(1)(a) Except as provided in paragraph (e) of this subsection, the specifications for every contract for public works must contain a provision that states the existing state prevailing rate of wage and, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act (40 U.S.C. 3141 et seq.) that must be paid to workers in each trade or occupation that the contractor or subcontractor or other person who is a party to the contract uses in performing all or part of the contract. If the prevailing rates of wage are available electronically or are accessible on the Internet, the rates may be incorporated into the specifications by referring to the electronically accessible or Internet-accessible rates and by providing adequate information about how to access the rates.

(b) If a public agency under paragraph (a) of this subsection must include the state and federal prevailing rates of wage in the specifications, the public agency shall also require the contractor to pay the higher of the applicable state or federal prevailing rate of wage to all workers on the public works.

(c) Every contract and subcontract must provide that the workers must be paid not less than the specified minimum hourly rate of wage in accordance with ORS 279C.838 and 279C.840.

(d) If a public works project is subject both to ORS 279C.800 to 279C.870 and to the Davis-Bacon Act, every contract and subcontract must provide that workers on the public works must be paid not less than the higher of the applicable state or federal prevailing rate of wage.

(e) A public works project described in ORS 279C.800 (6)(a)(B) or (C) is subject to the existing state prevailing rate of wage or, if applicable, the federal prevailing rate of wage required under the Davis-Bacon Act that is in effect at the time a public agency enters into an agreement with a private entity for the project. After that time, the specifications for a contract for the public works must include the applicable prevailing rate of wage.

(2) The specifications for a contract for public works must provide that the contractor and every subcontractor must have a public works bond filed with the Construction Contractors Board before starting work on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9). Every contract that a contracting agency awards must require the contractor to:

(a) Have a public works bond filed with the Construction Contractors Board before starting work on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9).

(b) Require, in every subcontract, that the subcontractor have a public works bond filed with the Construction Contractors Board before starting work on the project, unless exempt under ORS 279C.836 (4), (7), (8) or (9).

[2003 c.794 §168; 2005 c.360 §10; 2007 c.415 §2; 2007 c.764 §37; 2007 c.844 §4; 2009 c.161 §2; 2011 c.265 §2]

Disclaimer: These codes may not be the most recent version. Oregon may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.