2015 New Mexico Statutes
Chapter 72 - Water Law
Section 5 Appropriation and Use of Surface Water
Section 72-5-8 Construction of works; additional time.

NM Stat § 72-5-8 (2015) What's This?

72-5-8. Construction of works; additional time.

Construction of works shall be diligently prosecuted in order that the project may be completed within the time limit set by the state engineer in the permit, provided that the state engineer may upon the request of the applicant allow additional time for the completion of works equal to the time during which work was prevented by acts of God, operation of law or other causes beyond the control of the applicant.

History: Laws 1907, ch. 49, 29; Code 1915, 5687; C.S. 1929, 151-138; Laws 1941, ch. 126, 11; 1941 Comp., 77-507; 1953 Comp., 75-5-7.

Disclaimer: These codes may not be the most recent version. New Mexico may have more current or accurate information. We make no warranties or guarantees about the accuracy, completeness, or adequacy of the information contained on this site or the information linked to on the state site. Please check official sources.

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.