2017 Ohio Revised Code
Title [49] XLIX PUBLIC UTILITIES
Chapter 4906 - POWER SITING
Section 4906.13 - No local jurisdiction.

(A) As used in this section and sections 4906.20 and 4906.98 of the Revised Code, "economically significant wind farm" means wind turbines and associated facilities with a single interconnection to the electrical grid and designed for, or capable of, operation at an aggregate capacity of five or more megawatts but less than fifty megawatts. The term excludes any such wind farm in operation on June 24, 2008.

(B) No public agency or political subdivision of this state may require any approval, consent, permit, certificate, or other condition for the construction or operation of a major utility facility or economically significant wind farm authorized by a certificate issued pursuant to Chapter 4906. of the Revised Code. Nothing herein shall prevent the application of state laws for the protection of employees engaged in the construction of such facility or wind farm nor of municipal regulations that do not pertain to the location or design of, or pollution control and abatement standards for, a major utility facility or economically significant wind farm for which a certificate has been granted under this chapter.

Amended by 132nd General Assembly File No. TBD, HB 49, §101.01, eff. 9/29/2017.

Effective Date: 10-23-1972; 2008 HB562 06-24-2008 .

Disclaimer: These codes may not be the most recent version. Ohio may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.
This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.