2025 Oregon Revised Statutes
Volume : 19 - Utilities, Vehicle Code, Watercraft, Aviation
Chapter 757 - Utility Regulation Generally
Section 757.375 - Credit toward compliance with renewable portfolio standard; limits.

Universal Citation:
OR Rev Stat § 757.375 (2025)
Learn more This media-neutral citation is based on the American Association of Law Libraries Universal Citation Guide and is not necessarily the official citation.

(1) Any electricity produced from a solar photovoltaic energy system that is physically located in this state may be used by an electric company to comply with the renewable portfolio standard established under ORS 469A.005 to 469A.210.

(2) For each kilowatt-hour of electricity produced from a qualifying system that first becomes operational before January 1, 2016, and has a nameplate capacity of between 500 kilowatts and five megawatts of alternating current, the Public Utility Commission shall credit the electric company with two kilowatt-hours of qualifying electricity toward the electric company’s compliance with the renewable portfolio standard under ORS 469A.005 to 469A.210, up to a maximum of 20 megawatts of capacity. [2009 c.748 §4; 2016 c.28 §24]

Note: See note under 757.360.

Disclaimer: These codes may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.