2011 Ohio Revised Code
Title [37] XXXVII HEALTH - SAFETY - MORALS
Chapter 3772: CASINO GAMING
3772.27 [Effective Until 10/17/2011] Initial investment.


OH Rev Code § 3772.27 What's This?

Each initial licensed casino operator of each of the four casino facilities shall make an initial investment of at least two hundred fifty million dollars for the development of each casino facility.

If a casino operator has made an initial investment of at least one hundred twenty-five million dollars at the time a license is issued, the casino operator shall spend the remainder of the minimum two-hundred-fifty-million-dollar total required initial investment within thirty-six months after the issuance of that license. If a casino operator who has opened an initial location is making substantial progress, as determined by the commission, on a substitute casino facility on constitutionally approved parcels within the same city, the commission shall include amounts spent by the casino operator to develop such parcels, and shall grant an additional thirty-six-month extension to the casino operator who is developing on such parcels. The commission, upon the request of the casino operator, may also approve up to twenty-four months of transitional operations by the casino operator on multiple noncontiguous constitutionally approved parcels while transitioning from the initial location to the new facility, provided such facilities are connected by property and structures, owned, leased, or under the exclusive control of the casino operator.

Added by 128th General Assembly File No. 38, HB 519, § 1, eff. 9/10/2010.

This section is set out twice. See also § 3772.27, as amended by 129th General Assembly File No. 44, HB 277, § 1, eff. 10/17/2011.

3772.27 [Effective 10/17/2011] Initial investment

(A) Each initial licensed casino operator of each of the four casino facilities shall make an initial investment of at least two hundred fifty million dollars for the development of each casino facility.

(B) If a casino operator has made an initial investment of at least one hundred twenty-five million dollars at the time a license is issued, the casino operator shall spend the remainder of the minimum two-hundred-fifty-million-dollar total required initial investment within thirty-six months after the issuance of that license.

(C) A licensed casino operator may open a casino facility in phases and may have gaming areas in one or more buildings, facilities, rooms, or areas that together constitute a single casino facility within the boundaries of one or more of the properties described in Section 6(C)(9) of Article XV, Ohio Constitution, and, if located on more than one of those properties, is connected by one or more of the following:

(1) Property owned by the casino operator or any of its affiliates;

(2) Property leased by the casino operator or any of its affiliates;

(3) Access over property under the right of the casino operator or any of its affiliates, whether it be by skyways, walkways, roadways, easements, or rights of way;

(4) Nongaming amenities.

Amended by 129th General Assembly File No. 44, HB 277, § 1, eff. 10/17/2011.

Added by 128th General Assembly File No. 38, HB 519, § 1, eff. 9/10/2010.

This section is set out twice. See also § 3772.27, effective until 10/17/2011.

Disclaimer: These codes may not be the most recent version. Ohio may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.