2016 New York Laws
RRD - Railroad
Article 3 - (Railroad) CONSTRUCTION, OPERATION AND MANAGEMENT
53-F - Joint inspection of traffic-control signals interconnected with highway-rail at-grade crossing warning systems.

NY RR L § 53-F (2016) What's This?

53-f. Joint inspection of traffic-control signals interconnected with highway-rail at-grade crossing warning systems. 1. Notwithstanding the provisions of any other law to the contrary, the commissioner is authorized to establish, implement, and exercise oversight over a program to coordinate the inspection of traffic-control signals interconnected with highway-rail at-grade crossing warning systems.

2. Pursuant to the program established under subdivision one of this section, the department of transportation shall establish a procedure applicable to every railroad corporation and each municipality having jurisdiction of a highway on which there is an at-grade rail crossing warning system interconnected with a traffic-control signal for the coordinated operation and biennial inspection of any traffic-control signal interconnected with a highway-rail at-grade crossing warning system. Nothing in this section shall be deemed to alter or impair such railroad corporation's existing responsibility for maintenance of, and access to, the highway-rail at-grade crossing warning system.

3. For the purposes of this section, the term "traffic-control signal" shall have the same meaning as such term is defined by section one hundred fifty-four of the vehicle and traffic law.


Disclaimer: These codes may not be the most recent version. New York may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.