2015 Oregon Revised Statutes
Volume : 17 - Utilities, Vehicle Code, Watercraft, Aviation, Constitutions
Chapter 758 - Utility Rights of Way and Territory Allocation; Cogeneration
Section 758.455 - Investigation by commission respecting contracts or applications; hearing procedure.

OR Rev Stat § 758.455 (2015) What's This?

(1) The Public Utility Commission may make such investigations respecting a contract or an application for the allocation of territory as the commission deems proper including the physical examinations and evaluations of the facilities and systems of the parties to the contract, estimates of their operating costs and revenues and studies of such other information as the commission deems pertinent.

(2) Insofar as applicable and consistent herewith, the provisions of ORS 756.500 to 756.610 shall govern the conduct of hearings.

(3) In considering competing applications to serve the same territory, there shall be a disputable presumption that applicants have an equal ability to extend, improve, enlarge, build, operate and maintain existing or proposed facilities.

[Formerly 757.655]

Disclaimer: These codes may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.