000,000

(TTT)  Construction, infrastructure, renovation and other related costs for the Liberty 53: Estelle Richman Place project

 

Project Allocation

3,000,000

(UUU)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Neighborhood Engagement Initiative affordable housing project

 

Project Allocation

10,000,000

(VVV)  Acquisition, construction, infrastructure, redevelopment and other related costs for the Enterprise Center Entrepreneurial campus development project

 

Project Allocation

10,000,000

(WWW)  Construction, renovation, infrastructure improvements, equipment and other related costs for the development of and modernization of women's health and patient care facilities, including related administrative, clinical, community, research, education and exterior facilities of Temple University Hospital

 

Project Allocation

60,000,000

(XXX)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital

 

Project Allocation

60,000,000

(YYY)  Construction, renovation, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Episcopal campus

 

Project Allocation

40,000,000

(ZZZ)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care and research facilities, including related administrative, clinical, community, education and exterior facilities for Fox Chase Cancer Center

 

Project Allocation

60,000,000

(AAAA)  Construction, renovation, acquisition, infrastructure improvements, equipment and other related costs for the modernization of patient care facilities, including related administrative, clinical, community, research, education and exterior facilities for Temple University Hospital Jeanes campus

 

Project Allocation

40,000,000

(BBBB)  Acquisition, site improvements, construction and other related costs for a minority-owned, unionized modular manufacturing factory which will offer cross-training of construction trades

 

Project Allocation

5,000,000

(CCCC)  Construction, infrastructure, restoration, redevelopment and other costs related to projects in The Woodlands' National Historic Landmark District

 

Project Allocation

5,000,000

(DDDD)  Acquisition, construction, infrastructure, renovation and other costs related to the redevelopment of a recreation center and related facilities along Chester Avenue

 

Project Allocation

10,000,000

(EEEE)  Infrastructure, improvements, redevelopment, construction, site development and other related costs for the expansion of a school building

 

Project Allocation

3,000,000

(FFFF)  Construction, renovation, infrastructure, acquisition and other related costs associated with enhanced access to the AdvanSix facility for improved public safety, including upgraded pipeline and dock operations, in the Bridesburg neighborhood

 

Project Allocation

30,000,000

(GGGG)  Construction, rehabilitation, infrastructure and other related costs for a sports complex and activity center

 

Project Allocation

8,000,000

(HHHH)  Construction, infrastructure, renovation, preparation and other related costs for the redevelopment of buildings and facilities at the Philadelphia Urban Riding Academy

 

Project Allocation

500,000

(IIII)  Construction, infrastructure, acquisition, site development, preparation and other related costs for the expansion and redevelopment of a homeless shelter in Center City

 

Project Allocation

5,000,000

(JJJJ)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for improvements to the Walnut Street Theatre

 

Project Allocation

10,000,000

(KKKK)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Girard College

 

Project Allocation

10,000,000

(LLLL)  Acquisition, design, demolition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials, machinery and equipment and other related costs for campus improvements at Philadelphia Technician Training Institute

 

Project Allocation

10,000,000

(MMMM)  Construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for Independence Seaport Museum at Penn's Landing

 

Project Allocation

8,000,000

(NNNN)  Construction, infrastructure, renovations and other costs for Independence Visitor Center

 

Project Allocation

2,000,000

(OOOO)  Construction, infrastructure, renovations and other costs for projects at Eastern State Penitentiary Historic Site

 

Project Allocation

10,000,000

(PPPP)  Acquisition, construction, infrastructure improvements and other related costs for Strawberry Mansion housing development project

 

Project Allocation

10,000,000

(QQQQ)  Construction, infrastructure, redevelopment and other related costs to support the Pennovation Works project in the Grays Ferry neighborhood of Philadelphia

 

Project Allocation

5,000,000

(RRRR)  Construction, infrastructure, renovation, rehabilitation and other costs related to WHYY's facility at 150 North 6th Street

 

Project Allocation

10,000,000

(SSSS)  Site preparation, renovation, construction and other related costs for the development of a floating art gallery on the Delaware River

 

Project Allocation

3,000,000

(TTTT)  Construction, infrastructure, renovation, rehabilitation and other costs, including necessary upgrades for the Semiquincentennial Celebration, at the Museum of the American Revolution located at 3rd and Chestnut Streets

 

Project Allocation

10,000,000

(UUUU)  Acquisition, site preparation, renovation, construction and other related costs for the development of an art facility on South Street in Philadelphia

 

Project Allocation

2,500,000

(VVVV)  Site preparation, acquisition, construction, infrastructure and other related costs for the development of the Wharton Centre

 

Project Allocation

2,147,379

(WWWW)  Acquisition, construction, redevelopment and other related costs for the project at the site of North Broad Salvation Army

 

Project Allocation

1,000,000

(XXXX)  Construction, redevelopment, site preparation, infrastructure and other related costs to be used on Hunter Street

 

Project Allocation

500,000

(YYYY)  Construction, redevelopment, site preparation, infrastructure and other related costs to renovate and improve the Haddington neighborhood

 

Project Allocation

5,000,000

(ZZZZ)  Abatement, acquisition, construction, infrastructure, redevelopment assistance, environmental remediation and other related costs for an economic development project in the Overbrook Farms neighborhood

 

Project Allocation

600,000

(A5)  Site preparation, construction, acquisition, preparation, infrastructure and other related costs to be used for the development of outdoor space at Robert E. Lamberton Elementary School for educational and recreational purposes by students and community members

 

Project Allocation

639,500

(B5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building QO in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(C5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 543 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(D5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 500 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(E5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 139 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(F5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 41 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(G5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 25 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(H5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 22 in the Philadelphia Navy Yard

 

Project Allocation

10,000,000

(I5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 19 in the Philadelphia Navy Yard

 

Project Allocation

10,000,000

(J5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 18 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(K5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 17 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(L5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 16 in the Philadelphia Navy Yard

 

Project Allocation

10,000,000

(M5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 15 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(N5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 14 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(O5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 12 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(P5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 10 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(Q5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 7 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(R5)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and green development of Building 3 in the Philadelphia Navy Yard

 

Project Allocation

5,000,000

(S5)  Site preparation, construction, renovation and other related costs for the redevelopment of a community building at Granahan Playground

 

Project Allocation

1,200,000

(T5)  Site preparation, acquisition, demolition, construction, fit out for mixed uses, including ground level retail, light industrial, community services spaces and residential end uses, and other related costs for the redevelopment of the Enterprise Center Campus Project

 

Project Allocation

7,000,000

(U5)  Construction, infrastructure, site preparation, demolition, rehabilitation and other related costs for the redevelopment of an underutilized manufacturing facility on the western edge of Center City

 

Project Allocation

5,000,000

(V5)  Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to the Christ the King Church and buildings

 

Project Allocation

2,000,000

(W5)  Construction, infrastructure, acquisition, development and other related costs for capital improvements and renovations to Our Lady of the Cavalry Catholic Church and buildings

 

Project Allocation

2,000,000

(X5)  Infrastructure, development, construction and other related costs for the redevelopment of properties along the Academy Road Commercial Corridor

 

Project Allocation

2,000,000

(Y5)  Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Castor Avenue within zip code 19152

 

Project Allocation

2,000,000

(Z5)  Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Bustleton Avenue within zip code 19152

 

Project Allocation

2,000,000

(A6)  Infrastructure, development, construction and other related costs for the redevelopment of properties along the section of Grant Avenue Commercial Corridor

 

Project Allocation

2,000,000

(B6)  Construction, renovation, infrastructure improvement and equipment related to the development of a neighborhood community facility in the northeast section of Philadelphia containing the zip codes 19114, 19136, 19152 and 19154

 

Project Allocation

5,000,000

(C6)  Expansion and renovation of a training facility with a State-approved apprenticeship program in the northeast section of Philadelphia containing zip codes 19114, 19130 and  19154

 

Project Allocation

20,000,000

(D6)  Construction, infrastructure, acquisition and other costs related to the expansion and renovation of a facility used for dance education and training located in the northeast section of Philadelphia containing zip code 19114

 

Project Allocation

15,000,000

(E6)  Construction, infrastructure, acquisition and other costs for the creation of a new early childhood center and outdoor playground located in the northeast section of Philadelphia containing zip code 19114

 

Project Allocation

1,100,000

(F6)  Construction, site preparation, expansion and renovation of sports complex to provide community access to indoor and outdoor family activities in the northeast section of Philadelphia containing zip codes 19114, 19136, 19152 and 19154

 

Project Allocation

5,000,000

(G6)  Construction, site preparation, demolition, infrastructure, acquisition and other costs for field renovation for Mastery Charter Schools

 

Project Allocation

2,000,000

(H6)  Construction, site renovation, demolition, infrastructure and other related costs for the redevelopment of the Christy Recreation Center

 

Project Allocation

5,000,000

(I6)  Demolition, infrastructure improvements, construction and other related costs for a redevelopment project in the vicinity of 11th and Walnut Streets

 

Project Allocation

15,000,000

(J6)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Vernon House

 

Project Allocation

4,000,000

(K6)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the redevelopment of Colonel Charles Young Post #682

 

Project Allocation

1,000,000

(L6)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building on North Broad Street

 

Project Allocation

5,000,000

(M6)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the revitalization of a commercial building

 

Project Allocation

20,000,000

(N6)  Construction, infrastructure, site preparation, renovation, environmental remediation, repair and other related costs for the Weavers Way Germantown Expansion Project

 

Project Allocation

2,500,000

(O6)  Construction, renovation, including major systems, plumbing, electrical, HVAC and roofing renovation, and other related costs to maintain and redevelop the Project Learn School

 

Project Allocation

1,000,000

(P6)  Remediation, renovation and construction for ADA-compliant access and all major systems upgrades and other related costs for the water tower recreation center

 

Project Allocation

2,500,000

(Q6)  Acquisition, demolition, construction, infrastructure, redevelopment and other related costs to revitalize the Tioga Marine Terminal along with the rehabilitation of two container cranes

 

Project Allocation

25,000,000

(R6)  Acquisition, demolition, construction, infrastructure, redevelopment, securitization, fencing and other related costs to revitalize, rehabilitate and enhance security on a portion of the Consolidated Rail Corporation (Conrail) line bounded by Aramingo Avenue and the Frankford Creek

 

Project Allocation

2,500,000

(S6)  General improvements, including infrastructure enhancement, new construction and demolition, land and equipment acquisition and main capital maintenance projects at all Philadelphia Regional Port Authority facilities

 

Project Allocation

200,000,000

(T6)  Rehabilitation, renovation, construction, infrastructure and other related costs for the redevelopment of the Philadelphia Orchestra and Kimmel Center, Inc.

 

Project Allocation

20,000,000

(U6)  Rehabilitation, renovation, construction, infrastructure and other related costs for redevelopment at 300 South Broad Street

 

Project Allocation

20,000,000

(V6)  Infrastructure, development, construction and other related costs for facilities improvement to the Northeast Family YMCA

 

Project Allocation

2,000,000

(W6)  Infrastructure, development, construction and other related costs for facilities renovation and improvement to the Penn Crisp Gym

 

Project Allocation

2,000,000

(X6)  Construction, site preparation, expansion and other related costs for golf facilities and a youth golf learning center for the Union League Golf Club at Torresdale

 

Project Allocation

5,000,000

(Y6)  Construction, infrastructure, development and other related costs for capital improvements and renovation of clubhouse facilities and a youth golf education center for the First Tee of Greater Philadelphia

 

Project Allocation

2,000,000

(Z6)  Construction, site development, infrastructure, redevelopment and other costs and improvements to Al-Aqsa Islamic Academy

 

Project Allocation

7,500,000

(A7)  Construction, site development, infrastructure, redevelopment and other costs and improvements for Al-Aqsa Islamic Academy and the surrounding campus

 

Project Allocation

7,500,000

(B7)  Construction, infrastructure, redevelopment and other improvements to 1501 North Germantown Avenue in Philadelphia

 

Project Allocation

7,500,000

(C7)  Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's Health and Wellness Campus in Kensington

 

Project Allocation

7,500,000

(D7)  Acquisition, construction, infrastructure and equipment related to the expansion of Esperanza Health Center's North 5th Street location

 

Project Allocation

5,000,000

(E7)  Construction, infrastructure and other related costs for the Children's Crisis Treatment Center - North Philadelphia

 

Project Allocation

6,000,000

(F7)  Design, construction, redevelopment, renovation, rehabilitation and other related costs for the development of property located in the city related to an e-Sports facility located at 401 North Broad Street

 

Project Allocation

2,000,000

(G7)  Construction, infrastructure, redevelopment, renovation and other related costs for an industrial warehouse

 

Project Allocation

3,000,000

(H7)  Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities

 

Project Allocation

20,000,000

(I7)  Acquisition, construction, rehabilitation, renovation, environmental and hazardous assessment and remediation, infrastructure improvements and other related costs for the development of industrial warehouse facilities for Bridge Point Philadelphia

 

Project Allocation

20,000,000

(iii)  Philadelphia Independent School District

 

(A)  Construction, site preparation, expansion and infrastructure-related costs and construction of a school campus academic facility located in the northeast section of Philadelphia containing zip code 19154

 

Project Allocation

10,000,000

(B)  Construction, site preparation, expansion and infrastructure-related costs and construction of a grade school academic facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152

 

Project Allocation

10,000,000

(C)  Construction, site preparation, expansion and infrastructure-related costs and construction of a state-of-the-art STEM education facility located in the northeast section of Philadelphia containing zip codes 19114, 19136 and 19152

 

Project Allocation

10,000,000

(52)  Pike County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(B)  Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility

 

Project Allocation

10,000,000

(53)  Potter County

 

(i)  (Reserved)

 

(54)  Schuylkill County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, machinery, equipment and other related costs for a Lehigh Valley Health Network facility

 

Project Allocation

10,000,000

(B)  Physical infrastructure improvements at Penn State Schuylkill

 

Project Allocation

750,000

(C)  Construction, infrastructure and other related costs for the Schuylkill County Emergency Management Offices and Training Facility in West Mahanoy Township

 

Project Allocation

1,500,000

(ii)  City of Pottsville

 

(A)  Acquisition, infrastructure, construction, renovation and other related costs for development of a farmers market

 

Project Allocation

500,000

(B)  Acquisition, infrastructure, construction, renovation and other related costs for a streetscape project, including stormwater management, façade improvements, landscaping, lighting, parking lots, restrooms and streetscape improvements

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, construction, renovation and other related costs for development of downtown properties and streetscape improvements

 

Project Allocation

5,000,000

(D)  Acquisition, infrastructure, construction, renovation and other related costs for historic housing revitalization

 

Project Allocation

5,000,000

(iii)  Tamaqua Borough

 

(A)  Infrastructure, rehabilitation and other related costs for development of a live-work space entrepreneurial center with high-speed fiber optic Internet service

 

Project Allocation

2,500,000

(iv)  Schuylkill Economic Development Corporation

 

(A)  Redevelopment and construction of an industrial shell building at Rush Township Industrial Park

 

Project Allocation

1,500,000

(B)  Acquisition, infrastructure, construction, utility extensions and roadway improvements for development of a Schuylkill Airport Industrial Park

 

Project Allocation

2,000,000

(C)  Redevelopment and construction of commercial and industrial buildings at Highridge Industrial Park

 

Project Allocation

2,000,000

(D)  Acquisition, infrastructure, construction and other related costs for a rehabilitation of the former Ashland State Hospital complex to retrofit into a multipurpose facility

 

Project Allocation

2,000,000

(E)  Rehabilitation, infrastructure and other related costs for construction of additional buildings and expansion at an industrial complex

 

Project Allocation

20,000,000

(55)  Snyder County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for renovations of a county-owned facility

 

Project Allocation

2,000,000

(B)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for a cultural, civic or historical project in the county

 

Project Allocation

5,000,000

(C)  Acquisition, infrastructure, redevelopment, abatement of hazardous materials, construction and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(ii)  Selinsgrove Borough

 

(A)  Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for creation of an intergenerational community life center

 

Project Allocation

2,500,000

(56)  Somerset County

 

(i)  County projects

 

(A)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and other related costs for historic preservation and/or green development of Conemaugh Health System facilities

 

Project Allocation

5,000,000

(57)  Sullivan County

 

(i)  (Reserved)

 

(58)  Susquehanna County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county

 

Project Allocation

10000000

(B)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for historic rehabilitation, new facilities and other improvements to the historic Dennis Farm property

 

Project Allocation

5,000,000

(59)  Tioga County

 

(i)  (Reserved)

 

(60)  Union County

 

(i)  County projects

 

(A)  Acquisition, infrastructure, rehabilitation, redevelopment, construction and other related costs for the Evangelical Community Hospital

 

Project Allocation

10,000,000

(61)  Venango County

 

(i)  County projects

 

(A)  Construction and other related costs for renovations to the dementia wing of a senior care facility

 

Project Allocation

1,000,000

(B)  Acquisition, construction, infrastructure, abatement of hazardous materials, equipment upgrades and other related costs for expansion of a community dental center

 

Project Allocation

2,500,000

(C)  Construction and other related costs to build residential homes for residents currently being served at the Polk Center in Polk Borough

 

Project Allocation

2,000,000

(62)  Warren County

 

(i)  (Reserved)

 

(ii)  Northwest Pennsylvania Regional Planning and Development Commission

 

(A)  Acquisition of a property within Warren County for the purpose of construction of a new building or renovation of an existing building to meet the needs of current employers or attract new employers to the county

 

Project Allocation

1,500,000

(iii)  City of Warren

 

(A)  Construction, infrastructure, redevelopment, renovation and other related costs for Warren General Hospital, including, but not limited to, updating elevators, bathrooms and sidewalks to meet ADA requirements

 

Project Allocation

5,000,000

(63)  Washington County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs for a community and economic development project in the county

 

Project Allocation

25,000,000

(B)  Acquisition, construction, reconstruction, rehabilitation, renovation, environmental and/or hazardous assessment and remediation, infrastructure improvements, including improvements related to energy, transportation, parking and common areas, and all other related costs for the development, expansion, renovation, redevelopment, reuse, historic preservation and/or green development of an alternative energy facility in Robinson Township

 

Project Allocation

10,000,000

(C)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(D)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(ii)  Redevelopment Authority of the County of Washington

 

(A)  Construction, renovation, rehabilitation and infrastructure costs for capital improvements to the Washington Wild Things park

 

Project Allocation

10,000,000

(B)  Acquisition, demolition, infrastructure, abatement of hazardous materials, renovation, rehabilitation, construction and other related costs for a blight remediation project at the intersection of Main and Chestnut streets in the City of Washington

 

Project Allocation

5,000,000

(C)  Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in Canonsburg Borough

 

Project Allocation

3,000,000

(D)  Acquisition, construction, renovation, rehabilitation, abatement of hazardous materials, redevelopment, infrastructure, other related costs and economic development projects for Arc Human Services, Inc. in the City of Washington

 

Project Allocation

3,000,000

(E)  Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a capital construction project that will include a visitors' center at Meadowcroft Rockshelter and Historic Village

 

Project Allocation

2,000,000

(F)  Construction, infrastructure, rehabilitation and other related costs for expansion and upgrades to the Donora Public Library, including new green heating and cooling

 

Project Allocation

350,000

(iii)  City of Washington

 

(A)  Construction, renovation, rehabilitation, redevelopment and other related costs for a community center renovation project at Transitional Paths to Independent Living (TRPIL)

 

Project Allocation

1,500,000

(iv)  Midway Borough

 

(A)  Acquisition, construction, renovation, rehabilitation, demolition, redevelopment and other related costs for a project to relocate the existing municipal building

 

Project Allocation

1,000,000

(v)  North Strabane Township

 

(A)  Acquisition, construction, renovation, rehabilitation and other related costs for a new public safety building

 

Project Allocation

4,100,000

(vi)  Peters Township

 

(A)  Redevelopment, infrastructure and other related costs for a spillway enhancement project for the dam at Peters Lake Park

 

Project Allocation

2,500,000

(B)  Acquisition, construction, redevelopment, infrastructure and other related costs for the construction of a new fire substation and the purchase of a new fire engine

 

Project Allocation

2,500,000

(vii)  South Strabane Township

 

(A)  Acquisition, construction, infrastructure and other related costs for an indoor waterpark, hotel and convention center, including a solar array to power the complex and adjacent properties

 

Project Allocation

25,000,000

(64)  Wayne County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(ii)  Greater Honesdale Partnership

 

(A)  Acquisition, site development, demolition, infrastructure, vertical construction, redevelopment and related costs for a community or economic development project

 

Project Allocation

5,000,000

(65)  Westmoreland County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation and other related costs for an economic development project in the county as identified in the 2018 comprehensive plan "Reimagining Our Westmoreland"

 

Project Allocation

25,000,000

(B)  Acquisition, construction, renovation, infrastructure improvements and other related costs for a community or economic development project or initiative

 

Project Allocation

25,000,000

(C)  Construction, demolition, site and material abatement, site predevelopment activities, redevelopment, renovation, rehabilitation, infrastructure and other related costs to replace a roof; repair, replace or separate utilities; establish multitenant corridors; construct multitenant truck courts; and construct new buildings

 

Project Allocation

20,000,000

(D)  Acquisition, construction, demolition, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the development of a convention center as a priority project for the comprehensive plan "Reimagining Our Westmoreland"

 

Project Allocation

10,000,000

(E)  Acquisition, construction, redevelopment, renovation, rehabilitation, infrastructure improvements and other related costs for a facility to house a medical school for the Lake Erie College of Osteopathic Medicine (LECOM)

 

Project Allocation

10,000,000

(F)  Acquisition, construction, demolition, renovation, rehabilitation, abatement of hazardous materials, infrastructure and other related costs for the Seton Hill University campus

 

Project Allocation

10,000,000

(G)  Acquisition, redevelopment, construction, renovation, rehabilitation, infrastructure extensions and improvements and other related costs for an economic development project along or near US Route 22

 

Project Allocation

5,000,000

(H)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for a green manufacturing or industrial facility that utilizes state-of-the-art natural gas and hydrogen technology to reduce CO2 emissions

 

Project Allocation

20,000,000

(I)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs of a project for the National Electrical Contractors Association and its membership

 

Project Allocation

7,000,000

(J)  Acquisition, abatement of hazardous materials, infrastructure, construction, redevelopment, site development and other related costs for Watt Fuel Cell Corporation facilities

 

Project Allocation

35,000,000

(ii)  Redevelopment Authority of the County of Westmoreland

 

(A)  Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a three-story building in the City of Monessen

 

Project Allocation

7,500,000

(B)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a brownfield site in Trafford Borough

 

Project Allocation

3,500,000

(C)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former steel plant facility in the City of Latrobe

 

Project Allocation

1,500,000

(D)  Acquisition, construction, redevelopment, infrastructure, abatement of hazardous materials and other related costs to redevelop a former metal roll manufacturing facility in Avonmore Borough

 

Project Allocation

1,500,000

(E)  Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former glass plant in Hempfield Township

 

Project Allocation

1,500,000

(F)  Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs for the adaptive reuse of a former five-story bank building in the City of Jeannette

 

Project Allocation

1,500,000

(G)  Construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in Mount Pleasant Borough

 

Project Allocation

500,000

(H)  Acquisition, demolition, redevelopment, abatement of hazardous materials and other related costs to redevelop a site in East Huntingdon Township

 

Project Allocation

500,000

(I)  Acquisition, construction, redevelopment, abatement of hazardous materials and other related costs to redevelop a former brewing facility in Smithton Borough

 

Project Allocation

500,000

(J)  Construction, redevelopment, abatement of hazardous materials and other related costs to adaptively reuse a former trolley barn in Derry Borough

 

Project Allocation

500,000

(K)  Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for facilities at AHN Hempfield Neighborhood Hospital

 

Project Allocation

10,000,000

(iii)  Economic Growth Connection of Westmoreland

 

(A)  Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new aluminum manufacturing innovation and technical center and new laboratory infrastructure

 

Project Allocation

7,000,000

(iii.1)  Export Borough

 

(A)  Acquisition, construction, infrastructure, redevelopment, rehabilitation and other related costs for a downtown renovation project, including park development, renovation of a historic train station and development of the Westmoreland Heritage Bike Trail

 

Project Allocation

1,000,000

(B)  Construction and other related costs for the development of a park and facilities, including a parking lot, picnic shelters, sidewalks and restrooms

 

Project Allocation

667,000

(iv)  Hempfield Township

 

(A)  Acquisition, construction, renovation, rehabilitation, infrastructure and other related costs for a new regional public safety facility

 

Project Allocation

10,000,000

(v)  Latrobe Industrial Development Authority

 

(A)  Acquisition, construction, renovation, rehabilitation, redevelopment, infrastructure and other related costs for the Saint Vincent College community outreach center in the City of Latrobe, other facilities in the City of Latrobe and facilities on the Saint Vincent College campus

 

Project Allocation

5,000,000

(v.1)  Redevelopment Authority of Westmoreland County

 

(A)  Construction, acquisition, infrastructure, redevelopment and other related costs for renovation and rehabilitation of the Laurel Highlands Workforce and Opportunity Center in Hempfield Township

 

Project Allocation

2,000,000

(vi)  Southwest Greensburg Borough

 

(A)  Construction and other related costs for a borough garage

 

Project Allocation

1,000,000

(vii)  Westmoreland County Industrial Development Corporation

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation, rehabilitation, abatement of hazardous materials and other related costs associated with the improvement and expansion of the Adelphoi campus and associated facilities

 

Project Allocation

3,000,000

(B)  Acquisition, construction and other related costs for Online Stores, Inc., to build a warehouse and manufacturing facility in Sewickley Township

 

Project Allocation

1,500,000

(66)  Wyoming County

 

(i)  County projects

 

(A)  Acquisition, construction, infrastructure, redevelopment, abatement of hazardous materials and other related costs for an economic development project in the county

 

Project Allocation

10,000,000

(B)  Acquisition, redevelopment, renovation, rehabilitation and other related costs for Tyler Memorial Hospital

 

Project Allocation

1,000,000

(67)  York County

 

(i)  County projects

 

(A)  Acquisition, site preparation, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of WellSpan Health health care facilities

 

Project Allocation

5,000,000

(B)  Acquisition, site preparation, infrastructure, construction and other related costs associated with a large-scale, mixed-use development project north of Canal Road in Conewago Township

 

Project Allocation

5,000,000

(C)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for an economic development project

 

Project Allocation

15,000,000

(D)  Acquisition, construction, rehabilitation, infrastructure, demolition, site preparation, environmental remediation and other related costs for a cultural, civic, or historical project

 

Project Allocation

15,000,000

(i.1)  City of York Redevelopment Authority

 

(A)  Construction, infrastructure, acquisition, site preparation, abatement of hazardous materials and other related costs for the redevelopment of the former Dentsply manufacturing facility and the creation of a mix-used urban redevelopment project

 

Project Allocation

15,000,000

(B)  Construction, infrastructure, site preparation and other related costs for the redevelopment of new retail and housing spaces to eliminate and enhance surface parking areas

 

Project Allocation

10,000,000

(C)  Construction, infrastructure, site preparation and other related costs for the development of structured parking and the development of new retail and housing spaces to eliminate and enhance surface parking areas

 

Project Allocation

9,000,000

(i.2)  Red Lion Municipal Authority

 

(A)  Demolition, construction, infrastructure and other related costs for the demolition of an aged and damaged steel water storage tank and the construction of a new concrete water storage tank in Red Lion Borough and Windsor Township

 

Project Allocation

1,150,000

(i.3)  Redevelopment Authority of the County of York

 

(A)  Site preparation, remediation, construction, infrastructure, renovation and other related costs for the development and site improvement for York College facility

 

Project Allocation

3,000,000

(ii)  York County Economic Alliance

 

(A)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for development of an outdoor economy site for recreation

 

Project Allocation

4,000,000

(B)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for business expansion and development within York County's Historic Trail Towns communities

 

Project Allocation

4,000,000

(C)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the City of York

 

Project Allocation

5,000,000

(D)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for expansion and development of a manufacturing facility

 

Project Allocation

5,000,000

(E)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for historic preservation, restoration and reuse of property located within the Borough of Hanover

 

Project Allocation

5,000,000

(F)  Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use in a strategic corridor of the county

 

Project Allocation

5,000,000

(G)  Acquisition, redevelopment, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for site redevelopment along the York County Heritage Rail Trail

 

Project Allocation

5,000,000

(H)  Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for redevelopment of property for mixed-use along the Codorus Innovation Corridor in the City of York

 

Project Allocation

6,000,000

(I)  Acquisition, renovation, construction, infrastructure, abatement of hazardous materials and other related costs for nonprofit redevelopment, modernization and service enhancements throughout the county

 

Project Allocation

10,000,000

(J)  Acquisition, construction and other related costs for safe workforce sustainable living units and commercial spaces

 

Project Allocation

5,000,000

(K)  Acquisition, construction, infrastructure and redevelopment of a strategic site in Hanover Borough to enhance the property for productive use

 

Project Allocation

5,000,000

(ii.1)  City of York

 

(A)  Acquisition, demolition, construction, infrastructure and other related costs to redevelop and expand a facility

 

Project Allocation

10,000,000

(iii)  Chanceford Township

 

(A)  Construction, renovation and other related costs for the existing township community/municipal building

 

Project Allocation

1,000,000

(iv)  Windsor Township

 

(A)  Construction, infrastructure, design, administration, storm water management and other related costs for a community center building and other site improvement activities

 

Project Allocation

3,000,000

(68)  Multiple Counties

 

(i)  Crawford, Erie, Mercer, Venango and Warren Counties

 

(A)  Acquisition, construction, infrastructure, redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility

 

Project Allocation

25,000,000

(ii)  Allegheny, Armstrong, Beaver, Butler, Cambria, Fayette, Washington and Westmoreland Counties

 

(A)  Acquisition, construction, infrastructure redevelopment, renovation and other related costs for construction or improvement of a regional juvenile detention facility

 

Project Allocation

25,000,000

(iii)  Columbia and Luzerne Counties

 

(A)  Acquisition, construction, infrastructure, rehabilitation, abatement of hazardous materials and other related costs for expansion of the Berwick Hospital behavioral health unit

 

Project Allocation

3,000,000

(iv)  Lackawanna and Wyoming Counties

 

(A)  Construction, infrastructure, redevelopment, acquisition and other related costs for Keystone College improvement projects

 

Project Allocation

5,000,000

(v)  Chester County

 

(A)  Construction of infrastructure to support track, station, ancillary features and safety improvements for operation of West Chester Railroad tourist trains, restoration of common carrier passenger rail service to West Chester, West Chester University, Westtown, Cheyney University and Center City via SEPTA connection, restoration of freight rail access to Glen Mills Quarry and private-sector tech start-up to demonstrate innovative battery technology

 

Project Allocation

3,962,500

(vi)  Cumberland, Franklin, Lancaster and York Counties

 

(A)  Acquisition, construction, infrastructure, redevelopment and other related costs for new construction, expansions and improvements for a value-added dairy processing facility using Pennsylvania milk

 

Project Allocation

25,000,000

(vii)  Armstrong, Clarion, Forest and Venango Counties

 

(A)  Acquisition, site development, construction, infrastructure, redevelopment, abatement of hazardous materials and other costs for multicounty trail projects

 

Project Allocation

10,000,000

 

Section 7.  Itemization of flood control projects.

Additional capital projects in the category of flood control projects to be constructed by the Department of Environmental Protection, its successors or assigns, and to be financed by the incurring of debt are hereby itemized, together with their respective estimated costs, as follows:

 

Project

Total Project

Allocation

(1)  Department of Environmental Protection

 

(i)  Allegheny County

 

(A)  Construction, infrastructure and other related costs for a storm water line replacement, including storm sewer, manhole and replacement of a failing inlet, to reduce excessive runoff and flooding in Ben Avon Heights Borough

 

Project Allocation

50,000

(B)  Construction, infrastructure and other related costs for drainage improvement and flood control on Harmony Road in Ohio Township, including installation of inlet boxes, cast iron frames, safety grates, culvert piping, outlets, earth work and wall erosion and sediment control

 

Project Allocation

158,000

(C)  Construction, redevelopment and other related costs for a detention pond retrofit at Northridge, including earth work, maintenance and protection of traffic, culvert pipe installation, outlet removal and removal and replacement, erosion and sediment control, fencing and landscape restoration in Ohio Township

 

Project Allocation

169,000

(D)  Construction, infrastructure and other related costs for a pollutant reduction plan project, including storm water detention pond improvements and sediment reduction in South Fayette Township

 

Project Allocation

250,000

(E)  Construction, rehabilitation and other related costs for the Werner Avenue Slope Stabilization project, including a new retaining wall, roadway improvements and installation of storm sewer and catch basins for erosion prevention in Bridgeville Borough

 

Project Allocation

700,000

(F)  Construction, infrastructure and other related costs for detention pond construction to alleviate flooding in the Broughton area of South Park Township

 

Project Allocation

900,000

(G)  Construction, infrastructure, rehabilitation and other related costs for a flood mitigation project in Oakdale Borough

 

Project Allocation

1,000,000

(H)  Construction, infrastructure, rehabilitation and other related costs for Phase I of the McLaughlin Run Flood Control project, including construction of a levee with pumps along Carol Avenue and replacement of the Commercial Street culverts in Bridgeville Borough

 

Project Allocation

5,600,000

(ii)  Bucks County

 

(A)  Core Creek Dam flood control - rehabilitation

 

Project Allocation

1,700,000

(B)  Acquisition, rehabilitation, infrastructure, flood mitigation and related costs for a riverfront redevelopment project

 

Project Allocation

10,000,000

(C)  Construction, acquisition, infrastructure, renovation, rehabilitation and other costs related to waterway bank restoration projects and storm water management projects

 

Project Allocation

5,000,000

(iii)  Crawford County

 

(A)  Rainbow Dam flood control - rehabilitation

 

Project Allocation

3,800,000

(iii.1)  Delaware County

 

(A)  Construction and other costs relating to the South Wayne Avenue Flood Reduction Project in Radnor Township

 

Project Allocation

1,000,000

(iii.2)  Lackawanna County

 

(A)  Acquisition, construction, infrastructure and other related costs to mitigate flooding

 

Project Allocation

10,000,000

(iv)  Luzerne County

 

(A)  Construction, infrastructure, rehabilitation and other related costs for the West Pittston flood mitigation levee project

 

Project Allocation

15,000,000

(B)  Acquisition, construction, infrastructure and other related costs to mitigate flooding

 

Project Allocation

5,000,000

(v)  Lycoming County

 

(A)  Construction, infrastructure and other related costs for the Lawshee Run culvert replacement project in Jersey Shore Borough

 

Project Allocation

15,000,000

(B)  Acquisition, site development, construction, infrastructure, redevelopment, equipment, abatement of hazardous materials and other related costs for a flood control project

 

Project Allocation

20,000,000

(v.1)  Monroe County

 

(A)  Acquisition, construction, infrastructure and other related costs to mitigate flooding

 

Project Allocation

5,000,000

(vi)  Montgomery County

 

(A)  Construction, infrastructure and other related costs for a storm water arch rehabilitation project located under 1200 High Street in the Borough of Pottstown

 

Project Allocation

750,000

(B)  Construction, infrastructure and other related costs for a storm water arch rehabilitation project in the Borough of Pottstown

 

Project Allocation

3,750,000

(vii)  Pike County

 

(A)  Kintz Creek Dam flood control - rehabilitation

 

Project Allocation

2,300,000

(viii)  Tioga County

 

(A)  Hamilton Dam flood control - rehabilitation

 

Project Allocation

1,800,000

(ix)  Washington County

 

(A)  Construction, infrastructure and other related costs for a storm water management and backflow prevention project in West Brownsville Borough

 

Project Allocation

500,000

(B)  Construction, infrastructure, rehabilitation and other related costs for a two-stage flood plain restoration project located along Tributary 1 of Catfish Creek upstream of SR 18 in the City of Washington, including realignment of the stream, recreation of historical floodplain, stabilization of existing incised banks and natural plan stabilization

 

Project Allocation

700,000

(x)  York County

 

(A)  Acquisition, demolition, site preparation, environmental remediation, infrastructure, construction and other related costs for rehabilitation of Silver Lake

 

Project Allocation

2,000,000

Section 8.  Itemization of Pennsylvania Fish and Boat Commission capital projects.

Capital projects in the category of public improvement projects to be acquired or developed by the Pennsylvania Fish and Boat Commission and to be financed by the incurring of debt or by the current revenues of the Fish Fund and the Boat Fund pursuant to executive authorizations are hereby itemized, together with their respective estimated costs, as follows:

 

Project

Total Project Allocation

(1)  Pennsylvania Fish and Boat Commission

 

(i)  Cambria County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Duman Lake

 

Project Allocation

4,715,000

(ii)  Carbon County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Mauch Chunk Lake

 

Project Allocation

7,075,000

(iii)  Centre County

 

(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Bellefonte State Fish Hatchery

 

Project Allocation

8,385,000

(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Pleasant Gap State Fish Hatchery

 

Project Allocation

5,235,000

(C)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Benner Spring State Fish Hatchery

 

Project Allocation

9,125,000

(iv)  Clinton County

 

(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Tylersville State Fish Hatchery

 

Project Allocation

3,155,000

(v)  Columbia County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Briar Creek Lake

 

Project Allocation

7,765,000

(vi)  Crawford County

 

(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Linesville State Fish Hatchery

 

Project Allocation

14,365,000

(vi.1)  Cumberland County

 

(A)  Design, permit, acquisition of properties, dam construction, repair and replacement of amenities, appurtenances, ADA accessibility and sediment removal operations as necessary at Children's Lake

 

Project Allocation

2,000,000

(vii)  Erie County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Hatchery Pond

 

Project Allocation

1,045,000

(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Corry State Fish Hatchery

 

Project Allocation

9,125,000

(C)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Fairview State Fish Hatchery

 

Project Allocation

4,465,000

(D)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Union City State Fish Hatchery

 

Project Allocation

4,365,000

(viii)  Forest County

 

(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Tionesta State Fish Hatchery

 

Project Allocation

5,185,000

(ix)  Luzerne County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Lilly Lake

 

Project Allocation

485,000

(x)  Potter County

 

(A)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Oswayo State Fish Hatchery

 

Project Allocation

8,485,000

(xi)  Susquehanna County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Stump Pond

 

Project Allocation

3,435,000

(xii)  Warren County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Browns Pond

 

Project Allocation

3,485,000

(xiii)  Wayne County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Douglas Pond

 

Project Allocation

3,715,000

(B)  Design, permit, construct, rehabilitate or improve fish-rearing facilities, buildings, effluent treatment and related infrastructure at Pleasant Mount State Fish Hatchery

 

Project Allocation

7,035,000

(xiv)  Wyoming County

 

(A)  Design, permit, acquire properties, construct a rehabilitated dam, including repair and replacement of amenities, appurtenances and ADA accessibility, or remove a hazardous dam to meet current dam safety requirements at Lake Winola

 

Project Allocation

485,000

Section 9.  Debt authorization.

(a)  Public improvements.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(a).

(b)  Furniture and equipment.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(b) as may be found necessary to carry out the acquisition and construction of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in the capital budget.

(c)  Transportation assistance.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(c) as may be found necessary to carry out the acquisition and construction of the transportation assistance projects specifically itemized in a capital budget.

(d)  Redevelopment assistance.--Subject to the limitations in section 2.1 of the act of May 29, 2020 (P.L.205, No.25), known as the Capital Budget Act of 2019-2020, the Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(d) as may be found necessary to carry out the redevelopment assistance capital projects specifically itemized in the capital budget.

(e)  Flood control.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate the sum specified in section 2(e) as may be found necessary to carry out the acquisition and construction of the flood control projects specifically itemized in a capital budget.

(f)  Pennsylvania Fish and Boat Commission projects.--The Governor, Auditor General and State Treasurer are hereby authorized and directed to borrow from time to time in addition to any authorization heretofore or hereafter enacted, on the credit of the Commonwealth, subject to the limitations provided in the current capital budget, money not exceeding in the aggregate specified in section 2(f) to carry out the acquisition and construction of the Pennsylvania Fish and Boat Commission projects specifically itemized in a capital budget.

Section 10.  Issue of bonds.

The indebtedness authorized in this act shall be incurred from time to time and shall be evidenced by one or more series of general obligation bonds of the Commonwealth in such aggregate principal amount for each series as the Governor, the Auditor General and the State Treasurer shall determine, but the latest stated maturity date shall not exceed the estimated useful life of the projects being financed as stated in section 11.

Section 11.  Estimated useful life and term of debt.

(a)  Estimated useful life.--The General Assembly states that the estimated useful life of the capital projects itemized in this act is as follows:

(1)  Public improvement projects, 30 years.

(2)  Furniture and equipment, 10 years.

(3)  Transportation assistance projects:

(i)  Rolling stock, 15 years.

(ii)  Passenger buses, 12 years.

(iii)  Furniture and equipment, 10 years.

(iv)  All others, 30 years.

(4)  Redevelopment assistance projects, 30 years.

(b)  Term of debt.--The maximum term of the debt authorized to be incurred under this act is 30 years.

Section 12.  Appropriations.

(a)  Public improvements.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(a) to be used by it exclusively to defray the financial cost of the public improvement projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(b)  Furniture and equipment.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of General Services in the maximum amount specified in section 2(b) to be used by it exclusively to defray the financial cost of the public improvement projects consisting of the acquisition of original movable furniture and equipment specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of General Services the money as required and certified by it to be legally due and payable.

(c)  Transportation assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Transportation in the maximum amount specified in section 2(c) to be used by it exclusively to defray the financial cost of the transportation assistance projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Transportation the money as required and certified by it to be legally due and payable.

(d)  Redevelopment assistance.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Community and Economic Development in the maximum amount specified in section 2(d) to be used by it exclusively to defray the financial cost of the redevelopment assistance capital projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Community and Economic Development the money as required and certified by it to be legally due and payable.

(e)  Flood control.--The net proceeds of the sale of the obligations authorized in this act are hereby appropriated from the Capital Facilities Fund to the Department of Environmental Protection in the maximum amount specified in section 2(e) to be used by it exclusively to defray the financial cost of the flood control projects specifically itemized in a capital budget. After reserving or paying the expenses of the sale of the obligation, the State Treasurer shall pay to the Department of Environmental Protection the money as required and certified by it to be legally due and payable.

Section 13.  Federal funds.

(a)  Projects itemized in this act.--All money received from the Federal Government for the projects specifically itemized in this act are also hereby appropriated for those projects.

(b)  Projects not requiring itemization.--Department of Military and Veterans Affairs construction projects which are totally federally funded and to be administered by the Department of General Services are hereby authorized.

Section 14.  Editorial changes.

In editing and preparing this act for printing following the final enactment, the Legislative Reference Bureau shall insert or revise letters or numbers for projects where the letters or numbers are missing or require revision. The Legislative Reference Bureau shall also revise the total monetary amounts for the total authorization, debt authorization, appropriations and department totals as necessary to agree with the total monetary amounts of the projects.

Section 15.  Effective date.

This act shall take effect immediately.

Disclaimer: These codes may not be the most recent version. Pennsylvania may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.